{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T17:57:49Z","timestamp":1725472669330},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540497875"},{"type":"electronic","value":"9783540497882"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2006]]},"DOI":"10.1007\/11941439_154","type":"book-chapter","created":{"date-parts":[[2006,11,17]],"date-time":"2006-11-17T09:53:05Z","timestamp":1163757185000},"page":"1239-1245","source":"Crossref","is-referenced-by-count":0,"title":["A Study of Factors Affecting Due Date Predictibility for On-Time Delivery in a Dynamic Job Shop"],"prefix":"10.1007","author":[{"given":"\u015eerafettin","family":"Alpay","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Nihat","family":"Y\u00fcz\u00fcg\u00fcll\u00fc","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"154_CR1","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1016\/S0360-8352(03)00042-1","volume":"45","author":"A. Lengyel","year":"2003","unstructured":"Lengyel, A., Hatono, I., Ueda, K.: Scheduling for on-time completion in job shops using feasibility function. Computers & Industrial Engineering\u00a045, 215\u2013229 (2003)","journal-title":"Computers & Industrial Engineering"},{"key":"154_CR2","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1016\/S0360-8352(01)00043-2","volume":"41","author":"E.A. Veral","year":"2001","unstructured":"Veral, E.A.: Computer simulation of due-date setting in multi-machine job shops. Computers & Industrial Engineering\u00a041, 77\u201394 (2001)","journal-title":"Computers & Industrial Engineering"},{"key":"154_CR3","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1016\/S0925-5273(01)00131-1","volume":"74","author":"H.P.G. Ooijen van","year":"2001","unstructured":"van Ooijen, H.P.G., Bertrand, J.W.M.: Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions. Int. J. Production Economics\u00a074, 261\u2013268 (2001)","journal-title":"Int. J. Production Economics"},{"key":"154_CR4","doi-asserted-by":"publisher","first-page":"423","DOI":"10.1016\/S0305-0483(02)00058-0","volume":"30","author":"I. Sabuncuoglu","year":"2002","unstructured":"Sabuncuoglu, I., Comlekci, A.: Operation-based flowtime estimation in a dynamic job shop. Omega\u00a030, 423\u2013442 (2002)","journal-title":"Omega"},{"key":"154_CR5","doi-asserted-by":"crossref","unstructured":"Gee, E.S., Smith, C.H.: Selecting allowance policies for improved job shop performance. International Journal of Production Research, 1839\u20132852 (1993)","DOI":"10.1080\/00207549308956826"},{"issue":"2","key":"154_CR6","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1016\/S0360-8352(97)00317-3","volume":"34","author":"T.C.E. Cheng","year":"1998","unstructured":"Cheng, T.C.E., Jiang, J.: Job shop scheduling for missed due dates performance. Computers and Industrial Engineering\u00a034(2), 297\u2013307 (1998)","journal-title":"Computers and Industrial Engineering"},{"issue":"11","key":"154_CR7","doi-asserted-by":"publisher","first-page":"3095","DOI":"10.1080\/002075498192319","volume":"36","author":"E.J. Liao","year":"1998","unstructured":"Liao, E.J., Lin, H.T.: A case study in a dual resource constrained job shop. International Journal of Production Research\u00a036(11), 3095\u20133111 (1998)","journal-title":"International Journal of Production Research"},{"key":"154_CR8","doi-asserted-by":"publisher","first-page":"1093","DOI":"10.1287\/mnsc.30.9.1093","volume":"30","author":"K.R. Baker","year":"1984","unstructured":"Baker, K.R.: Sequencing rules and due-date assignment in a job shop. Management Science\u00a030, 1093\u20131104 (1984)","journal-title":"Management Science"},{"key":"154_CR9","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1016\/0377-2217(89)90100-8","volume":"38","author":"T.C.E. Cheng","year":"1989","unstructured":"Cheng, T.C.E., Gupta, M.C.: Survey of scheduling research involving due date determination decisions. European Journal of Operations Research\u00a038, 156\u2013166 (1989)","journal-title":"European Journal of Operations Research"},{"issue":"6","key":"154_CR10","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1016\/0278-6125(95)90063-Q","volume":"13","author":"F.C.R. Chang","year":"1997","unstructured":"Chang, F.C.R.: A study of factors affecting due date predictability in a simulated dynamic job shop. Journal of Manufacturing Systems\u00a013(6), 393\u2013400 (1997)","journal-title":"Journal of Manufacturing Systems"},{"key":"154_CR11","unstructured":"Alpay, S.: Dynamic Stochastic Multi-Machine Job Shop Scheduling, Eskisehir Osmangazi University, Ph.D. Dissertation, Turkey (2003)"}],"container-title":["Lecture Notes in Computer Science","AI 2006: Advances in Artificial Intelligence"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11941439_154.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T07:51:01Z","timestamp":1619509861000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11941439_154"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006]]},"ISBN":["9783540497875","9783540497882"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/11941439_154","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2006]]}}}