{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,6]],"date-time":"2026-03-06T18:56:21Z","timestamp":1772823381525,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":25,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540307051","type":"print"},{"value":"9783540324218","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/11593577_14","type":"book-chapter","created":{"date-parts":[[2005,11,5]],"date-time":"2005-11-05T07:32:45Z","timestamp":1131175965000},"page":"229-243","source":"Crossref","is-referenced-by-count":66,"title":["Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills"],"prefix":"10.1007","author":[{"given":"Odile","family":"Bellenguez","sequence":"first","affiliation":[]},{"given":"Emmanuel","family":"N\u00e9ron","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"14_CR1","doi-asserted-by":"crossref","first-page":"1203","DOI":"10.1057\/jors.1996.149","volume":"47","author":"R. Alvarez-Valdes","year":"1996","unstructured":"Alvarez-Valdes, R., Martin, G., Tamarit, J.M.: Constructing Good Solutions for a School Timetabling Problem. J. Oper. Res. Soc.\u00a047, 1203\u20131215 (1996)","journal-title":"J. Oper. Res. Soc."},{"key":"14_CR2","doi-asserted-by":"publisher","first-page":"473","DOI":"10.1016\/0360-8352(95)00119-L","volume":"29","author":"J. Bailey","year":"1995","unstructured":"Bailey, J.: Optimization and Heuristic Models to Integrate Project Task and Manpower scheduling. Comput. Indust. Eng.\u00a029, 473\u2013476 (1995)","journal-title":"Comput. Indust. Eng."},{"key":"14_CR3","doi-asserted-by":"publisher","first-page":"305","DOI":"10.1023\/A:1018995000688","volume":"92","author":"P. Baptiste","year":"1999","unstructured":"Baptiste, P., Le Pape, C., Nuijten, W.: Satisfiability Tests and Time Bound Adjustments for Cumulative Scheduling Problems. Ann. Oper. Res.\u00a092, 305\u2013333 (1999)","journal-title":"Ann. Oper. Res."},{"key":"14_CR4","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1007\/s00291-003-0155-1","volume":"26","author":"P. Baptiste","year":"2004","unstructured":"Baptiste, P., Demassey, S.: Tight LP Bounds for Resource Constrained Project Scheduling. OR Spectrum\u00a026, 251\u2013262 (2004)","journal-title":"OR Spectrum"},{"key":"14_CR5","unstructured":"Bellenguez, O., N\u00e9ron, E.: An Exact Method for Solving the Multi-skill Project Scheduling Problem. In: Operations Research Conference, Tilburg, pp. 97\u201398 (2004)"},{"key":"14_CR6","unstructured":"Bellenguez, O., N\u00e9ron, E.: Methods for Solving the Multi-skill Project Scheduling Problem. In: 9th Int. Workshop on Project Management and Scheduling, Nancy, pp. 66\u201369 (2004)"},{"key":"14_CR7","doi-asserted-by":"publisher","first-page":"302","DOI":"10.1016\/S0377-2217(02)00762-2","volume":"149","author":"P. Brucker","year":"2003","unstructured":"Brucker, P., Knust, S.: Lower Bounds for Resource-Constrained Project Scheduling Problems. Eur. J. Oper. Res.\u00a0149, 302\u2013313 (2003)","journal-title":"Eur. J. Oper. Res."},{"key":"14_CR8","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1023\/B:JOSH.0000046076.75950.0b","volume":"7","author":"E.K. Burke","year":"2004","unstructured":"Burke, E.K., De Causmaecker, P., Vanden Berghe, G., Van Landeghem, H.: The State of the Art of Nurse Rostering. J. Scheduling 7, 441\u2013499 (2004)","journal-title":"J. Scheduling"},{"key":"14_CR9","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/S0377-2217(97)00341-X","volume":"107","author":"S. Dauz\u00e8re-P\u00e9r\u00e8s","year":"1998","unstructured":"Dauz\u00e8re-P\u00e9r\u00e8s, S., Roux, J., Lasserre, J.B.: Multi-resource Shop Scheduling with Resource Flexibility. Eur. J. Oper. Res. 107, 289\u2013305 (1998)","journal-title":"Eur. J. Oper. Res."},{"key":"14_CR10","unstructured":"Demassey, S., Artigues, C., Michelon, P.: Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project-Scheduling Problem. INFORMS J. Comput. (2003) (in press)"},{"key":"14_CR11","doi-asserted-by":"crossref","first-page":"1485","DOI":"10.1287\/mnsc.43.11.1485","volume":"43","author":"E. Demeulemeester","year":"1997","unstructured":"Demeulemeester, E., Herroelen, W.: New Benchmark Results for the Resource-Constrained Project Scheduling Problem. Manage. Sci. 43, 1485\u20131492 (1997)","journal-title":"Manage. Sci."},{"key":"14_CR12","doi-asserted-by":"crossref","first-page":"538","DOI":"10.1016\/S0377-2217(99)00151-4","volume":"119","author":"B. Reyck","year":"1999","unstructured":"De Reyck, B., Herroelen, W.: The Multi-mode Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Eur. J. Oper. Res. 119, 538\u2013556 (1999)","journal-title":"Eur. J. Oper. Res."},{"key":"14_CR13","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1002\/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-I","volume":"32","author":"S. Hartmann","year":"1998","unstructured":"Hartmann, S., Drexl, A.: Project Scheduling with Multiple Modes: A Comparison of Exact Algorithms. Networks 32, 283\u2013297 (1998)","journal-title":"Networks"},{"key":"14_CR14","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1016\/S0377-2217(98)00121-0","volume":"110","author":"K. Haase","year":"1998","unstructured":"Haase, K., Latteier, J., Schirmer, A.: The Course Scheduling Problem at the Lufthansa Technical Training. Eur. J. Oper. Res. 110, 441\u2013456 (1998)","journal-title":"Eur. J. Oper. Res."},{"key":"14_CR15","doi-asserted-by":"crossref","first-page":"663","DOI":"10.1016\/j.ejor.2004.07.014","volume":"167","author":"T. Hanne","year":"2005","unstructured":"Hanne, T., Nickel, S.: A Multiobjective Evolutionary Algorithm for Scheduling and Inspection Planning in Software Development Projects. Eur. J. Oper. Res. 167, 663\u2013678 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"14_CR16","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1023\/A:1010954031930","volume":"102","author":"J. Josefowska","year":"2001","unstructured":"Josefowska, J., Mika, M., Rozycki, R., Waligora, G., Weglarz, J.: Simulated Annealing for Multi-mode Resource-Constrained Project Scheduling Problem. Ann. Oper. Res. 102, 137\u2013155 (2001)","journal-title":"Ann. Oper. Res."},{"key":"14_CR17","doi-asserted-by":"crossref","first-page":"3937","DOI":"10.1080\/00207540050176094","volume":"38","author":"R. Klein","year":"2000","unstructured":"Klein, R.: Project Scheduling with Time-Varying Resource Constraints. Int. J. Prod. Res. 38, 3937\u20133952 (2000)","journal-title":"Int. J. Prod. Res."},{"key":"14_CR18","first-page":"987","volume":"29","author":"R. Kolisch","year":"1997","unstructured":"Kolisch, R., Drexl, A.: Local Search for Non-preemptive Multi-mode Resource-Constrained Project Scheduling Problem. IIE Trans. 29, 987\u2013999 (1997)","journal-title":"IIE Trans."},{"key":"14_CR19","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"R. Kolisch","year":"1997","unstructured":"Kolisch, R., Sprecher, A.: PSPLIB\u2014A Project Scheduling Problem Library. Eur. J. Oper. Res. 96, 205\u2013216 (1997)","journal-title":"Eur. J. Oper. Res."},{"key":"14_CR20","unstructured":"Kolisch, R., Sprecher, A.: PSPLIB\u2014A Project Scheduling Problem Library (2000), \n                    \n                      ftp:\/\/ftp.bwl.uni-kiel.de\/pub\/operations-research\/psplib\/html\/indes.html"},{"key":"14_CR21","first-page":"453","volume":"26","author":"P. Lopez","year":"1992","unstructured":"Lopez, P., Erschler, J., Esquirol, P.: Ordonnancement de T\u00e2ches sous Contraintes: Une Approche \u00c9nerg\u00e9tique. RAIRO-APII 26, 453\u2013481 (1992)","journal-title":"RAIRO-APII"},{"key":"14_CR22","doi-asserted-by":"crossref","first-page":"714","DOI":"10.1287\/mnsc.44.5.714","volume":"44","author":"A. Mingozzi","year":"1998","unstructured":"Mingozzi, A., Maniezzo, V., Riciardelli, S., Bianco, L.: An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation. Manage. Sci. 44, 714\u2013729 (1998)","journal-title":"Manage. Sci."},{"key":"14_CR23","unstructured":"\u00d6zdamar, L.: A Genetic Algorithm Approach to a General Category Project Scheduling Problem. IEEE Trans. on Systems, Man, and Cybernetics (forthcoming)"},{"key":"14_CR24","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/S0377-2217(97)00348-2","volume":"107","author":"A. Sprecher","year":"1998","unstructured":"Sprecher, A., Drexl, A.: Multi-mode Resource Constrained Project Scheduling Problem by a Simple, General and Powerful Sequencing Algorithm. Eur. J. Oper. Res. 107, 431\u2013450 (1998)","journal-title":"Eur. J. Oper. Res."},{"key":"14_CR25","doi-asserted-by":"crossref","unstructured":"Toroslu, I.: Personnel Assignment Problem with Hierarchical Ordering Constraints. Comput. Indust. Eng, 493\u2013510 (2003)","DOI":"10.1016\/S0360-8352(03)00045-7"}],"container-title":["Lecture Notes in Computer Science","Practice and Theory of Automated Timetabling V"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11593577_14.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T06:51:54Z","timestamp":1619506314000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11593577_14"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540307051","9783540324218"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/11593577_14","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2005]]}}}