{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T17:35:12Z","timestamp":1725471312974},"publisher-location":"Berlin, Heidelberg","reference-count":16,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540464846"},{"type":"electronic","value":"9783540464853"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2006]]},"DOI":"10.1007\/11893295_107","type":"book-chapter","created":{"date-parts":[[2006,10,2]],"date-time":"2006-10-02T16:23:21Z","timestamp":1159806201000},"page":"974-982","source":"Crossref","is-referenced-by-count":17,"title":["A Look-Ahead Fuzzy Back Propagation Network for Lot Output Time Series Prediction in a Wafer Fab"],"prefix":"10.1007","author":[{"given":"Toly","family":"Chen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"107_CR1","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1080\/07408179808966489","volume":"30","author":"S. Barman","year":"1998","unstructured":"Barman, S.: The Impact of Priority Rule Combinations on Lateness and Tardiness. IIE Transactions\u00a030, 495\u2013504 (1998)","journal-title":"IIE Transactions"},{"issue":"1","key":"107_CR2","first-page":"55","volume":"10","author":"P.-C. Chang","year":"2003","unstructured":"Chang, P.-C., Hsieh, J.-C.: A Neural Networks Approach for Due-date Assignment in a Wafer Fabrication Factory. International Journal of Industrial Engineering\u00a010(1), 55\u201361 (2003)","journal-title":"International Journal of Industrial Engineering"},{"key":"107_CR3","series-title":"Lecture Notes in Artificial Intelligence","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-44593-5_46","volume-title":"Case-Based Reasoning Research and Development","author":"P.-C. Chang","year":"2001","unstructured":"Chang, P.-C., Hsieh, J.-C., Liao, T.W.: A Case-based Reasoning Approach for Due Date Assignment in a Wafer Fabrication Factory. In: Aha, D.W., Watson, I. (eds.) ICCBR 2001. LNCS (LNAI), vol.\u00a02080, Springer, Heidelberg (2001)"},{"key":"107_CR4","doi-asserted-by":"publisher","first-page":"549","DOI":"10.1007\/s10845-005-1663-4","volume":"16","author":"P.-C. Chang","year":"2005","unstructured":"Chang, P.-C., Hsieh, J.-C., Liao, T.W.: Evolving Fuzzy Rules for Due-date Assignment Problem in Semiconductor Manufacturing Factory. Journal of Intelligent Manufacturing\u00a016, 549\u2013557 (2005)","journal-title":"Journal of Intelligent Manufacturing"},{"key":"107_CR5","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1016\/S1568-4946(02)00066-2","volume":"2\/3F","author":"T. Chen","year":"2003","unstructured":"Chen, T.: A Fuzzy Back Propagation Network for Output Time Prediction in a Wafer Fab. Journal of Applied Soft Computing\u00a02\/3F, 211\u2013222 (2003)","journal-title":"Journal of Applied Soft Computing"},{"issue":"4","key":"107_CR6","doi-asserted-by":"publisher","first-page":"278","DOI":"10.1109\/3476.650959","volume":"20","author":"S.-H. Chung","year":"1997","unstructured":"Chung, S.-H., Yang, M.-H., Cheng, C.-M.: The Design of Due Date Assignment Model and the Determination of Flow Time Control Parameters for the Wafer Fabrication Factories. IEEE Transactions on Components, Packaging, and Manufacturing Technology \u2013 Part C\u00a020(4), 278\u2013287 (1997)","journal-title":"IEEE Transactions on Components, Packaging, and Manufacturing Technology \u2013 Part C"},{"issue":"4","key":"107_CR7","doi-asserted-by":"publisher","first-page":"293","DOI":"10.1016\/0098-1354(92)80049-F","volume":"16","author":"W.R. Foster","year":"1992","unstructured":"Foster, W.R., Gollopy, F., Ungar, L.H.: Neural Network Forecasting of Short, Noisy Time Series. Computers in Chemical Engineering\u00a016(4), 293\u2013297 (1992)","journal-title":"Computers in Chemical Engineering"},{"key":"107_CR8","volume-title":"Genetic Algorithms in Search, Optimization, and Machine Learning","author":"D.E. Goldberg","year":"1989","unstructured":"Goldberg, D.E.: Genetic Algorithms in Search, Optimization, and Machine Learning. Addison-Wesley, Reading (1989)"},{"key":"107_CR9","unstructured":"Hung, Y.-F., Chang, C.-B.: Dispatching Rules Using Flow Time Predictions for Semiconductor Wafer Fabrications. In: Proceedings of the 5th Annual International Conference on Industrial Engineering Theory, Applications and Practice, Taiwan (2001)"},{"issue":"1","key":"107_CR10","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1016\/0165-0114(92)90032-Y","volume":"52","author":"H. Ishibuchi","year":"1992","unstructured":"Ishibuchi, H., Nozaki, K., Tanaka, H.: Distributed Representation of Fuzzy Rules and Its Application to Pattern Classification. Fuzzy Sets and Systems\u00a052(1), 21\u201332 (1992)","journal-title":"Fuzzy Sets and Systems"},{"key":"107_CR11","unstructured":"Lin, C.-Y.: Shop Floor Scheduling of Semiconductor Wafer Fabrication Using Real-time Feedback Control and Prediction. Ph.D. Dissertation, Engineering-Industrial Engineering and Operations Research, University of California at Berkeley (1996)"},{"key":"107_CR12","doi-asserted-by":"publisher","first-page":"310","DOI":"10.1016\/S0377-2217(97)00398-6","volume":"112","author":"S. Piramuthu","year":"1991","unstructured":"Piramuthu, S.: Theory and Methodology \u2013 Financial Credit-risk Evaluation with Neural and Neuralfuzzy Systems. European Journal of Operational Research\u00a0112, 310\u2013321 (1991)","journal-title":"European Journal of Operational Research"},{"key":"107_CR13","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1016\/0272-6963(84)90005-6","volume":"5","author":"G.L. Ragatz","year":"1984","unstructured":"Ragatz, G.L., Mabert, V.A.: A Simulation Analysis of Due Date Assignment. Journal of Operations Management\u00a05, 27\u201339 (1984)","journal-title":"Journal of Operations Management"},{"issue":"7","key":"107_CR14","doi-asserted-by":"publisher","first-page":"1361","DOI":"10.1080\/00207549108948016","volume":"29","author":"M.M. Vig","year":"1991","unstructured":"Vig, M.M., Dooley, K.J.: Dynamic Rules for Due-date Assignment. International Journal of Production Research\u00a029(7), 1361\u20131377 (1991)","journal-title":"International Journal of Production Research"},{"issue":"6","key":"107_CR15","doi-asserted-by":"publisher","first-page":"1414","DOI":"10.1109\/21.199466","volume":"22","author":"L.-X. Wang","year":"1992","unstructured":"Wang, L.-X., Mendel, J.M.: Generating Fuzzy Rules by Learning from Examples. IEEE Transactions on Systems, Man, and Cybernetics\u00a022(6), 1414\u20131427 (1992)","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics"},{"key":"107_CR16","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1287\/mnsc.25.4.363","volume":"25","author":"J.K. Weeks","year":"1979","unstructured":"Weeks, J.K.: A Simulation Study of Predictable Due-dates. Management Science\u00a025, 363\u2013373 (1979)","journal-title":"Management Science"}],"container-title":["Lecture Notes in Computer Science","Neural Information Processing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11893295_107.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T07:35:38Z","timestamp":1619508938000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11893295_107"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006]]},"ISBN":["9783540464846","9783540464853"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/11893295_107","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2006]]}}}