{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T17:01:18Z","timestamp":1725901278935},"publisher-location":"Boston, MA","reference-count":9,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9781402081507"},{"type":"electronic","value":"9781402081514"}],"license":[{"start":{"date-parts":[[2004,1,1]],"date-time":"2004-01-01T00:00:00Z","timestamp":1072915200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2004]]},"DOI":"10.1007\/1-4020-8151-0_39","type":"book-chapter","created":{"date-parts":[[2006,3,7]],"date-time":"2006-03-07T05:17:30Z","timestamp":1141708650000},"page":"465-474","source":"Crossref","is-referenced-by-count":1,"title":["A Decision Support System (DSS) for the Railway Scheduling Problem"],"prefix":"10.1007","author":[{"given":"L.","family":"Ingolotti","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"P.","family":"Tormos","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A.","family":"Lova","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"F.","family":"Barber","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M. A.","family":"Salido","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Abril","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"1\u20133","key":"39_CR1","first-page":"415","volume":"79","author":"M.R. Bussieck","year":"1997","unstructured":"Bussieck, M.R., Winter, T., and Zimmermann, U.T., \u2018Discrete optimization in public railtransport\u2019, Math. Programming, 79(1\u20133), 415\u2013444, (1997).","journal-title":"Math. Programming"},{"key":"39_CR2","doi-asserted-by":"publisher","first-page":"851","DOI":"10.1287\/opre.50.5.851.362","volume":"50","author":"A. Caprara","year":"2002","unstructured":"Caprara, A., Fischetti, M., and Toth P., \u2018Modeling and solving the train timetabling problem\u2019, Operations Research, 50, 851\u2013861, (2002).","journal-title":"Operations Research"},{"issue":"4","key":"39_CR3","doi-asserted-by":"crossref","first-page":"380","DOI":"10.1287\/trsc.32.4.380","volume":"32","author":"J.F. Cordeau","year":"1998","unstructured":"Cordeau, J.F., Toth, P., and Vigo, D., \u2018A survey of optimization models for train routing and scheduling\u2019, Transportation Science, 32(4), 380\u2013404, (1998).","journal-title":"Transportation Science"},{"key":"39_CR4","first-page":"66","volume":"6","author":"C. Liebchen","year":"2002","unstructured":"Liebchen, C., and M\u00f6hring, R., \u2018A case study in periodic timetabling\u2019, Electronic Notes in Theoretical Computer Science, 66, 6, (2002).","journal-title":"Electronic Notes in Theoretical Computer Science"},{"key":"39_CR5","first-page":"1","volume":"1\u20132","author":"K. \u2018. Nachtigall","year":"1996","unstructured":"Nachtigall, K., \u2018Periodic network optimization with different arc frequencies\u2019Discrete Applied Mathematics 69, 1\u20132, 1\u201317, (1996).","journal-title":"Periodic network optimization with different arc frequencies\u2019Discrete Applied Mathematics 69"},{"key":"39_CR6","doi-asserted-by":"crossref","unstructured":"Nachtigall, K., and Voget, S., \u2018Minimizing waiting times in integrated fixed interval timetables by upgrading railway tracks\u2019, European Journal of Operational Research, (1997).","DOI":"10.1016\/S0377-2217(96)00284-6"},{"key":"39_CR7","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1016\/0191-2615(96)00005-7","volume":"6","author":"M.A. \u2018. Odijk","year":"1996","unstructured":"Odijk, M.A., \u2018A constraint generation algorithm for the construction of periodic railway timetables\u2019, Transportation Research, 30, 6, 455\u2013464, (1996).","journal-title":"Transportation Research, 30"},{"key":"39_CR8","series-title":"Technical Report","volume-title":"Timetable construction for railned","author":"A. Schrijver","year":"1994","unstructured":"Schrijver, A., and Steenbeek, A., \u2018Timetable construction for railned\u2019, Technical Report, CWI, Amsterdam, The Netherlands (in Dutch), (1994)."},{"issue":"4","key":"39_CR9","doi-asserted-by":"publisher","first-page":"550","DOI":"10.1137\/0402049","volume":"2","author":"P. Serafini","year":"1989","unstructured":"Serafini, P., and Ukovich, W., \u2018A mathematical model for periodic scheduling problems\u2019, SIAM Journal on Discrete Mathematics, 2(4), 550\u2013581, (1989).","journal-title":"SIAM Journal on Discrete Mathematics"}],"container-title":["IFIP International Federation for Information Processing","Artificial Intelligence Applications and Innovations"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-8151-0_39","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,20]],"date-time":"2019-05-20T17:45:04Z","timestamp":1558374304000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/1-4020-8151-0_39"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004]]},"ISBN":["9781402081507","9781402081514"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/1-4020-8151-0_39","relation":{},"ISSN":["1571-5736"],"issn-type":[{"type":"print","value":"1571-5736"}],"subject":[],"published":{"date-parts":[[2004]]}}}