{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,31]],"date-time":"2025-10-31T07:10:34Z","timestamp":1761894634877},"publisher-location":"Boston, MA","reference-count":52,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780387343457"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/0-387-34456-x_12","type":"book-chapter","created":{"date-parts":[[2007,11,13]],"date-time":"2007-11-13T10:57:38Z","timestamp":1194951458000},"page":"119-131","source":"Crossref","is-referenced-by-count":2,"title":["Intelligent Enterprises for Construction: Bridging the Technology and Knowledge Gaps through Innovation and Education"],"prefix":"10.1007","author":[{"given":"Bee Hua","family":"Goh","sequence":"first","affiliation":[]}],"member":"297","reference":[{"issue":"7","key":"12_CR1","doi-asserted-by":"crossref","first-page":"631","DOI":"10.1080\/01446190500126940","volume":"23","author":"T. Reichstein","year":"2005","unstructured":"T. Reichstein, AJ. Salter, and D.M. Gann, Last Among Equals: A Comparison of Innovation in Construction, Services and Manufacturing in the UK, Construction Management and Economics 23(7), 631\u2013644 (2005).","journal-title":"Construction Management and Economics"},{"key":"12_CR2","volume-title":"Innovation in Building Materials","author":"M. Bowley","year":"1960","unstructured":"M. Bowley, Innovation in Building Materials (Gerald Duckworth, London, 1960)."},{"key":"12_CR3","volume-title":"The British Building Industry","author":"M. Bowley","year":"1966","unstructured":"M. Bowley, The British Building Industry (Cambridge University Press, Cambridge, 1966)."},{"key":"12_CR4","unstructured":"OECD, Technology Policy: An International Comparison of Innovation in Major Capital Projects, Organisation for Economic Co-operation and Development Report, Paris, 2000."},{"key":"12_CR5","doi-asserted-by":"publisher","first-page":"185","DOI":"10.1016\/0048-7333(93)00762-I","volume":"24","author":"A.K. Klevorick","year":"1995","unstructured":"A.K. Klevorick, R. Levin, R. Nelson, and S. Winter, On the Sources and Significance of Inter-industry Differences in Technological Opportunities, Research Policy 24, 185\u2013205 (1995).","journal-title":"Research Policy"},{"key":"12_CR6","doi-asserted-by":"crossref","unstructured":"S. Sharma and J. Gupta, Knowledge Economy and Intelligent Enterprises in: Intelligent Enterprises of the 21 st Century (Idea Group Publishing, 2004).","DOI":"10.4018\/978-1-59140-160-5.ch001"},{"key":"12_CR7","doi-asserted-by":"publisher","first-page":"367","DOI":"10.1016\/j.buildenv.2005.01.021","volume":"41","author":"B.H. Goh","year":"2006","unstructured":"B.H. Goh, Creating Intelligent Enterprises in the Singapore Construction Industry to Support a Knowledge Economy, Building and Environment 41, 367\u2013379 (2006).","journal-title":"Building and Environment"},{"issue":"9","key":"12_CR8","doi-asserted-by":"crossref","first-page":"713","DOI":"10.1080\/01446190500127112","volume":"23","author":"E. Acar","year":"2005","unstructured":"E. Acar, I. Kocak, Y. Sey, and D. Arditi, Use of Information and Communication Technologies by Small and Medium-sized Enterprises (SMEs) in Building Construction, Construction Management and Economics 23(9), 713\u2013722 (2005).","journal-title":"Construction Management and Economics"},{"key":"12_CR9","unstructured":"International Finance Corporation, SME definitions \u2014 What is a SME, World Bank Group, http:\/\/www2.ifc.org\/sme\/html\/sme_definitions.html."},{"key":"12_CR10","first-page":"314","volume-title":"Proceedings of the International Symposium on Building Economics and Construction Management","author":"P.S. Brandon","year":"1990","unstructured":"P.S. Brandon, Expert Systems \u2014 After the Hype is Over, in: Proceedings of the International Symposium on Building Economics and Construction Management, CIB, Sydney, Australia, 314\u2013344 (1990)."},{"issue":"4","key":"12_CR11","doi-asserted-by":"publisher","first-page":"606","DOI":"10.1061\/(ASCE)0733-9364(1991)117:4(606)","volume":"117","author":"O. MoseUii","year":"1991","unstructured":"O. MoseUii, T. Hegazy, and P. Fazio, Neural Networks as Tools in Construction, Construction Engineering and Management 117(4), 606\u2013625 (1991).","journal-title":"Construction Engineering and Management"},{"key":"12_CR12","doi-asserted-by":"crossref","unstructured":"R.I. Carr, Simulation of Construction Project Duration, ASCE Journal of the Construction Division, 117\u2013128 (1979).","DOI":"10.1061\/JCCEAZ.0000827"},{"issue":"3","key":"12_CR13","doi-asserted-by":"crossref","first-page":"342","DOI":"10.1061\/(ASCE)0733-9364(1983)109:3(342)","volume":"109","author":"J.C. Woolery","year":"1983","unstructured":"J.C. Woolery and K.C. Crandall, Stochastic Network Model for Planning Scheduling, Construction Engineering and Management 109(3), 342\u2013354 (1983).","journal-title":"Construction Engineering and Management"},{"issue":"3","key":"12_CR14","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1080\/01446198400000019","volume":"2","author":"T. Baxendale","year":"1984","unstructured":"T. Baxendale, Construction Resource Models by Monte Carlo Simulation, Construction Management and Economics 2(3), 201\u2013217 (1984).","journal-title":"Construction Management and Economics"},{"issue":"3","key":"12_CR15","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1080\/01446198400000021","volume":"2","author":"J. Bennett","year":"1984","unstructured":"J. Bennett and R.N. Ormerod, Simulation Applied to Construction Projects, Construction Management and Economics 2(3), 225\u2013263 (1984).","journal-title":"Construction Management and Economics"},{"issue":"3","key":"12_CR16","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1080\/01446198500000014","volume":"3","author":"M.M. Cusack","year":"1985","unstructured":"M.M. Cusack, A Simplified Approach to the Planning and Control of Cost and Project Duration, Construction Management and Economics 3(3), 183\u2013198 (1985).","journal-title":"Construction Management and Economics"},{"issue":"4","key":"12_CR17","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1061\/(ASCE)0733-9364(1985)111:4(325)","volume":"111","author":"H.N. Ahuja","year":"1985","unstructured":"H.N. Ahuja and V. Nandakumar, Simulation Model to Forecast Project Completion Time, Construction Engineering and Management 111(4), 325\u2013342 (1985).","journal-title":"Construction Engineering and Management"},{"issue":"3","key":"12_CR18","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1080\/01446198700000019","volume":"5","author":"R. Kami","year":"1987","unstructured":"R. Kami, A Systematic Approach to Stochastic Scheduling, Construction Management and Economics 5(3), 187\u2013198 (1987).","journal-title":"Construction Management and Economics"},{"issue":"2","key":"12_CR19","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1080\/01446199000000012","volume":"8","author":"S. Karshenas","year":"1990","unstructured":"S. Karshenas and D. Haber, Economic Optimisation of Construction Project Scheduling, Construction Management and Economics 8(2), 135\u2013146 (1990).","journal-title":"Construction Management and Economics"},{"issue":"4","key":"12_CR20","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1046\/j.1365-232X.1997.t01-1-00002.x","volume":"4","author":"H. Al-Tabtabai","year":"1997","unstructured":"H. Al-Tabtabai, N. Kartam, I. Flood, and A.P. Alex, Expert Judgment in Forecasting Construction Project Completion, Engineering, Construction and Architectural Management 4(4), 271\u2013293 (1997).","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"3","key":"12_CR21","doi-asserted-by":"publisher","first-page":"233","DOI":"10.1061\/(ASCE)0733-9364(1997)123:3(233)","volume":"123","author":"H. Li","year":"1997","unstructured":"H. Li and P. Love, Using Improved Genetic Algorithms to Facilitate Time-cost Optimisation, Construction Engineering and Management 123(3), 233\u2013237 (1997).","journal-title":"Construction Engineering and Management"},{"issue":"4","key":"12_CR22","doi-asserted-by":"publisher","first-page":"450","DOI":"10.1061\/(ASCE)0733-9364(1997)123:4(450)","volume":"123","author":"H. Adeli","year":"1997","unstructured":"H. Adeli and A. Karim, Scheduling\/cost Optimization and Neural Dynamics Model for Construction, Construction Engineering and Management 123(4), 450\u2013458 (1997).","journal-title":"Construction Engineering and Management"},{"issue":"3","key":"12_CR23","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1080\/01446198600000014","volume":"4","author":"S.N. Tucker","year":"1986","unstructured":"S.N. Tucker, Formulating Construction Cash Flow Curves Using a Reliability Theory Analogy, Construction Management and Economics 4(3), 179\u2013188 (1986).","journal-title":"Construction Management and Economics"},{"issue":"1","key":"12_CR24","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1080\/01446198900000002","volume":"7","author":"R. Kenley","year":"1989","unstructured":"R. Kenley and O.D. Wilson, A Construction Project Net Cash Flow Model, Construction Management and Economics 7(1), 3\u201318 (1989).","journal-title":"Construction Management and Economics"},{"issue":"2","key":"12_CR25","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1080\/01446199100000011","volume":"9","author":"F. Khosrowshahi","year":"1991","unstructured":"F. Khosrowshahi, Simulation of Expenditure Patterns of Construction Projects, Construction Management and Economics 9(2), 113\u2013132 (1991).","journal-title":"Construction Management and Economics"},{"issue":"3","key":"12_CR26","doi-asserted-by":"publisher","first-page":"291","DOI":"10.1080\/01446199100000023","volume":"9","author":"A.P. Kaka","year":"1991","unstructured":"A.P. Kaka and A.D.F. Price, Net Cashflow Models: Are They Reliable? Construction Management and Economics 9(3), 291\u2013308 (1991).","journal-title":"Construction Management and Economics"},{"issue":"4","key":"12_CR27","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1080\/01446199300000027","volume":"11","author":"A.P. Kaka","year":"1993","unstructured":"A.P. Kaka and A.D.F. Price, Modelling Standard Cost Commitment Curves for Contractors\u2019 Cash Flow Forecasting, Construction Management and Economics 11(4), 271\u2013283 (1993).","journal-title":"Construction Management and Economics"},{"issue":"3","key":"12_CR28","doi-asserted-by":"publisher","first-page":"214","DOI":"10.1061\/(ASCE)0733-9364(1997)123:3(214)","volume":"123","author":"D.K.H. Chua","year":"1997","unstructured":"D.K.H. Chua, Y.C. Kog, P.K. Loh, and EJ. Jaselskis, Model for Construction Budget Performance \u2014 Neural Network Approach, Construction Engineering and Management 123(3), 214\u2013222 (1997).","journal-title":"Construction Engineering and Management"},{"issue":"1","key":"12_CR29","doi-asserted-by":"publisher","first-page":"18","DOI":"10.1061\/(ASCE)0733-9364(1998)124:1(18)","volume":"124","author":"H. Adeli","year":"1998","unstructured":"H. Adeli and M. Wu, Regularization Neural Network for Construction Cost Estimation, Construction Engineering and Management 124(1), 18\u201324 (1998).","journal-title":"Construction Engineering and Management"},{"issue":"3","key":"12_CR30","doi-asserted-by":"publisher","first-page":"210","DOI":"10.1061\/(ASCE)0733-9364(1998)124:3(210)","volume":"124","author":"T. Hegazy","year":"1998","unstructured":"T. Hegazy and A. Ayed, Neural Network Model for Parametric Cost Estimation of Highway Projects, Construction Engineering and Management 124(3), 210\u2013218 (1998).","journal-title":"Construction Engineering and Management"},{"issue":"CO2","key":"12_CR31","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1061\/JCCEAZ.0000772","volume":"104","author":"M. Gates","year":"1978","unstructured":"M. Gates and A. Scarpa, Concreting and Formwork Logistics and Optimisation, ASCE Journal of the Construction Division 104(CO2), 219\u2013240 (1978).","journal-title":"ASCE Journal of the Construction Division"},{"issue":"CO4","key":"12_CR32","doi-asserted-by":"crossref","first-page":"419","DOI":"10.1061\/JCCEAZ.0000798","volume":"104","author":"J.P. Clemmens","year":"1978","unstructured":"J.P. Clemmens and J.H. Willenbrock, The SCRAPESIM Computer Simulation, ASCE Journal of the Construction Division 104(CO4), 419\u2013435 (1978).","journal-title":"ASCE Journal of the Construction Division"},{"issue":"CO1","key":"12_CR33","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1061\/JCCEAZ.0000758","volume":"104","author":"B.C. Paulson Jr.","year":"1978","unstructured":"B.C. Paulson Jr., Interactive Graphics for Simulating Construction Operations, ASCE Journal of the Construction Division 104(CO1), 69\u201376 (1978).","journal-title":"ASCE Journal of the Construction Division"},{"key":"12_CR34","doi-asserted-by":"crossref","unstructured":"R. Pilcher and I. Flood, The Use of Simulation Models in Construction in: Proceedings of the Institution of Civil Engineers, Part 1, 76, Paper 8779: Engineering Management Group (1984).","DOI":"10.1680\/iicep.1984.1202"},{"issue":"2","key":"12_CR35","doi-asserted-by":"publisher","first-page":"302","DOI":"10.1061\/(ASCE)0733-9364(1987)113:2(302)","volume":"113","author":"B.C. Paulson Jr.","year":"1987","unstructured":"B.C. Paulson Jr., W.T. Chan, and C.C Koo, Construction Operations Simulation by Microcomputer, Construction Engineering and Management 113(2), 302\u2013314 (1987).","journal-title":"Construction Engineering and Management"},{"issue":"2","key":"12_CR36","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1046\/j.1365-232X.1998.00037.x","volume":"5","author":"E. Alkoc","year":"1998","unstructured":"E. Alkoc and F. Erbatur, Simulation in Concreting Operations: A Comparison of Models and Resource Combinations, Engineering, Construction and Architectural Management 5(2), 159\u2013173 (1998).","journal-title":"Engineering, Construction and Architectural Management"},{"key":"12_CR37","first-page":"197","volume-title":"Proceedings of the International Symposium on Building Economics and Construction Management","author":"I. Flood","year":"1990","unstructured":"I. Flood, Solving Construction Operational Problems using Artificial Neural Networks and Simulated Evolution in: Proceedings of the International Symposium on Building Economics and Construction Management, CIB, Sydney, Australia 197\u2013208 (1990)."},{"key":"12_CR38","doi-asserted-by":"crossref","unstructured":"I. Flood, A Neural Network Approach to the Sequencing of Construction Tasks in: Proceedings of the 6th International Symposium on Automation and Robotics in Construction, San Francisco, CA, 204\u2013211 (1989).","DOI":"10.22260\/ISARC1989\/0026"},{"key":"12_CR39","doi-asserted-by":"crossref","unstructured":"I. Flood, Simulating the Construction Process using Neural Networks in: Proceedings of the 7th International Symposium on Automation and Robotics in Construction, Bristol, UK, 374\u2013382 (1990).","DOI":"10.22260\/ISARC1990\/0048"},{"issue":"1","key":"12_CR40","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1061\/(ASCE)0733-9364(1985)111:1(31)","volume":"111","author":"A. Tavakoli","year":"1985","unstructured":"A. Tavakoli, Productivity Analysis of Construction Operations, Construction Engineering and Management 111(1), 31\u201339 (1985).","journal-title":"Construction Engineering and Management"},{"issue":"2","key":"12_CR41","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1061\/(ASCE)0733-9364(1986)112:2(245)","volume":"112","author":"H.R. Thomas","year":"1986","unstructured":"H.R. Thomas, C.T. Mathews, and J.G. Ward, Learning Curve Models of Construction Productivity, Construction Engineering and Management 112(2), 245\u2013258 (1986).","journal-title":"Construction Engineering and Management"},{"issue":"4","key":"12_CR42","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1061\/(ASCE)0733-9364(1987)113:4(623)","volume":"113","author":"H.R. Thomas","year":"1987","unstructured":"H.R. Thomas and I. Yiakoamis, Factor Model of Construction Productivity, Construction Engineering and Management 113(4), 623\u2013639 (1987).","journal-title":"Construction Engineering and Management"},{"issue":"2","key":"12_CR43","doi-asserted-by":"publisher","first-page":"234","DOI":"10.1061\/(ASCE)0887-3801(1994)8:2(234)","volume":"8","author":"L.C. Chao","year":"1994","unstructured":"L.C. Chao and MJ. Skibniewski, Estimating Construction Productivity: Neural-Network-based Approach, Computing in Civil Engineering 8(2), 234\u2013251 (1994).","journal-title":"Computing in Civil Engineering"},{"issue":"4","key":"12_CR44","doi-asserted-by":"publisher","first-page":"399","DOI":"10.1061\/(ASCE)0733-9364(1997)123:4(399)","volume":"123","author":"J. Portas","year":"1997","unstructured":"J. Portas and S. AbouRizk, Neural Network Model for Estimating Construction Productivity, Construction Engineering and Management 123(4), 399\u2013410 (1997).","journal-title":"Construction Engineering and Management"},{"issue":"6","key":"12_CR45","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1061\/(ASCE)0733-9364(1998)124:6(498)","volume":"124","author":"R. Sonmez","year":"1998","unstructured":"R. Sonmez and J.E. Rowings, Construction Labor Productivity Modeling with Neural Networks, Construction Engineering and Management 124(6), 498\u2013504 (1998).","journal-title":"Construction Engineering and Management"},{"issue":"CO2","key":"12_CR46","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1061\/JCCEAZ.0000871","volume":"106","author":"D.G. Woods","year":"1980","unstructured":"D.G. Woods and F.C. Harris, Truck Allocation Model for Concrete Distribution, ASCE Journal of the Construction Division 106(CO2), 131\u2013139 (1980).","journal-title":"ASCE Journal of the Construction Division"},{"issue":"2","key":"12_CR47","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1080\/01446198400000015","volume":"2","author":"S. Furusaka","year":"1984","unstructured":"S. Furusaka and C. Gray, A Model for the Selection of the Optimum Crane for Construction Sites, Construction Management and Economics 2(2), 157\u2013176 (1984).","journal-title":"Construction Management and Economics"},{"issue":"4","key":"12_CR48","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1080\/01446198800000025","volume":"6","author":"A. Touran","year":"1988","unstructured":"A. Touran and K.A.H. Taher, Optimum Fleet Size Determination by Queuing and Simulation, Construction Management and Economics 6(4), 295\u2013306 (1988).","journal-title":"Construction Management and Economics"},{"issue":"2","key":"12_CR49","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1080\/01446198900000014","volume":"7","author":"D.A. Wijesundera","year":"1989","unstructured":"D.A. Wijesundera and F.C. Harris, The Selection of Materials Handling Methods in Construction by Simulation, Construction Management and Economics 7(2), 95\u2013102 (1989).","journal-title":"Construction Management and Economics"},{"key":"12_CR50","first-page":"841","volume-title":"Proceedings of 8th Conference in Computing in Civil Engineering and Geographic Information Systems","author":"S. Karshenas","year":"1992","unstructured":"S. Karshenas and X. Feng, Application of Neural Networks in Earthmoving Equipment Production Estimating in: Proceedings of 8th Conference in Computing in Civil Engineering and Geographic Information Systems, ASCE, New York, N.Y. 841\u2013847 (1992)."},{"issue":"1","key":"12_CR51","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1061\/(ASCE)0733-9364(1999)125:1(32)","volume":"125","author":"A. Haidar","year":"1999","unstructured":"A. Haidar, S. Naoum, R. Howes, and J. Tah, Genetic Algorithms Application and Testing for Equipment Selection, Construction Engineering and Management 125(1), 32\u201338 (1999).","journal-title":"Construction Engineering and Management"},{"issue":"5","key":"12_CR52","doi-asserted-by":"publisher","first-page":"607","DOI":"10.1080\/014461900407419","volume":"18","author":"B.H. Goh","year":"2000","unstructured":"B.H. Goh and H.P. Teo, Forecasting Construction Industry Demand, Price and Productivity in Singapore \u2014 the Box Jenkins Approach, Construction Management and Economics 18(5), 607\u2013618(2000).","journal-title":"Construction Management and Economics"}],"container-title":["IFIP International Federation for Information Processing","Research and Practical Issues of Enterprise Information Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/0-387-34456-X_12.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,5,14]],"date-time":"2023-05-14T17:57:30Z","timestamp":1684087050000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/0-387-34456-X_12"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9780387343457"],"references-count":52,"URL":"https:\/\/doi.org\/10.1007\/0-387-34456-x_12","relation":{},"subject":[]}}