{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,15]],"date-time":"2025-12-15T14:06:41Z","timestamp":1765807601992,"version":"3.37.3"},"reference-count":40,"publisher":"Wiley","issue":"5","license":[{"start":{"date-parts":[[2018,6,28]],"date-time":"2018-06-28T00:00:00Z","timestamp":1530144000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/onlinelibrary.wiley.com\/termsAndConditions#vor"}],"funder":[{"DOI":"10.13039\/100007225","name":"Ministry of Science and Technology","doi-asserted-by":"publisher","award":["MOST 105\u20102221\u2010E\u2010035\u2010074"],"award-info":[{"award-number":["MOST 105\u20102221\u2010E\u2010035\u2010074"]}],"id":[{"id":"10.13039\/100007225","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100006403","name":"Feng Chia University","doi-asserted-by":"publisher","award":["14I42315"],"award-info":[{"award-number":["14I42315"]}],"id":[{"id":"10.13039\/501100006403","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Comp Applic In Engineering"],"published-print":{"date-parts":[[2018,9]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:sec><jats:label\/><jats:p>The critical path method is the primary technique for project scheduling in construction engineering. However, the development of enterprises outside Taiwan has recently encountered difficulties in personnel dispatch and human resource acquisition. The management of time schedules without the consideration of human resource configuration may cause enterprises to make unrealistic decisions. Hence, the problems of project scheduling with limited human resources have been increasingly attracting attention from construction enterprises. Based on limited human resource configuration, this study uses computer aided design tool with a linear programming method to conduct a project scheduling for the optimal model with minimized costs for construction engineering applications. We find that the programming trial balance can effectively solve the problem of limited human resource configuration and compute the lowest construction costs. Specifically, the lowest cost obtained from the programming solution is RMB 25,315,752, which is RMB 1,920,632 lower than that in the former solution without resource constraints. Further, the scheduling procedure obtained by using the shortest path method connects with the programming trial balance to resolve the problem by changing the decision variables and relevant data, whose connection is easier and more convenient than under the pure critical path method. Moreover, according to the idea of CDIO engineering education, allowing the students to participate in scientific research project and scientific and technological innovation activities of different levels and types, it improves students\u2019 learning capacity, innovation capability, cooperation capability, and engineering practical ability.<\/jats:p><\/jats:sec>","DOI":"10.1002\/cae.21999","type":"journal-article","created":{"date-parts":[[2018,6,28]],"date-time":"2018-06-28T18:44:23Z","timestamp":1530211463000},"page":"1255-1269","update-policy":"https:\/\/doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["CAD of human resource configuration in project scheduling for construction engineering applications"],"prefix":"10.1002","volume":"26","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-4060-8558","authenticated-orcid":false,"given":"Jeng\u2010Wen","family":"Lin","sequence":"first","affiliation":[{"name":"Department of Civil Engineering Feng Chia University Taichung Taiwan"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Pu Fun","family":"Shen","sequence":"additional","affiliation":[{"name":"T.Y. Lin Taiwan Consulting Engineers, Inc. Taipei Taiwan"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bing\u2010Jean","family":"Lee","sequence":"additional","affiliation":[{"name":"Department of Civil Engineering Feng Chia University Taichung Taiwan"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"311","published-online":{"date-parts":[[2018,6,28]]},"reference":[{"volume-title":"An introduction to management science: Quantitative approaches to decision making","year":"2015","author":"Anderson D. R.","key":"e_1_2_7_2_1"},{"key":"e_1_2_7_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2013.09.040"},{"key":"e_1_2_7_4_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000363"},{"key":"e_1_2_7_5_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000323"},{"key":"e_1_2_7_6_1","doi-asserted-by":"publisher","DOI":"10.1080\/0305215X.2014.892594"},{"key":"e_1_2_7_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2007.03.039"},{"key":"e_1_2_7_8_1","doi-asserted-by":"publisher","DOI":"10.1002\/hrm.21602"},{"key":"e_1_2_7_9_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1984)110:4(437)"},{"key":"e_1_2_7_10_1","first-page":"1","article-title":"The construction of human resource management cloud service platform","volume":"7","author":"Dai L.","year":"2015","journal-title":"Intell. Inform. Manag"},{"key":"e_1_2_7_11_1","doi-asserted-by":"publisher","DOI":"10.3846\/13923730.2013.801909"},{"key":"e_1_2_7_12_1","doi-asserted-by":"publisher","DOI":"10.1002\/cae.20314"},{"key":"e_1_2_7_13_1","doi-asserted-by":"publisher","DOI":"10.1002\/net.10090"},{"key":"e_1_2_7_14_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000243"},{"volume-title":"Principles of operations management: Sustainability and supply chain management","year":"2016","author":"Heizer J.","key":"e_1_2_7_15_1"},{"volume-title":"Introduction to management science: A modeling and case studies approach with spreadsheets","year":"2008","author":"Hillier F. S.","key":"e_1_2_7_16_1"},{"key":"e_1_2_7_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2013.10.005"},{"key":"e_1_2_7_18_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000368"},{"key":"e_1_2_7_19_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:3(330)"},{"volume-title":"The critical\u2010path method: Resources planning and scheduling. Industrial Scheduling","year":"1963","author":"Kelley J. E.","key":"e_1_2_7_20_1"},{"key":"e_1_2_7_21_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.848479"},{"key":"e_1_2_7_22_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:3(310)"},{"key":"e_1_2_7_23_1","doi-asserted-by":"publisher","DOI":"10.1002\/cae.20178"},{"key":"e_1_2_7_24_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2000)126:3(219)"},{"key":"e_1_2_7_25_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:4(412)"},{"key":"e_1_2_7_26_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2011.12.009"},{"key":"e_1_2_7_27_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1998)124:3(232)"},{"key":"e_1_2_7_28_1","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-45253-2_30"},{"key":"e_1_2_7_29_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000338"},{"key":"e_1_2_7_30_1","doi-asserted-by":"publisher","DOI":"10.12720\/joams.2.3.228-231"},{"volume-title":"CPM in Construction Management","year":"2010","author":"O'Brien J. J.","key":"e_1_2_7_31_1"},{"volume-title":"Project management for engineering and construction","year":"1993","author":"Oberlender G. D.","key":"e_1_2_7_32_1"},{"key":"e_1_2_7_33_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000186"},{"key":"e_1_2_7_34_1","first-page":"331","article-title":"A decision aid approach for optimisation problems involving several economic functions","volume":"2","author":"Rangoaga M. J.","year":"2012","journal-title":"Am. J. Op. Res"},{"key":"e_1_2_7_35_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1998)124:1(72)"},{"key":"e_1_2_7_36_1","doi-asserted-by":"publisher","DOI":"10.1177\/0734242X14565208"},{"key":"e_1_2_7_37_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jwb.2013.11.011"},{"key":"e_1_2_7_38_1","doi-asserted-by":"publisher","DOI":"10.1166\/asl.2014.5687"},{"key":"e_1_2_7_39_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2001)127:5(374)"},{"key":"e_1_2_7_40_1","first-page":"2187","article-title":"The construction and practice of classified talent cultivation system combining with professional certification","volume":"12","author":"Yang J.","year":"2016","journal-title":"Eurasia J. Math. Sci. T"},{"key":"e_1_2_7_41_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000209"}],"container-title":["Computer Applications in Engineering Education"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.wiley.com\/onlinelibrary\/tdm\/v1\/articles\/10.1002%2Fcae.21999","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1002\/cae.21999","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,12]],"date-time":"2023-09-12T14:54:13Z","timestamp":1694530453000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1002\/cae.21999"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,6,28]]},"references-count":40,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2018,9]]}},"alternative-id":["10.1002\/cae.21999"],"URL":"https:\/\/doi.org\/10.1002\/cae.21999","archive":["Portico"],"relation":{},"ISSN":["1061-3773","1099-0542"],"issn-type":[{"type":"print","value":"1061-3773"},{"type":"electronic","value":"1099-0542"}],"subject":[],"published":{"date-parts":[[2018,6,28]]},"assertion":[{"value":"2017-12-13","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2018-05-05","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2018-06-28","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}