{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,5]],"date-time":"2025-11-05T13:59:09Z","timestamp":1762351149498},"publisher-location":"Berlin, Heidelberg","reference-count":14,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540265511"},{"type":"electronic","value":"9783540318934"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/11504894_71","type":"book-chapter","created":{"date-parts":[[2010,4,9]],"date-time":"2010-04-09T12:17:40Z","timestamp":1270815460000},"page":"524-533","source":"Crossref","is-referenced-by-count":41,"title":["A Fuzzy Genetic Algorithm for Real-World Job Shop Scheduling"],"prefix":"10.1007","author":[{"given":"Carole","family":"Fayad","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sanja","family":"Petrovic","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"71_CR1","volume-title":"Scheduling Theory, Algorithms, and Systems","author":"M. Pinedo","year":"2002","unstructured":"Pinedo, M.: Scheduling Theory, Algorithms, and Systems, 2nd edn. Prentice Hall, Englewood Cliffs (2002)","edition":"2"},{"issue":"2","key":"71_CR2","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1016\/S0377-2217(99)00094-6","volume":"120","author":"M. Sakawa","year":"2000","unstructured":"Sakawa, M., Kubota, R.: Fuzzy Programming for Multiobjective Job Shop Scheduling with Fuzzy Processing Time and Fuzzy Duedate through Genetic Algorithms. European Journal of Operational Research\u00a0120(2), 393\u2013407 (2000)","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"71_CR3","doi-asserted-by":"publisher","first-page":"557","DOI":"10.1109\/91.649907","volume":"5","author":"P. Foretemps","year":"1997","unstructured":"Foretemps, P.: Jobshop Scheduling with Imprecise Durations: A Fuzzy Approach. IEEE Transactions on Fuzzy Systems\u00a05(4), 557\u2013569 (1997)","journal-title":"IEEE Transactions on Fuzzy Systems"},{"volume-title":"Scheduling Under Fuzziness","year":"2000","key":"71_CR4","unstructured":"Slowinski, R., Hapke, M. (eds.): Scheduling Under Fuzziness. Physica, New York (2000)"},{"key":"71_CR5","doi-asserted-by":"crossref","unstructured":"Dubois, D., Prade, H.: Possibility Theory: an Approach to Computerized Processing of Uncertainty, New York (1988)","DOI":"10.1007\/978-1-4684-5287-7"},{"issue":"3","key":"71_CR6","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1016\/S0952-1976(01)00011-2","volume":"14","author":"S. Chanas","year":"2001","unstructured":"Chanas, S., Kasperski, A.: Minimizing Maximum Lateness in a Single Machine Scheduling Problem with Fuzzy Processing times and Fuzzy Due Dates. Engineering Applications of Artificial Intelligence\u00a014(3), 377\u2013386 (2001)","journal-title":"Engineering Applications of Artificial Intelligence"},{"issue":"2","key":"71_CR7","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/S0377-2217(02)00561-1","volume":"147","author":"S. Chanas","year":"2003","unstructured":"Chanas, S., Kasperski: On Two Single Machine Scheduling Problems with Fuzzy Processing Times and Fuzzy Due Dates. European Journal of Operational Research\u00a0147(2), 281\u2013296 (2003)","journal-title":"European Journal of Operational Research"},{"key":"71_CR8","doi-asserted-by":"publisher","first-page":"639","DOI":"10.1111\/j.1475-3995.1999.tb00178.x","volume":"6","author":"T. Itoh","year":"1999","unstructured":"Itoh, T., Ishii, H.: Fuzzy Due-date Scheduling Problem with Fuzzy Processing Time. International Transactions in Operations Research\u00a06, 639\u2013647 (1999)","journal-title":"International Transactions in Operations Research"},{"key":"71_CR9","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1016\/0377-2217(93)E0140-S","volume":"81","author":"A. Nagar","year":"1995","unstructured":"Nagar, A., Haddock, J., Heragu, S.: Multiple and Bi-criteria Scheduling: A Literature Survey. European Journal of Operational Research\u00a081, 88\u2013104 (1995)","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"71_CR10","doi-asserted-by":"publisher","first-page":"957","DOI":"10.1016\/0360-8352(96)00045-9","volume":"30","author":"T. Murata","year":"1996","unstructured":"Murata, T., Ishibuchi, H., Tanaka, H.: Multi-Objective Genetic Algorithm and its Applications to Flowshop Scheduling. Computers Industrial Engineering\u00a030(4), 957\u2013968 (1996)","journal-title":"Computers Industrial Engineering"},{"key":"71_CR11","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-5237-6","volume-title":"Multi-Objective Scheduling by Genetic Algorithms","author":"T. Bagchi","year":"1999","unstructured":"Bagchi, T.: Multi-Objective Scheduling by Genetic Algorithms. Kluwer Academic Publishers, Dordrecht (1999)"},{"key":"71_CR12","volume-title":"Evolutionary Algorithms for Solving Multi-Objective Problems","author":"C. Coelho","year":"2002","unstructured":"Coelho, C., Van Veldhuizen, D., Lamont, G.: Evolutionary Algorithms for Solving Multi-Objective Problems. Kluwer Acedmic Publishers, Dordrecht (2002)"},{"key":"71_CR13","volume-title":"Fuzzy Sets, Uncertainty and Information","author":"G. Klir","year":"1988","unstructured":"Klir, G., Folger, T.: Fuzzy Sets, Uncertainty and Information. Prentice Hall, New Jersey (1988)"},{"key":"71_CR14","first-page":"151","volume-title":"Modern Heuristic Techniques for Combinatorial Problems","author":"C. Reeves","year":"1995","unstructured":"Reeves, C.: Genetic Algorithms. In: Rayward-Smith, V.J. (ed.) Modern Heuristic Techniques for Combinatorial Problems, pp. 151\u2013196. McGraw-Hill International, UK (1995) ISBN 0-07-709239-2"}],"container-title":["Lecture Notes in Computer Science","Innovations in Applied Artificial Intelligence"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11504894_71.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T06:43:25Z","timestamp":1619505805000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11504894_71"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540265511","9783540318934"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/11504894_71","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2005]]}}}