{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,4,8]],"date-time":"2024-04-08T05:53:15Z","timestamp":1712555595172},"reference-count":30,"publisher":"Wiley","issue":"5","license":[{"start":{"date-parts":[[2022,3,25]],"date-time":"2022-03-25T00:00:00Z","timestamp":1648166400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/onlinelibrary.wiley.com\/termsAndConditions#vor"}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Beton und Stahlbetonbau"],"published-print":{"date-parts":[[2022,5]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>Eine pr\u00e4zise, adaptive und individuelle Fertigung erm\u00f6glicht einen hohen Grad an Bauteildifferenzierung, die somit hocheffiziente und lastadaptierte Strukturen f\u00fcr den Betonfertigteilbau zug\u00e4nglich macht. W\u00e4hrend Fortschritte von Fertigungsseite durch zahlreiche Projekte in Forschung und Industrie demonstriert werden, so sind zugeh\u00f6rige Planungswerkzeuge weniger entwickelt. Um das volle Potenzial digitaler Fertigungsprozesse nutzen zu k\u00f6nnen, sind daher computerbasierte Methoden erforderlich, welche die flexible Anpassung von Bauteilgeometrien erlauben und eine fertigungsgerechte Planung erm\u00f6glichen. Die Modularisierung von Betonstrukturen muss den Anforderungen sowohl von Seiten der Tragf\u00e4higkeit wie auch der Fertigung gerecht werden. Planungswerkzeuge m\u00fcssen diese Komplexit\u00e4t abbilden k\u00f6nnen. Simulationsbasierte Methoden, welche modularisierte Baustrukturen als komplexes System bauteilspezifischer Wechselwirkungen abbilden, bieten die M\u00f6glichkeit, bereits fr\u00fch die Konsequenzen von Entwurfs\u2010 und Planungsentscheidungen absch\u00e4tzen zu k\u00f6nnen. Dieser Beitrag zeigt einen agentenbasierten Planungsansatz auf, welcher insbesondere die additive Fertigung von Schalungen als Erg\u00e4nzung bestehender Produktionskonzepte ber\u00fccksichtigt. Die geometrischen Grundlagen f\u00fcr die simulationsbasierte Zerlegung von Bauteilen werden dargestellt und in einen durchgehenden Planungsprozess integriert.<\/jats:p>","DOI":"10.1002\/best.202200006","type":"journal-article","created":{"date-parts":[[2022,3,25]],"date-time":"2022-03-25T13:03:59Z","timestamp":1648213439000},"page":"324-332","update-policy":"http:\/\/dx.doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Automatisierte Bauteilzerlegung f\u00fcr Betonfertigteile aus additiv hergestellten Schalungen"],"prefix":"10.1002","volume":"117","author":[{"given":"David","family":"Stieler","sequence":"first","affiliation":[{"name":"Universit\u00e4t Stuttgart Institut f\u00fcr Computerbasiertes Entwerfen und Baufertigung (ICD)  Keplerstra\u00dfe 11 70174 Stuttgart"}]},{"given":"Tobias","family":"Schwinn","sequence":"additional","affiliation":[{"name":"Universit\u00e4t Stuttgart Institut f\u00fcr Computerbasiertes Entwerfen und Baufertigung (ICD)  Keplerstra\u00dfe 11 70174 Stuttgart"}]},{"given":"Achim","family":"Menges","sequence":"additional","affiliation":[{"name":"Universit\u00e4t Stuttgart Institut f\u00fcr Computerbasiertes Entwerfen und Baufertigung (ICD)  Keplerstra\u00dfe 11 70174 Stuttgart"}]}],"member":"311","published-online":{"date-parts":[[2022,3,25]]},"reference":[{"key":"e_1_2_5_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.engfailanal.2014.02.004"},{"key":"e_1_2_5_3_1","first-page":"14","article-title":"Think formwork \u2013 reduce costs","author":"Lab R. H.","year":"2007","journal-title":"Structure magazine"},{"key":"e_1_2_5_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2018.04.004"},{"key":"e_1_2_5_5_1","doi-asserted-by":"publisher","DOI":"10.1089\/3dp.2021.0024"},{"key":"e_1_2_5_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cemconres.2020.106071"},{"key":"e_1_2_5_7_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)AE.1943-5568.0000397"},{"key":"e_1_2_5_8_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11356-020-10657-8"},{"key":"e_1_2_5_9_1","unstructured":"Roschli A.;Post B. K.;Chesser P. C.;Sallas M.;Love L. J.;Gaul K. T.(2020)Precast concrete molds fabricated with big area additive manufacturing. Solid Freeform Fabrication 2018: Proceedings of the 29th Annual International Solid Freeform Fabrication Symposium \u2013 An Additive Manufacturing Conference SFF 2018. pp.568\u2013579"},{"key":"e_1_2_5_10_1","doi-asserted-by":"publisher","DOI":"10.1089\/3dp.2019.0197"},{"key":"e_1_2_5_11_1","doi-asserted-by":"publisher","DOI":"10.1002\/bate.202000110"},{"key":"e_1_2_5_12_1","unstructured":"Peticila D.(2017)Structural Precast for Revit \u2013 Fast and Accurate Modeling in a Single BIM Mode.San Refael:Autodesk."},{"key":"e_1_2_5_13_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00004-013-0149-5"},{"key":"e_1_2_5_14_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2017.12.027"},{"key":"e_1_2_5_15_1","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1007\/978-3-658-05606-3","volume-title":"Building Information Modeling","author":"Borrmann A.","year":"2015"},{"key":"e_1_2_5_16_1","first-page":"43","volume-title":"BIM Handbook \u2013 A Guide to Building Information Modelling for Owners, Managers, Designers, Engineers, and Contractors","author":"Eastman C.","year":"2011"},{"key":"e_1_2_5_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cad.2014.02.011"},{"key":"e_1_2_5_18_1","unstructured":"Vorwerk A.;Coats I.A Better Structural Workflow: Integrated Design Analysis and Detailing. pp.1\u201345"},{"key":"e_1_2_5_19_1","unstructured":"Stieler D.;Schwinn T.;Menges A.(2022)Additive formwork in precast construction. Post Carbon \u2013 Proceedings of the 26th International Conference on Computer\u2010Aided Architectural Design Research in Asia CAADRIA 2022 (zur Ver\u00f6ffentlichung angenommen)."},{"key":"e_1_2_5_20_1","doi-asserted-by":"publisher","DOI":"10.1080\/096132100418528"},{"key":"e_1_2_5_21_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00158-021-03019-6"},{"key":"e_1_2_5_22_1","doi-asserted-by":"publisher","DOI":"10.1002\/bate.202000054"},{"key":"e_1_2_5_23_1","doi-asserted-by":"publisher","DOI":"10.3389\/fbuil.2019.00115"},{"key":"e_1_2_5_24_1","doi-asserted-by":"crossref","unstructured":"Michalatos P.;Payne A.(2016)Monolith : The Biomedical Paradigm and the Inner Complexity of Hierarchical Material Design. Complexity & Simplicity \u2013 Proceedings of the 34th eCAADe Conference Oulu. Vol.1 pp.445\u2013454.","DOI":"10.52842\/conf.ecaade.2016.1.445"},{"key":"e_1_2_5_25_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-658-17189-6_2"},{"key":"e_1_2_5_26_1","unstructured":"Juli V.(2019)Agenten zur Realisierung von Industrie 4.0.D\u00fcsseldorf:VDI."},{"key":"e_1_2_5_27_1","doi-asserted-by":"publisher","DOI":"10.1057\/jos.2016.7"},{"key":"e_1_2_5_28_1","first-page":"177","volume-title":"Design Agency","author":"Schwinn T.","year":"2014"},{"key":"e_1_2_5_29_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11721-017-0151-8"},{"key":"e_1_2_5_30_1","unstructured":"McNeel R.; et al. (2010)Rhinoceros 3D Version 6.0.Robert McNeel & Associates Seattle WA."},{"key":"e_1_2_5_31_1","doi-asserted-by":"publisher","DOI":"10.1002\/best.201800073"}],"container-title":["Beton- und Stahlbetonbau"],"original-title":[],"language":"de","link":[{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1002\/best.202200006","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/full-xml\/10.1002\/best.202200006","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1002\/best.202200006","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,25]],"date-time":"2023-08-25T18:06:27Z","timestamp":1692986787000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1002\/best.202200006"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,3,25]]},"references-count":30,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2022,5]]}},"alternative-id":["10.1002\/best.202200006"],"URL":"https:\/\/doi.org\/10.1002\/best.202200006","archive":["Portico"],"relation":{},"ISSN":["0005-9900","1437-1006"],"issn-type":[{"value":"0005-9900","type":"print"},{"value":"1437-1006","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,3,25]]},"assertion":[{"value":"2022-02-01","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2022-03-10","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2022-03-25","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}