{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T01:26:56Z","timestamp":1725499616711},"publisher-location":"London","reference-count":12,"publisher":"Springer London","isbn-type":[{"type":"print","value":"9781852339081"},{"type":"electronic","value":"9781846281037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/1-84628-103-2_8","type":"book-chapter","created":{"date-parts":[[2007,12,31]],"date-time":"2007-12-31T05:09:30Z","timestamp":1199077770000},"page":"107-120","source":"Crossref","is-referenced-by-count":1,"title":["A Topological Model Based on Railway Capacity to Manage Periodic Train Scheduling"],"prefix":"10.1007","author":[{"given":"M. A.","family":"Salido","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"F.","family":"Barber","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Abril","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"P.","family":"Tormos","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A.","family":"Lova","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"L.","family":"Ingolotti","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"8_CR1","doi-asserted-by":"crossref","unstructured":"Barber, F., Salido, M.A., Ingolotti, L., Abril, M., Lova, A., Tormos, P. An Interactive Train Scheduling Tool for Solving and Plotting Running Maps, Current Topics in Artificial Intelligence LNAI 3040, 646\u2013655 (2004).","DOI":"10.1007\/978-3-540-25945-9_64"},{"issue":"3","key":"8_CR2","doi-asserted-by":"publisher","first-page":"415","DOI":"10.1007\/BF02614327","volume":"79","author":"M.R. Bussiecky","year":"1997","unstructured":"Bussiecky, M.R., Winter, T., Zimmermann, U.T. Discrete optimization in public rail transport, Mathematical Programming 79(3), (1997), 415\u2013444.","journal-title":"Mathematical Programming"},{"key":"8_CR3","unstructured":"Caprara, A., Fischetti, M., Guida, P., Monaci, M., Sacco, G., Toth, P. Solution of Real-World Train Timetabling Problems, 34th Annual Hawaii International Conference on System Sciences 3 (2001)."},{"key":"8_CR4","doi-asserted-by":"publisher","first-page":"167","DOI":"10.1023\/A:1015109732002","volume":"7","author":"C.K. Chiu","year":"2002","unstructured":"Chiu, C.K., Chou, C.M., Lee, J.H.M, Leung, H.F., and Leung, Y.W, A Constraint-Based Interactive Train Rescheduling Tool, Constraints 7 (2002), 167\u2013198.","journal-title":"Constraints"},{"key":"8_CR5","unstructured":"Kaas, A.H., Methods to Calculate Capacity of Railways, Ph. Dissertation (1998)."},{"key":"8_CR6","unstructured":"Kreuger, P.; Carlsson, M.; Olsson, J.; Sjoland, T.; Astrom, E. The TUFF train scheduler: Two duration trip scheduling on multi directional track networks. In Proc. of the workshop on Tools and Environments for (Constraint) Logic Programming, (1997)."},{"key":"8_CR7","doi-asserted-by":"crossref","unstructured":"Krueger, H. Parametric Modelling in Rail Capacity Planning. Canadian National Railway, (1998).","DOI":"10.1145\/324898.325036"},{"key":"8_CR8","volume-title":"Train schedule optimization in public rail transport","author":"T. Lindner","year":"2000","unstructured":"Lindner, T., Train schedule optimization in public rail transport, Ph. Dissertation, Technische Universitat Braunschweig, Germany, (2000)."},{"key":"8_CR9","unstructured":"Oliveira, E., Smith, B.M., A Job-Shop Scheduling Model for the Single-Track Railway Scheduling Problem, Research Report 2000.21, University of Leeds, (2000)."},{"key":"8_CR10","first-page":"476","volume":"2","author":"M.A. Salido","year":"2003","unstructured":"Salido, M.A., Barber, F., A Constraint Ordering Heuristic for Scheduling Problem, 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA 2003), (2) 476\u2013491, (2003).","journal-title":"1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA 2003)"},{"key":"8_CR11","unstructured":"Weits, E., Railway Capacity and Timetable Complexity, 7th International Workshop on Project Management and Scheduling, Euro (2000)."},{"key":"8_CR12","unstructured":"Zuidwijk, R.A., Kroon, L.G., Integer Constraints for Train Series Connections, Erasmus Research Institute of Management (ERIM), Discussion Paper. (2002)."}],"container-title":["Applications and Innovations in Intelligent Systems XII"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/1-84628-103-2_8.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T20:47:32Z","timestamp":1619556452000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/1-84628-103-2_8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9781852339081","9781846281037"],"references-count":12,"URL":"https:\/\/doi.org\/10.1007\/1-84628-103-2_8","relation":{},"subject":[]}}