{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T21:52:41Z","timestamp":1725573161485},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540282266"},{"type":"electronic","value":"9783540319023"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/11538059_97","type":"book-chapter","created":{"date-parts":[[2005,9,27]],"date-time":"2005-09-27T10:18:36Z","timestamp":1127816316000},"page":"937-946","source":"Crossref","is-referenced-by-count":3,"title":["GA-Based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities\u2019 Cost"],"prefix":"10.1007","author":[{"given":"Zhenyuan","family":"Liu","sequence":"first","affiliation":[]},{"given":"Hongwei","family":"Wang","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"97_CR1","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"3","author":"R. Kolisch","year":"2001","unstructured":"Kolisch, R., Padman, R.: An Integrated Survey of Deterministic Project Scheduling. Omega\u00a03, 249\u2013272 (2001)","journal-title":"Omega"},{"key":"97_CR2","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"1","author":"J. Blazewicz","year":"1983","unstructured":"Blazewicz, J., Lenstra, J.K., Rinnooy, K.-A.H.G.: Scheduling Subject to Resource Constraints: Classification and Complexity. Discrete Applied Mathematics\u00a01, 11\u201324 (1983)","journal-title":"Discrete Applied Mathematics"},{"key":"97_CR3","first-page":"147","volume-title":"Project Scheduling-Recent Models, Algorithms and Applications","author":"R. Kolisch","year":"1999","unstructured":"Kolisch, R., Hartmann, S.: Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis. In: WWeglarz, J. (ed.) Project Scheduling-Recent Models, Algorithms and Applications, pp. 147\u2013178. Kluwer Academic Publishers, Boston (1999)"},{"key":"97_CR4","doi-asserted-by":"publisher","first-page":"512","DOI":"10.1109\/TEVC.2002.804914","volume":"5","author":"K.S. Hindi","year":"2002","unstructured":"Hindi, K.S., Yang, H., Fleszar, K.: An Evolutionary Algorithm for Resource-Constrained Project Scheduling. IEEE Transactions on Evolutionary Computation\u00a05, 512\u2013518 (2002)","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"97_CR5","doi-asserted-by":"crossref","first-page":"678","DOI":"10.1057\/jors.1996.79","volume":"3","author":"J.K. Lee","year":"1996","unstructured":"Lee, J.K., Kim, Y.D.: Search Heuristics for Resource-Constrained Project Scheduling. Journal of the Operational Research Society\u00a03, 678\u2013689 (1996)","journal-title":"Journal of the Operational Research Society"},{"key":"97_CR6","doi-asserted-by":"publisher","first-page":"122","DOI":"10.1080\/07408178708975378","volume":"4","author":"D.D. Smith","year":"1987","unstructured":"Smith, D.D., Smith, D.V.: Optimal Project Scheduling with Materials Ordering. IIE Transactions\u00a04, 122\u2013129 (1987)","journal-title":"IIE Transactions"},{"key":"97_CR7","doi-asserted-by":"publisher","first-page":"1005","DOI":"10.1023\/A:1010994519405","volume":"11","author":"B. Dodin","year":"2001","unstructured":"Dodin, B., Elimam, A.A.: Integrated Project Scheduling and Material Planning with Variable Activity Duration and Rewards. IIE Transactions\u00a011, 1005\u20131018 (2001)","journal-title":"IIE Transactions"},{"key":"97_CR8","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1016\/0377-2217(93)E0294-8","volume":"1","author":"A. Sprecher","year":"1995","unstructured":"Sprecher, A., Kolisch, R., Drexl, A.: Semi-active, Active, and Non-delay Schedules for the Resource-Constrained Project Scheduling Problem. European Journal of Operational Research\u00a01, 94\u2013102 (1995)","journal-title":"European Journal of Operational Research"},{"key":"97_CR9","first-page":"205","volume":"1","author":"R. Kolisch","year":"1996","unstructured":"Kolisch, R., Sprecher, A.: PSPLIB-A Project Scheduling Problem Library. European Journal of Operational Research\u00a01, 205\u2013216 (1996)","journal-title":"European Journal of Operational Research"},{"key":"97_CR10","unstructured":"Liu, Z.Y.: Resource-Constrained Project Scheduling Problem and Its Application in Designing Construction Supply Chain. Ph.D. Dissertation, Huazhong University of Science and Technology (2005)"}],"container-title":["Lecture Notes in Computer Science","Advances in Intelligent Computing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11538059_97.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T02:53:36Z","timestamp":1619492016000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11538059_97"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540282266","9783540319023"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/11538059_97","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2005]]}}}