{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T16:46:11Z","timestamp":1725554771681},"publisher-location":"Berlin, Heidelberg","reference-count":13,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540344827"},{"type":"electronic","value":"9783540344834"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2006]]},"DOI":"10.1007\/11760191_131","type":"book-chapter","created":{"date-parts":[[2006,5,11]],"date-time":"2006-05-11T10:00:36Z","timestamp":1147341636000},"page":"898-905","source":"Crossref","is-referenced-by-count":1,"title":["A Multi-Criteria Decision Making Procedure Based on Neural Networks for Kanban Allocation"],"prefix":"10.1007","author":[{"given":"\u00d6zlem Uzun","family":"Araz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"\u00d6zg\u00fcr","family":"Eski","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ceyhun","family":"Araz","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"131_CR1","doi-asserted-by":"publisher","first-page":"348","DOI":"10.1007\/s001700300040","volume":"21","author":"G.V. Ramanan","year":"2003","unstructured":"Ramanan, G.V., Rajendran, C.: Scheduling in Kanban-Controlled Flowshops to Minimise the Makespan of Containers. Int. J. Adv. Manuf. Technol.\u00a021, 348\u2013354 (2003)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"131_CR2","doi-asserted-by":"publisher","first-page":"881","DOI":"10.1080\/00207549108930108","volume":"29","author":"J.F. Bard","year":"1991","unstructured":"Bard, J.F., Golony, B.: Determining the Number of Kanbans in a Multiproduct, Multistage Production System. Int. J. of Production Research\u00a029, 881\u2013895 (1991)","journal-title":"Int. J. of Production Research"},{"key":"131_CR3","doi-asserted-by":"publisher","first-page":"1173","DOI":"10.1080\/00207549408956994","volume":"32","author":"M.G. Mitwasi","year":"1994","unstructured":"Mitwasi, M.G., Askin, R.G.: Production Planning for A Multi-item, Multi-stage Kanban System. Int. J. of Production Research\u00a032, 1173\u20131195 (1994)","journal-title":"Int. J. of Production Research"},{"key":"131_CR4","doi-asserted-by":"publisher","first-page":"2101","DOI":"10.1080\/00207549008942856","volume":"28","author":"H. Wang","year":"1990","unstructured":"Wang, H., Wang, H.P.: Determining the Number of Kanbans: A Step toward Non-Stock-Production. Int. J. of Production Research\u00a028, 2101\u20132115 (1990)","journal-title":"Int. J. of Production Research"},{"key":"131_CR5","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1080\/07408179308964269","volume":"25","author":"R.G. Askin","year":"1993","unstructured":"Askin, R.G., Mitwasi, M.G., Goldberg, J.B.: Determining the Number of Kanbans in Multi-Item Just-In-Time Systems. IIE Transactions\u00a025, 89\u201397 (1993)","journal-title":"IIE Transactions"},{"key":"131_CR6","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1080\/00207548908942549","volume":"27","author":"Y.P. Gupta","year":"1989","unstructured":"Gupta, Y.P., Gupta, M.C.: A System Dynamics Model for A Multi-Stage, Multi-Line Dual-Card JIT-Kanban System. Int. J. of Production Research\u00a027, 309\u2013352 (1989)","journal-title":"Int. J. of Production Research"},{"key":"131_CR7","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1080\/00207549608905064","volume":"34","author":"M. Savsar","year":"1996","unstructured":"Savsar, M.: Effects of Kanban Withdrawal Policies and Other Factors on the Performance of JIT Systems: A Simulation Study. Int. J. of Production Research\u00a034, 205\u2013214 (1996)","journal-title":"Int. J. of Production Research"},{"key":"131_CR8","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1177\/003754979606700103","volume":"67","author":"H. Aytug","year":"1996","unstructured":"Aytug, H., Dogan, C.A., Bezmez, G.: Determining the Number of Kanbans: A Simulation Metamodeling Approach. Simulation\u00a067, 23\u201332 (1996)","journal-title":"Simulation"},{"key":"131_CR9","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1057\/palgrave.jors.2600468","volume":"48","author":"R.D. Hurrion","year":"1997","unstructured":"Hurrion, R.D.: An Example of Simulation Optimization Using A Neural Network Metamodel: Finding the Optimum Number of Kanbans in Manufacturing System. Journal of the Operation Research Society\u00a048, 1105\u20131112 (1997)","journal-title":"Journal of the Operation Research Society"},{"key":"131_CR10","doi-asserted-by":"publisher","first-page":"3247","DOI":"10.1080\/002075400418243","volume":"38","author":"M. Savsar","year":"2000","unstructured":"Savsar, M., Choueiki, M.H.: A Neural Network Procedure for Kanban Allocation in JIT Production Control Systems. Int. J. of Production Research\u00a038, 3247\u20133265 (2000)","journal-title":"Int. J. of Production Research"},{"key":"131_CR11","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-48318-9","volume-title":"Multiple Attribute Decision Making: Methods and Applications, A State-of-the-Art Survey","author":"C.L. Hwang","year":"1981","unstructured":"Hwang, C.L., Yoon, K.: Multiple Attribute Decision Making: Methods and Applications, A State-of-the-Art Survey. Springer, Berlin (1981)"},{"key":"131_CR12","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-4459-3","volume-title":"Multicriterion Decision in Management: Principles and Practice","author":"J.C. Pomerol","year":"2000","unstructured":"Pomerol, J.C., Romero, S.B.: Multicriterion Decision in Management: Principles and Practice. Kluwer Academic Publishers, USA (2000)"},{"key":"131_CR13","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/0888-613X(95)00119-2","volume":"14","author":"E. Triantaphyllou","year":"1996","unstructured":"Triantaphyllou, E., Lin, C.T.: Development and evaluation of five fuzzy multi-attribute decision making methods. Int. J. of Approximate Reasoning\u00a014, 281\u2013310 (1996)","journal-title":"Int. J. of Approximate Reasoning"}],"container-title":["Lecture Notes in Computer Science","Advances in Neural Networks - ISNN 2006"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11760191_131.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T03:08:58Z","timestamp":1619492938000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11760191_131"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006]]},"ISBN":["9783540344827","9783540344834"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/11760191_131","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2006]]}}}