{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,4,12]],"date-time":"2025-04-12T23:32:14Z","timestamp":1744500734962},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540340751"},{"type":"electronic","value":"9783540340768"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2006]]},"DOI":"10.1007\/11751595_77","type":"book-chapter","created":{"date-parts":[[2006,5,11]],"date-time":"2006-05-11T14:27:59Z","timestamp":1147357679000},"page":"728-737","source":"Crossref","is-referenced-by-count":7,"title":["Tabu Search Heuristics for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times"],"prefix":"10.1007","author":[{"given":"Sang-Il","family":"Kim","sequence":"first","affiliation":[]},{"given":"Hyun-Seon","family":"Choi","sequence":"additional","affiliation":[]},{"given":"Dong-Ho","family":"Lee","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"77_CR1","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1287\/ijoc.6.2.154","volume":"6","author":"J.C. Bean","year":"1994","unstructured":"Bean, J.C.: Genetic algorithm and random keys for sequencing and optimization. ORSA Journal on Computing\u00a06, 154\u2013160 (1994)","journal-title":"ORSA Journal on Computing"},{"key":"77_CR2","doi-asserted-by":"publisher","first-page":"397","DOI":"10.1016\/S0305-0548(02)00198-3","volume":"31","author":"U. Bilge","year":"2004","unstructured":"Bilge, U., Kirac, F., Kurtulan, M., Pekgun, P.: A tabu search algorithm for parallel machine total tardiness problem. Computers and Operations Research\u00a031, 397\u2013414 (2004)","journal-title":"Computers and Operations Research"},{"key":"77_CR3","doi-asserted-by":"publisher","first-page":"1995","DOI":"10.1016\/j.cor.2004.01.001","volume":"32","author":"D. Cao","year":"2005","unstructured":"Cao, D., Chen, M., Wan, G.: Parallel machine selection and job scheduling to minimize machine cost and job tardiness. Computers and Operations Research\u00a032, 1995\u20132012 (2005)","journal-title":"Computers and Operations Research"},{"key":"77_CR4","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/0377-2217(90)90215-W","volume":"47","author":"T.C.E. Cheng","year":"1990","unstructured":"Cheng, T.C.E., Sin, C.C.S.: A state-of-the-art review of parallel-machine scheduling research. European Journal of Operational Research\u00a047, 271\u2013292 (1990)","journal-title":"European Journal of Operational Research"},{"key":"77_CR5","doi-asserted-by":"crossref","first-page":"2987","DOI":"10.1016\/j.cor.2004.04.012","volume":"32","author":"G.S. Dastidar","year":"2004","unstructured":"Dastidar, G.S., Nagi, R.: Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs. Computers and Operations Research\u00a032, 2987\u20133005 (2004)","journal-title":"Computers and Operations Research"},{"key":"77_CR6","doi-asserted-by":"publisher","first-page":"483","DOI":"10.1287\/moor.15.3.483","volume":"15","author":"J. Du","year":"1990","unstructured":"Du, J., Leung, J.Y.T.: Minimizing total tardiness on one machine is NP-hard. Mathematics of Operations Research\u00a015, 483\u2013495 (1990)","journal-title":"Mathematics of Operations Research"},{"key":"77_CR7","doi-asserted-by":"crossref","first-page":"190","DOI":"10.1287\/ijoc.1.3.190","volume":"1","author":"F. Glover","year":"1989","unstructured":"Glover, F.: Tabu Search: Part I. ORSA Journal on Computing\u00a01, 190\u2013206 (1989)","journal-title":"ORSA Journal on Computing"},{"key":"77_CR8","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1002\/(SICI)1520-6750(199702)44:1<109::AID-NAV7>3.0.CO;2-E","volume":"44","author":"C. Koulamas","year":"1997","unstructured":"Koulamas, C.: Decomposition and hybrid simulated annealing heuristics for the parallel machine total tardiness problem. Naval Research Logistics\u00a044, 109\u2013125 (1997)","journal-title":"Naval Research Logistics"},{"key":"77_CR9","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1007\/BF01471219","volume":"2","author":"M. Laguna","year":"1991","unstructured":"Laguna, M., Barnes, J.W., Glover, F.: Tabu search methods for a single machine scheduling problem. Journal of Intelligent Manufacturing\u00a02, 63\u201374 (1991)","journal-title":"Journal of Intelligent Manufacturing"},{"key":"77_CR10","doi-asserted-by":"publisher","first-page":"793","DOI":"10.1016\/S0360-8352(97)00255-6","volume":"33","author":"M.-W. Park","year":"1997","unstructured":"Park, M.-W., Kim, Y.-D.: Search heuristics for a parallel machine scheduling problem with ready times and due dates. Computers and Industrial Engineering\u00a033, 793\u2013796 (1997)","journal-title":"Computers and Industrial Engineering"},{"key":"77_CR11","doi-asserted-by":"publisher","first-page":"773","DOI":"10.1016\/S0305-0548(98)00090-2","volume":"26","author":"F. Sivrikaya-Serifoglu","year":"1999","unstructured":"Sivrikaya-Serifoglu, F., Ulusoy, G.: Parallel machine scheduling with earliness and tardiness penalties. Computers and Operations Research\u00a026, 773\u2013787 (1999)","journal-title":"Computers and Operations Research"}],"container-title":["Lecture Notes in Computer Science","Computational Science and Its Applications - ICCSA 2006"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11751595_77.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T07:00:15Z","timestamp":1619506815000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11751595_77"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006]]},"ISBN":["9783540340751","9783540340768"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/11751595_77","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2006]]}}}