{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,16]],"date-time":"2026-03-16T10:17:40Z","timestamp":1773656260758,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":9,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540259121","type":"print"},{"value":"9783540320654","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/11427391_122","type":"book-chapter","created":{"date-parts":[[2009,12,29]],"date-time":"2009-12-29T08:05:42Z","timestamp":1262073942000},"page":"762-769","source":"Crossref","is-referenced-by-count":2,"title":["Transient Chaotic Discrete Neural Network for Flexible Job-Shop Scheduling"],"prefix":"10.1007","author":[{"given":"Xinli","family":"Xu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qiu","family":"Guan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wanliang","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shengyong","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2005,4,23]]},"reference":[{"key":"122_CR1","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1002\/(SICI)1099-1425(200001\/02)3:1<3::AID-JOS32>3.0.CO;2-Y","volume":"3","author":"M. Mastrolilli","year":"2000","unstructured":"Mastrolilli, M., Gambardella, L.M.: Effective Neighbourhood Functions for The Flexible Job Shop Problem. Journal of Scheduling\u00a03, 3\u201320 (2000)","journal-title":"Journal of Scheduling"},{"key":"122_CR2","doi-asserted-by":"crossref","unstructured":"Najid, N.M., et al.: A Modified Simulated Annealing Method for Flexible Job Shop Scheduling Problem. In: Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, vol.\u00a05, pp. 89\u201394 (2002)","DOI":"10.1109\/ICSMC.2002.1176334"},{"key":"122_CR3","doi-asserted-by":"crossref","unstructured":"Chen, H., et al.: Genetic Algorithm for Flexible Job-shop Scheduling. In: Proceedings - IEEE International Conference on Robotics and Automation, vol.\u00a02, pp. 1120\u20131125 (1999)","DOI":"10.1109\/ROBOT.1999.772512"},{"key":"122_CR4","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1063\/1.165880","volume":"2","author":"H. Nozawa","year":"1992","unstructured":"Nozawa, H.: A Neural Network Model as a Globally Coupled Map and Applications Based on Chaos. Chaos\u00a02, 377\u2013386 (1992)","journal-title":"Chaos"},{"key":"122_CR5","doi-asserted-by":"publisher","first-page":"915","DOI":"10.1016\/0893-6080(95)00033-V","volume":"8","author":"L. Chen","year":"1995","unstructured":"Chen, L., Aihara, K.: Chaotic Simulated Annealing by A Neural Network Model with Transient Chaos. Neural Networks\u00a08, 915\u2013930 (1995)","journal-title":"Neural Networks"},{"key":"122_CR6","doi-asserted-by":"publisher","first-page":"2119","DOI":"10.1109\/TSMCB.2004.829778","volume":"34","author":"L. Wang","year":"2004","unstructured":"Wang, L., et al.: A Noisy Chaotic Neural Network for Solving Combinatorial Optimization Problems: Stochastic Chaotic Simulated Annealing. IEEE Trans. System, Man, Cybern, Part B - Cybernetics\u00a034, 2119\u20132125 (2004)","journal-title":"IEEE Trans. System, Man, Cybern, Part B - Cybernetics"},{"key":"122_CR7","first-page":"311","volume":"21","author":"X. Xu","year":"2004","unstructured":"Xu, X., et al.: Chaotic Neural Network Method for Job-shop Scheduling Problems Based on Improved Computational Energy Function. Control Theory & Applications\u00a021, 311\u2013314 (2004)","journal-title":"Control Theory & Applications"},{"key":"122_CR8","doi-asserted-by":"crossref","unstructured":"Foo, Y.P.S., Takefuji, Y.: Stochastic Neural Networks for Solving Job-shop Scheduling (Parts I): Problem Representation. In: Proc. IEEE Int. Conf. Neural Networks, pp. 275\u2013282 (1988)","DOI":"10.1109\/ICNN.1988.23939"},{"key":"122_CR9","doi-asserted-by":"crossref","unstructured":"Foo, Y.P.S., Takefuji, Y.: Stochastic Neural Networks for Solving Job-shop Scheduling (Parts II): Architecture and Simulations. In: Proc. IEEE Int. Conf. Neural Networks, pp. 283\u2013290 (1988)","DOI":"10.1109\/ICNN.1988.23940"}],"container-title":["Lecture Notes in Computer Science","Advances in Neural Networks \u2014 ISNN 2005"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11427391_122.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,16]],"date-time":"2025-02-16T11:51:54Z","timestamp":1739706714000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11427391_122"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540259121","9783540320654"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/11427391_122","relation":{},"ISSN":["0302-9743"],"issn-type":[{"value":"0302-9743","type":"print"}],"subject":[],"published":{"date-parts":[[2005]]}}}