{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,21]],"date-time":"2026-11-21T02:51:05Z","timestamp":1795229465637,"version":"4.10.3"},"reference-count":74,"publisher":"Wiley","issue":"7","license":[{"start":{"date-parts":[[2025,6,20]],"date-time":"2025-06-20T00:00:00Z","timestamp":1750377600000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/onlinelibrary.wiley.com\/termsAndConditions#vor"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["72171166"],"award-info":[{"award-number":["72171166"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["72231005"],"award-info":[{"award-number":["72231005"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["72261147706"],"award-info":[{"award-number":["72261147706"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Quality &amp; Reliability Eng"],"published-print":{"date-parts":[[2025,11]]},"abstract":"<jats:title>ABSTRACT<\/jats:title><jats:p>Unsatisfactory assembly precision has been a persistent quality problem in the automotive industry. This paper aims to deploy the Lean Six Sigma (LSS) methodology to facilitate improvements in assembly precision for a component manufacturer in the new energy vehicle (NEV) industry, from the perspective of Chinese small and medium\u2010sized enterprises (SMEs). The case study method was chosen for this purpose. The Six Sigma\u2010based framework of the Define\u2010Measure\u2010Analyze\u2010Improve\u2010Control (DMAIC) methodology was adopted. Critical steps and significant factors were identified to detect the quality problem and improve the low assembly precision. The results provided solid evidence of how LSS can be successfully applied as a first step in SME. Our findings showed that heating temperature, preservation time, and installation time were significant factors hindering assembly precision. The results indicated that establishing a quality team with qualified employees was necessary to sustain continuous improvement. Our case study enriches the literature with empirical insights on how LSS implementation in NEV component manufacturing can be approached from the unique perspective of Chinese SMEs. These insights can be applied to demonstrate how SMEs respond to new technologies or practices when quality improvement is needed.<\/jats:p>","DOI":"10.1002\/qre.70001","type":"journal-article","created":{"date-parts":[[2025,6,20]],"date-time":"2025-06-20T13:49:00Z","timestamp":1750427340000},"page":"2897-2908","update-policy":"https:\/\/doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Deploying Lean Six Sigma to Improve Assembly Precision of NEV Component: Evidence from Chinese SME"],"prefix":"10.1002","volume":"41","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3350-761X","authenticated-orcid":false,"given":"Yingxue","family":"Ren","sequence":"first","affiliation":[{"name":"Business School, Nankai University  Tianjin China"},{"name":"School of Economics and\u00a0Management TianGong University  Tianjin China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Baoping","family":"Zhang","sequence":"additional","affiliation":[{"name":"School of Economics and\u00a0Management TianGong University  Tianjin China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Min","family":"Zhang","sequence":"additional","affiliation":[{"name":"College of Management and Economics Tianjin University  Tianjin China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Fengqiang","family":"Hu","sequence":"additional","affiliation":[{"name":"Zeshi Technology Development Co., Ltd.  Yancheng Jiangsu China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Hanwen","family":"Huang","sequence":"additional","affiliation":[{"name":"Business School, Nankai University  Tianjin China"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"311","published-online":{"date-parts":[[2025,6,20]]},"reference":[{"key":"e_1_2_9_2_1","volume-title":"\u8d28\u91cf\u5f3a\u56fd(zh\u00ecli\u00e0ng qi\u00e1nggu\u00f3): Great Power of Quality","author":"Daily C.","year":"2023"},{"key":"e_1_2_9_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.scitotenv.2023.167584"},{"key":"e_1_2_9_4_1","unstructured":"KPMG.2020 China Leading Autotech 50(2021)."},{"key":"e_1_2_9_5_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2018.11.124"},{"key":"e_1_2_9_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2016.11.211"},{"key":"e_1_2_9_7_1","unstructured":"IEA.Global EV Outlook 2023: Catching Up with Climate Ambition(2023)."},{"key":"e_1_2_9_8_1","unstructured":"Xinhuanet.Exceeding 30 Million! The Number of New Energy Vehicles in China is Growing at a High Speed. [Online]. Xinhuanet (2025) https:\/\/www.gov.cn\/zhengce\/jiedu\/tujie\/202501\/content_6999527.htm."},{"key":"e_1_2_9_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.erss.2023.103359"},{"key":"e_1_2_9_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.egyr.2022.09.082"},{"key":"e_1_2_9_11_1","unstructured":"N.Andrei.Electric Vehicle Sales Surge in Europe Except For Tesla [Online]. insideevs (2025) https:\/\/insideevs.com\/news\/751787\/january\u2010car\u2010sales\u2010eu\u2010evs\/."},{"key":"e_1_2_9_12_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2020.111484"},{"key":"e_1_2_9_13_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.114264"},{"key":"e_1_2_9_14_1","doi-asserted-by":"publisher","DOI":"10.1080\/09537287.2018.1501810"},{"key":"e_1_2_9_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2019.02.017"},{"key":"e_1_2_9_16_1","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2018.2886316"},{"issue":"4","key":"e_1_2_9_17_1","first-page":"3719","article-title":"Acoustic Noise Mitigation of Switched Reluctance Machines with Windows on Stator and Rotor Poles","volume":"56","author":"Gundogmus O.","year":"2020","journal-title":"IEEE Transactions on Industry Applications"},{"key":"e_1_2_9_18_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-10-2020-0684"},{"key":"e_1_2_9_19_1","doi-asserted-by":"publisher","DOI":"10.1080\/10686967.2022.2144784"},{"issue":"3","key":"e_1_2_9_20_1","first-page":"1","article-title":"Integration of Industry 4.0 Technologies Into Lean Six Sigma DMAIC: A Systematic Review","volume":"35","author":"Pongboonchai\u2010Empl T.","year":"2023","journal-title":"Production Planning & Control"},{"key":"e_1_2_9_21_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2021.1973891"},{"key":"e_1_2_9_22_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2024.2315427"},{"issue":"11","key":"e_1_2_9_23_1","first-page":"1","article-title":"A Novel and Practical Conceptual Framework to Support Lean Six Sigma Deployment in Manufacturing SMEs","volume":"33","author":"Alexander P.","year":"2021","journal-title":"Total Quality Management & Business Excellence"},{"key":"e_1_2_9_24_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2017.1422977"},{"key":"e_1_2_9_25_1","doi-asserted-by":"crossref","unstructured":"M. S.Nadeem R. N.Lodhi andZ.Malik \u201cEvaluation of Impact of Lean Management Practices on Dairy Business Performance \u201dInternational Journal of Lean Six Sigma ahead of print (2024).","DOI":"10.1108\/IJLSS-04-2023-0068"},{"key":"e_1_2_9_26_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJPPM-12-2021-0681"},{"key":"e_1_2_9_27_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2023.2275213"},{"key":"e_1_2_9_28_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2016.1213627"},{"key":"e_1_2_9_29_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2015.04.053"},{"key":"e_1_2_9_30_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.matpr.2019.11.139"},{"key":"e_1_2_9_31_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-06-2023-0492"},{"key":"e_1_2_9_32_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2024.2324950"},{"key":"e_1_2_9_33_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2024.2315442"},{"issue":"4","key":"e_1_2_9_34_1","first-page":"1","article-title":"Total Quality Management, Organizational Agility and Service Quality: Addressing the Needs for Small and Medium Enterprises (SMEs)","volume":"36","author":"Albadry O.","year":"2025","journal-title":"Total Quality Management & Business Excellence"},{"key":"e_1_2_9_35_1","doi-asserted-by":"publisher","DOI":"10.1007\/s42524-024-4130-7"},{"key":"e_1_2_9_36_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-09-2022-0592"},{"key":"e_1_2_9_37_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.2021.02026"},{"issue":"2","key":"e_1_2_9_38_1","first-page":"1","article-title":"Lean Six Sigma and Industry 4.0 Implementation Framework for Operational Excellence: A Case Study","volume":"35","author":"Tissir S.","year":"2024","journal-title":"Total Quality Management & Business Excellence"},{"key":"e_1_2_9_39_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJLSS-05-2023-0090"},{"key":"e_1_2_9_40_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2024.2302588"},{"key":"e_1_2_9_41_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJLSS-03-2019-0026"},{"key":"e_1_2_9_42_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-07-2021-0428"},{"key":"e_1_2_9_43_1","doi-asserted-by":"crossref","unstructured":"O.McDermott J. S.Tansha A.Trubetskaya A.Rosa andR.Moran \u201cDigital Marketing Process Enhancement in an Online Store Utilising a Combination of Design of Experiments and Lean Six Sigma \u201dInternational Journal of Lean Six Sigma ahead of print (2025).","DOI":"10.1108\/IJLSS-03-2024-0065"},{"key":"e_1_2_9_44_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJLSS-02-2024-255"},{"key":"e_1_2_9_45_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJLSS-08-2021-0136"},{"key":"e_1_2_9_46_1","volume-title":"Case Study Research: Design and Methods","author":"Yin R. K.","year":"2009"},{"key":"e_1_2_9_47_1","doi-asserted-by":"publisher","DOI":"10.1080\/09537287.2019.1654628"},{"issue":"3","key":"e_1_2_9_48_1","first-page":"219","article-title":"Comprehensive Six Sigma Application: A Case Study","volume":"26","author":"Zhang M.","year":"2015","journal-title":"Production Planning & Control"},{"key":"e_1_2_9_49_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-04-2022-0259"},{"key":"e_1_2_9_50_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-09-2020-0645"},{"key":"e_1_2_9_51_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJQRM-05-2017-0098"},{"key":"e_1_2_9_52_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2021.127039"},{"key":"e_1_2_9_53_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jom.2007.06.007"},{"key":"e_1_2_9_54_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-88-470-2492-2_1"},{"key":"e_1_2_9_55_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJLSS-03-2016-0014"},{"issue":"5","key":"e_1_2_9_56_1","first-page":"1","article-title":"Six Sigma and Operational Absorptive Capacity: The Role of Project Leader","volume":"33","author":"Arumugam V.","year":"2020","journal-title":"Total Quality Management & Business Excellence"},{"key":"e_1_2_9_57_1","doi-asserted-by":"publisher","DOI":"10.1108\/17410380510600518"},{"key":"e_1_2_9_58_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jii.2023.100515"},{"key":"e_1_2_9_59_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJPPM-03-2019-0128"},{"key":"e_1_2_9_60_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2017.1360134"},{"key":"e_1_2_9_61_1","volume-title":"Statistics for Experimenters: An Introduction to Design, Data Analysis, and Model Building","author":"Box G. P.","year":"2014"},{"key":"e_1_2_9_62_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJLSS-04-2015-0013"},{"key":"e_1_2_9_63_1","doi-asserted-by":"publisher","DOI":"10.1080\/08982112.2018.1437448"},{"key":"e_1_2_9_64_1","doi-asserted-by":"publisher","DOI":"10.1080\/08982112.2021.1969665"},{"key":"e_1_2_9_65_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2020.1727044"},{"key":"e_1_2_9_66_1","doi-asserted-by":"publisher","DOI":"10.1080\/09537287.2010.537286"},{"key":"e_1_2_9_67_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2022.2043740"},{"key":"e_1_2_9_68_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-08-2022-0475"},{"key":"e_1_2_9_69_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-06-2022-0370"},{"key":"e_1_2_9_70_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJPPM-12-2017-0343"},{"key":"e_1_2_9_71_1","doi-asserted-by":"publisher","DOI":"10.1080\/08982112.2018.1475674"},{"key":"e_1_2_9_72_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2016.1187995"},{"key":"e_1_2_9_73_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJLSS-09-2017-0109"},{"key":"e_1_2_9_74_1","doi-asserted-by":"publisher","DOI":"10.1080\/08982112.2018.1464657"},{"issue":"1","key":"e_1_2_9_75_1","first-page":"1","article-title":"Understanding and Addressing Complexity in Problem Solving","volume":"33","author":"Hoerl R.","year":"2021","journal-title":"Quality Engineering"}],"container-title":["Quality and Reliability Engineering International"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1002\/qre.70001","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,1]],"date-time":"2025-10-01T08:54:42Z","timestamp":1759308882000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1002\/qre.70001"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,6,20]]},"references-count":74,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2025,11]]}},"alternative-id":["10.1002\/qre.70001"],"URL":"https:\/\/doi.org\/10.1002\/qre.70001","archive":["Portico"],"relation":{},"ISSN":["0748-8017","1099-1638"],"issn-type":[{"value":"0748-8017","type":"print"},{"value":"1099-1638","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,6,20]]},"assertion":[{"value":"2024-12-24","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-06-03","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-06-20","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}