{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,10,23]],"date-time":"2023-10-23T06:41:28Z","timestamp":1698043288192},"reference-count":16,"publisher":"Wiley","issue":"6","license":[{"start":{"date-parts":[[2007,3,21]],"date-time":"2007-03-21T00:00:00Z","timestamp":1174435200000},"content-version":"vor","delay-in-days":6867,"URL":"http:\/\/onlinelibrary.wiley.com\/termsAndConditions#vor"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Systems &amp; Computers in Japan"],"published-print":{"date-parts":[[1988,6]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>In most cases, the scheduling problem for the multiprocessor system is NP\u2010 or strong NP\u2010hard. For this problem, we have already proposed a practical optimization algorithm DF\/IHS (Depth First\/Implicit Heuristic Search), which combines the list\u2010scheduling algorithm and the depth\u2010first search, for the minimum parallel processing time multiprocessors scheduling problem. This paper presents a result of application of DF\/IHS to the minimum total weighted flow time problem, which is used in the optimization of memory utilization. The problem of allocating tasks to <jats:italic>m<\/jats:italic> processors is considered with or without precedence constraints among the tasks. It was verified that the DF\/IHS can be applied to this kind of problem very effectively, where the optimal or highly accurate approximate solution is obtained for the large\u2010scale problem with several hundreds of tasks.<\/jats:p>","DOI":"10.1002\/scj.4690190603","type":"journal-article","created":{"date-parts":[[2007,7,7]],"date-time":"2007-07-07T15:16:51Z","timestamp":1183821411000},"page":"25-34","source":"Crossref","is-referenced-by-count":1,"title":["Application of df\/ihs to minimum total weighted flow time multiprocessor scheduling problems"],"prefix":"10.1002","volume":"19","author":[{"given":"Hironori","family":"Kasahara","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Munenori","family":"Kai","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Seinosuke","family":"Narita","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hidehiko","family":"Wada","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"311","published-online":{"date-parts":[[2007,3,21]]},"reference":[{"key":"e_1_2_1_2_2","volume-title":"Computer and Job\u2010Shop Scheduling Theory","author":"Coffman E. G.","year":"1976"},{"key":"e_1_2_1_3_2","doi-asserted-by":"publisher","DOI":"10.1109\/TC.1984.1676376"},{"key":"e_1_2_1_4_2","doi-asserted-by":"publisher","DOI":"10.1109\/JRA.1985.1087004"},{"issue":"5","key":"e_1_2_1_5_2","first-page":"363","article-title":"Minimum mean\u2010weighted holding time scheduling problem","volume":"62","author":"Kawaguchi","journal-title":"Trans. (D), I.E.C.E., Japan"},{"key":"e_1_2_1_6_2","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.6.1.1"},{"key":"e_1_2_1_7_2","volume-title":"Theory of Scheduling","author":"Conway R. W.","year":"1967"},{"key":"e_1_2_1_8_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0167-5060(08)70743-X"},{"key":"e_1_2_1_9_2","doi-asserted-by":"publisher","DOI":"10.1137\/0125042"},{"key":"e_1_2_1_10_2","first-page":"75","article-title":"Sequencing jobs to minimize total weighted completion time subject to precedence constraintsm","volume":"5","author":"Lawler E. L.","year":"1979","journal-title":"Annals of Discrete Math."},{"key":"e_1_2_1_11_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0167-5060(08)70356-X"},{"key":"e_1_2_1_12_2","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.11.2.268"},{"issue":"93","key":"e_1_2_1_13_2","article-title":"List\u2010Scheduling for minimum\u2010mean weighted holding time problem (2), Papers of Tech","volume":"58","author":"Kawaguchi","year":"1985","journal-title":"Group on Circuits and Systems, I.E.C.E., Japan"},{"issue":"93","key":"e_1_2_1_14_2","article-title":"Parallel processing of robot control computation using multiprocessor scheduling algorithmm","volume":"85","author":"Kasahara H.","year":"1985","journal-title":"Robotic Soc. Jap."},{"key":"e_1_2_1_15_2","doi-asserted-by":"publisher","DOI":"10.7210\/jrsj.2.387"},{"key":"e_1_2_1_16_2","doi-asserted-by":"publisher","DOI":"10.1145\/321796.321808"},{"key":"e_1_2_1_17_2","volume-title":"Theory of combinational optimization","author":"Ibaraki T.","year":"1979"}],"container-title":["Systems and Computers in Japan"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.wiley.com\/onlinelibrary\/tdm\/v1\/articles\/10.1002%2Fscj.4690190603","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1002\/scj.4690190603","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,10,22]],"date-time":"2023-10-22T09:19:00Z","timestamp":1697966340000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1002\/scj.4690190603"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1988,6]]},"references-count":16,"journal-issue":{"issue":"6","published-print":{"date-parts":[[1988,6]]}},"alternative-id":["10.1002\/scj.4690190603"],"URL":"https:\/\/doi.org\/10.1002\/scj.4690190603","archive":["Portico"],"relation":{},"ISSN":["0882-1666","1520-684X"],"issn-type":[{"value":"0882-1666","type":"print"},{"value":"1520-684X","type":"electronic"}],"subject":[],"published":{"date-parts":[[1988,6]]}}}