{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,13]],"date-time":"2026-10-13T18:15:30Z","timestamp":1791915330012,"version":"4.3.4"},"reference-count":28,"publisher":"Wiley","issue":"4","license":[{"start":{"date-parts":[[2020,1,9]],"date-time":"2020-01-09T00:00:00Z","timestamp":1578528000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Global Challenges"],"published-print":{"date-parts":[[2020,4]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>A large\u2010scale solar photovoltaic system (LSS PV) aims to reduce the gap as Malaysia plans to shift electricity generation from conventional sources like fossil fuels to renewable energy sources. The government plans to increase renewable energy to 20% of the generation mix by 2025. The first and second round of Malaysia's LSS programme has 958 MW of PV projects to be realized by 2020. The third round of the LSS program goes for an aggregate capacity of 500 MW. Being an intermittent source of energy, the major complication is with grid integration of the LSS PV system into the national power grid. This research aims to identify an optimum power system management scheme for LSS in Malaysia to stabilize voltage fluctuations by utilizing IEEE bus configuration. The simulation and planning of network type is based on PSS\/E and PVSyst. The expected outcome of this research is to develop a solution for LSS grid integration with minimal loss in the system and in accordance with electricity standards as per Malaysian grid code. Additionally, the harmony of incorporating power electronic devices for reactive power compensation is tested. This work can be stated as a reference model for utility provider in other countries having similar network and grid configuration.<\/jats:p>","DOI":"10.1002\/gch2.201900093","type":"journal-article","created":{"date-parts":[[2020,1,9]],"date-time":"2020-01-09T15:57:40Z","timestamp":1578585460000},"update-policy":"https:\/\/doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":25,"title":["Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique"],"prefix":"10.1002","volume":"4","author":[{"given":"Mahesh","family":"Mohanan","sequence":"first","affiliation":[{"name":"School of Engineering and Physical Sciences Heriot\u2010Watt University Malaysia  62200 Putrajaya Malaysia"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9672-7519","authenticated-orcid":false,"given":"Yun Ii","family":"Go","sequence":"additional","affiliation":[{"name":"School of Engineering and Physical Sciences Heriot\u2010Watt University Malaysia  62200 Putrajaya Malaysia"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"311","published-online":{"date-parts":[[2020,1,9]]},"reference":[{"key":"e_1_2_7_1_1","unstructured":"National Renewable Energy Policy \u2010 SEDA http:\/\/www.seda.gov.my\/policies\/national\u2010renewable\u2010energy\u2010policy\u2010and\u2010action\u2010plan\u20102009(accessed: August2019)."},{"key":"e_1_2_7_2_1","volume-title":"2017 Malaysia Energy Statistics Handbook","year":"2017"},{"key":"e_1_2_7_3_1","unstructured":"MIDA Malaysian Investment Development Authority https:\/\/www.mida.gov.my\/home\/8614\/news\/cypark\u2010to\u2010bid\u2010for\u2010100mw\u2010solar\u2010project\u2010under\u2010scheme\u2010\/(accessed: August 2019)."},{"key":"e_1_2_7_4_1","unstructured":"Intended Nationally Determined Contribution Of The Government Of Malaysia 2015."},{"key":"e_1_2_7_5_1","volume-title":"Installation Of Grid\u2010Connected Photovoltaic (PV) System","year":"2010"},{"key":"e_1_2_7_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/B978-0-12-804004-1.00010-5"},{"key":"e_1_2_7_7_1","unstructured":"S.Mekhilef S.Abujarad S.Ghazi F.Shadman Technical Issues of Grid Connected Renewable Energy Sources \u2010 A New Areas of Research 2014."},{"key":"e_1_2_7_8_1","first-page":"22","volume":"4","author":"Yasmeena S.","year":"2015","journal-title":"Int. J. Energy Power Eng."},{"key":"e_1_2_7_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.egypro.2017.05.112"},{"key":"e_1_2_7_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2016.05.082"},{"key":"e_1_2_7_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/B978-0-08-101124-9.00018-8"},{"key":"e_1_2_7_12_1","unstructured":"L.Agnes Siau Wei master's thesis Universiti Tun Hussein Onn Malaysia2014."},{"key":"e_1_2_7_13_1","doi-asserted-by":"publisher","DOI":"10.14810\/ecij.2014.3204"},{"key":"e_1_2_7_14_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2019.01.044"},{"key":"e_1_2_7_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.esd.2019.02.007"},{"key":"e_1_2_7_16_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2016.10.036"},{"key":"e_1_2_7_17_1","first-page":"1","volume-title":"SoutheastCon 2015","author":"Youssef E.","year":"2015"},{"key":"e_1_2_7_18_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.matcom.2018.09.016"},{"key":"e_1_2_7_19_1","first-page":"666","volume":"1","author":"Mohanty A.","year":"2019","journal-title":"Int. J. Mod. Eng. Res."},{"key":"e_1_2_7_20_1","doi-asserted-by":"publisher","DOI":"10.3390\/en12081425"},{"key":"e_1_2_7_21_1","first-page":"81","volume":"4","author":"Narain A.","year":"2015","journal-title":"Int. J. Eng. Res. Technol."},{"key":"e_1_2_7_22_1","first-page":"168","volume-title":"Grid Code For Peninsular Malaysia","year":"2016"},{"key":"e_1_2_7_23_1","unstructured":"Solar resource maps of Malaysia https:\/\/solargis.com\/maps\u2010and\u2010gis\u2010data\/download\/malaysia(accessed: August 2019)."},{"key":"e_1_2_7_24_1","unstructured":"Request For Proposal (RFP) For The Development Of Large Scale Solar Photovoltaic (LSS PV) Plants In Peninsular Malaysia And Sabah For Commercial Operation In 2017\u20132018 \u2010 Announcement Of Shortlisted Bidder 1st ed. Suruhanjaya Tenaga Putrajaya Malaysia2017."},{"key":"e_1_2_7_25_1","first-page":"61","volume":"19","author":"Ahmed T.","year":"2019","journal-title":"Int. Energy J."},{"key":"e_1_2_7_26_1","author":"McGlashan K. B.","year":"2017","journal-title":"An Economic Analysis of Injecting Energy Storage into Power Systems Containing Renewables."},{"key":"e_1_2_7_27_1","unstructured":"PSS E \u2010 Siemens https:\/\/studylib.net\/doc\/18212045\/pss\u2010e\u2014siemens(accessed: August 2019)."},{"key":"e_1_2_7_28_1","first-page":"1","volume":"8","author":"Gupta M.","year":"2018","journal-title":"Int. J. Eng. Res. Appl."}],"container-title":["Global Challenges"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.wiley.com\/onlinelibrary\/tdm\/v1\/articles\/10.1002%2Fgch2.201900093","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1002\/gch2.201900093","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/full-xml\/10.1002\/gch2.201900093","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1002\/gch2.201900093","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,7]],"date-time":"2023-09-07T02:12:37Z","timestamp":1694052757000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1002\/gch2.201900093"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,1,9]]},"references-count":28,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2020,4]]}},"alternative-id":["10.1002\/gch2.201900093"],"URL":"https:\/\/doi.org\/10.1002\/gch2.201900093","archive":["Portico"],"relation":{},"ISSN":["2056-6646","2056-6646"],"issn-type":[{"value":"2056-6646","type":"print"},{"value":"2056-6646","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,1,9]]},"assertion":[{"value":"2019-11-17","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2020-01-09","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"1900093"}}