{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T13:26:37Z","timestamp":1725542797083},"publisher-location":"Berlin, Heidelberg","reference-count":9,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540259121"},{"type":"electronic","value":"9783540320654"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/11427391_127","type":"book-chapter","created":{"date-parts":[[2009,12,29]],"date-time":"2009-12-29T08:05:42Z","timestamp":1262073942000},"page":"794-799","source":"Crossref","is-referenced-by-count":1,"title":["A Neural Network Based Heuristic for Resource-Constrained Project Scheduling"],"prefix":"10.1007","author":[{"given":"Yongyi","family":"Shou","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2005,4,23]]},"reference":[{"key":"127_CR1","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/S0305-0548(97)00055-5","volume":"25","author":"W. Herroelen","year":"1998","unstructured":"Herroelen, W., de Reyck, B., Demeulemeester, E.: Resource-Constrained Project Scheduling: A Survey of Recent Developments. Comput. Oper. Res.\u00a025, 279\u2013302 (1998)","journal-title":"Comput. Oper. Res."},{"key":"127_CR2","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"29","author":"R. Kolisch","year":"2001","unstructured":"Kolisch, R., Padman, R.: An Integrated Survey of Deterministic Project Scheduling. Omega-Int. J. Manage. Sci.\u00a029, 249\u2013272 (2001)","journal-title":"Omega-Int. J. Manage. Sci."},{"key":"127_CR3","doi-asserted-by":"publisher","first-page":"320","DOI":"10.1016\/0377-2217(95)00357-6","volume":"90","author":"R. Kolisch","year":"1996","unstructured":"Kolisch, R.: Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation. Eur. J. Oper. Res.\u00a090, 320\u2013333 (1996)","journal-title":"Eur. J. Oper. Res."},{"key":"127_CR4","first-page":"113","volume-title":"Advances in Project Scheduling","author":"R. Alvarez-Valdes","year":"1989","unstructured":"Alvarez-Valdes, R., Tamarit, J.M.: Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis. In: Slowinski, R., Weglarz, J. (eds.) Advances in Project Scheduling, pp. 113\u2013134. Elsevier, Amsterdam (1989)"},{"key":"127_CR5","doi-asserted-by":"crossref","first-page":"1145","DOI":"10.1057\/jors.1989.196","volume":"40","author":"G. Ulusoy","year":"1989","unstructured":"Ulusoy, G., Ozdamar, L.: Heuristic Performance and Network\/Resource Characteristics in Resource Constrained Project Scheduling. J. Oper. Res. Soc.\u00a040, 1145\u20131152 (1989)","journal-title":"J. Oper. Res. Soc."},{"key":"127_CR6","first-page":"937","volume-title":"Proceedings of the 1999 Winter Simulation Conference","author":"R.C. Ash","year":"1999","unstructured":"Ash, R.C.: Activity Scheduling in the Dynamic, Multi-Project Setting: Choosing Heuristics through Deterministic Simulation. In: Farrington, P.A., et al. (eds.) Proceedings of the 1999 Winter Simulation Conference, pp. 937\u2013941. ACM Press, New York (1999)"},{"key":"127_CR7","doi-asserted-by":"publisher","first-page":"1343","DOI":"10.1080\/00207540010022368","volume":"39","author":"A. Schirmer","year":"2001","unstructured":"Schirmer, A.: Resource-constrained Project Scheduling: An Evaluation of Adaptive Control Schemes for Parameterized Sampling Heuristics. Int. J. Prod. Res.\u00a039, 1343\u20131365 (2001)","journal-title":"Int. J. Prod. Res."},{"key":"127_CR8","doi-asserted-by":"publisher","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R. Kolisch","year":"1995","unstructured":"Kolisch, R., Sprecher, A., Drexl, A.: Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems. Manage. Sci.\u00a041, 1693\u20131703 (1995)","journal-title":"Manage. Sci."},{"key":"127_CR9","doi-asserted-by":"publisher","first-page":"854","DOI":"10.1287\/mnsc.30.7.854","volume":"30","author":"J.H. Patterson","year":"1984","unstructured":"Patterson, J.H.: A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem. Manage. Sci.\u00a030, 854\u2013867 (1984)","journal-title":"Manage. Sci."}],"container-title":["Lecture Notes in Computer Science","Advances in Neural Networks \u2014 ISNN 2005"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11427391_127.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T07:07:09Z","timestamp":1619507229000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11427391_127"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540259121","9783540320654"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/11427391_127","relation":{},"ISSN":["0302-9743"],"issn-type":[{"type":"print","value":"0302-9743"}],"subject":[],"published":{"date-parts":[[2005]]}}}