{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T13:25:55Z","timestamp":1725542755388},"publisher-location":"Berlin, Heidelberg","reference-count":6,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540259121"},{"type":"electronic","value":"9783540320654"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/11427391_125","type":"book-chapter","created":{"date-parts":[[2009,12,29]],"date-time":"2009-12-29T08:05:42Z","timestamp":1262073942000},"page":"782-787","source":"Crossref","is-referenced-by-count":5,"title":["Fuzzy Due Dates Job Shop Scheduling Problem Based on Neural Network"],"prefix":"10.1007","author":[{"given":"Yuan","family":"Xie","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jianying","family":"Xie","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jie","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2005,4,23]]},"reference":[{"key":"125_CR1","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1016\/0165-0114(92)90372-B","volume":"46","author":"H. Ishii","year":"1992","unstructured":"Ishii, H., Tada, M., Masuda, T.: Two Scheduling Problems with Fuzzy Due-dates. Fuzzy Sets and Systems\u00a046, 339\u2013347 (1992)","journal-title":"Fuzzy Sets and Systems"},{"key":"125_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0377-2217(94)90391-3","volume":"79","author":"S. Han","year":"1994","unstructured":"Han, S., Ishii, H., Fujii, S.: One Machine Scheduling System with Fuzzy Duedates. European Journal Operational Research\u00a079, 1\u201312 (1994)","journal-title":"European Journal Operational Research"},{"key":"125_CR3","first-page":"341","volume-title":"Proc. IEEEI JCNN","author":"Y.S. Foo","year":"1988","unstructured":"Foo, Y.S., Takefuji, Y.: Integer Linear Programming Neural Networks for Job Shop Scheduling. In: Proc. IEEEI JCNN, vol.\u00a02, pp. 341\u2013348. IEEE, San Diego (1988)"},{"key":"125_CR4","doi-asserted-by":"publisher","first-page":"191","DOI":"10.1016\/0305-0548(92)90044-6","volume":"19","author":"C. Looi","year":"1992","unstructured":"Looi, C.: Neural Network Methods in Combinatorial Optimization. Computers and Operations Research\u00a019, 191\u2013208 (1992)","journal-title":"Computers and Operations Research"},{"key":"125_CR5","first-page":"706","volume":"21","author":"C.S. Zhang","year":"1995","unstructured":"Zhang, C.S., Yan, P.F.: Neural Network Method of Solving Job Shop Scheduling Problem. ACTA Automation Sinica\u00a021, 706\u2013712 (1995)","journal-title":"ACTA Automation Sinica"},{"key":"125_CR6","first-page":"225","volume-title":"Industrial Scheduling","author":"H. Fisher","year":"1963","unstructured":"Fisher, H., Thompson, G.L.: Probabilistic Learning Combinations of Local Job shop Scheduling Rules. In: Muth, J., Thompson, G. (eds.) Industrial Scheduling, pp. 225\u2013251. Prentice Hall, Englewood Cliffs (1963)"}],"container-title":["Lecture Notes in Computer Science","Advances in Neural Networks \u2014 ISNN 2005"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11427391_125.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T07:07:08Z","timestamp":1619507228000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11427391_125"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540259121","9783540320654"],"references-count":6,"URL":"https:\/\/doi.org\/10.1007\/11427391_125","relation":{},"ISSN":["0302-9743"],"issn-type":[{"type":"print","value":"0302-9743"}],"subject":[],"published":{"date-parts":[[2005]]}}}