{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T21:52:42Z","timestamp":1725573162899},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540282266"},{"type":"electronic","value":"9783540319023"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/11538059_98","type":"book-chapter","created":{"date-parts":[[2005,9,27]],"date-time":"2005-09-27T14:18:36Z","timestamp":1127830716000},"page":"947-956","source":"Crossref","is-referenced-by-count":2,"title":["Single-Machine Partial Rescheduling with Bi-criterion Based on Genetic Algorithm"],"prefix":"10.1007","author":[{"given":"Bing","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaoping","family":"Lai","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lifeng","family":"Xi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"98_CR1","doi-asserted-by":"publisher","first-page":"567","DOI":"10.1016\/S0377-2217(99)00311-2","volume":"126","author":"I. Sabuncuoglu","year":"2000","unstructured":"Sabuncuoglu, I., Bayiz, M.: Analysis of Reactive Scheduling Problems in a Job Shop Environment. European Journal of Operational Research\u00a0126, 567\u2013586 (2000)","journal-title":"European Journal of Operational Research"},{"key":"98_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0305-0548(93)90091-V","volume":"20","author":"S.D. Wu","year":"1993","unstructured":"Wu, S.D., Storer, R.H., Chang, P.C.: One-machine Rescheduling Heuristics with Efficiency and Stability as Criteria. Computers in Operations Research\u00a020, 1\u201314 (1993)","journal-title":"Computers in Operations Research"},{"key":"98_CR3","doi-asserted-by":"publisher","first-page":"3059","DOI":"10.1016\/j.cor.2004.11.004","volume":"32","author":"B. Wang","year":"2005","unstructured":"Wang, B., Xi, Y.G., Gu, H.Y.: Terminal Penalty Rolling Scheduling Based on an Initial Schedule for Single-machine Scheduling Problem. Computers and Operations Research\u00a032, 3059\u20133072 (2005)","journal-title":"Computers and Operations Research"},{"key":"98_CR4","first-page":"257","volume":"20","author":"B. Wang","year":"2005","unstructured":"Wang, B., Xi, Y.G., Gu, H.Y.: An Improved Rolling Horizon Procedure for Single-machine Scheduling with Release Times. Kongzhi yu Juece\u00a020, 257\u2013260 (2005)","journal-title":"Kongzhi yu Juece"},{"key":"98_CR5","volume-title":"Computers Intractability","author":"M.R. Garey","year":"1979","unstructured":"Garey, M.R., Johnson, D.S.: Computers Intractability. Freeman, San Francisico (1979)"},{"key":"98_CR6","first-page":"197","volume-title":"Proceeding of the Symposium on Real Time Optimization in Automated Manufacturing Facilities","author":"J.C. Bean","year":"1985","unstructured":"Bean, J.C., Birge, J.R.: Match-up Real-time Scheduling. In: Proceeding of the Symposium on Real Time Optimization in Automated Manufacturing Facilities, pp. 197\u2013212. NBS Publication 724, National Bureau of Standards (1985)"},{"key":"98_CR7","doi-asserted-by":"publisher","first-page":"470","DOI":"10.1287\/opre.39.3.470","volume":"39","author":"J.C. Bean","year":"1991","unstructured":"Bean, J.C., Birge, J.R., Mittenehal, J., Noon, C.E.: Match-up Scheduling with Multiple Resources, Release Dates and Disruption. Operations Research\u00a039, 470\u2013483 (1991)","journal-title":"Operations Research"},{"key":"98_CR8","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/S0377-2217(97)00396-2","volume":"12","author":"M.S. Akturk","year":"1999","unstructured":"Akturk, M.S., Gorgulu, E.: Match-up Scheduling under a Machine Breakdown. European Journal of Operational Research\u00a012, 81\u201397 (1999)","journal-title":"European Journal of Operational Research"},{"key":"98_CR9","doi-asserted-by":"publisher","first-page":"42","DOI":"10.1016\/S0377-2217(82)80007-6","volume":"11","author":"J. Carlier","year":"1982","unstructured":"Carlier, J.: The One-machine Sequencing Problem. European Journal of Operational Research\u00a011, 42\u201347 (1982)","journal-title":"European Journal of Operational Research"},{"key":"98_CR10","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1023\/A:1018961818782","volume":"11","author":"S. Chand","year":"1997","unstructured":"Chand, S., Traub, R., Uzsoy, R.: Rolling Horizon Procedures for the Single Machine Deterministic Total Completion Time Scheduling Problem with Release Dates. Annals of Operations Research\u00a011, 115\u2013125 (1997)","journal-title":"Annals of Operations Research"},{"key":"98_CR11","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1016\/0166-218X(83)90019-7","volume":"11","author":"A.M.A. Hariri","year":"1983","unstructured":"Hariri, A.M.A., Potts, C.N.: An Algorithm for Single Machine Sequencing with Release Dates to Minimize Total Weighted Completion Time. Discrete Applied Mathematics\u00a011, 99\u2013109 (1983)","journal-title":"Discrete Applied Mathematics"}],"container-title":["Lecture Notes in Computer Science","Advances in Intelligent Computing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11538059_98.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T06:53:36Z","timestamp":1619506416000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11538059_98"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540282266","9783540319023"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/11538059_98","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2005]]}}}