{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T16:46:58Z","timestamp":1725468418541},"publisher-location":"Berlin\/Heidelberg","reference-count":23,"publisher":"Springer-Verlag","isbn-type":[{"type":"print","value":"3540316493"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/3-540-31662-0_57","type":"book-chapter","created":{"date-parts":[[2006,8,10]],"date-time":"2006-08-10T14:41:25Z","timestamp":1155220885000},"page":"749-760","source":"Crossref","is-referenced-by-count":2,"title":["Fuzzy Dispatching of Automated Guided Vehicles"],"prefix":"10.1007","author":[{"given":"Ran","family":"Shneor","sequence":"first","affiliation":[]},{"given":"Sigal","family":"Berman","sequence":"additional","affiliation":[]},{"given":"Yael","family":"Edan","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"15","key":"57_CR1","doi-asserted-by":"publisher","first-page":"3995","DOI":"10.1080\/00207540210146990","volume":"40","author":"S. Berman","year":"2002","unstructured":"Berman, S., Edan, Y., (2002), \u201cDecentralized autonomous AGV system for material handling\u201d, International Journal of Production Research, Vol. 40, No. 15, pp. 3995\u20134006.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"57_CR2","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/0278-6125(96)84549-3","volume":"15","author":"Y. A. Bozer","year":"1996","unstructured":"Bozer, Y., A., and Yen, C., K., (1996), \u201cIntelligent dispatching rules for trip-based material handling systems\u201d, Journal of Manufacturing Systems, Vol. 15, No. 4, pp. 226\u201336.","journal-title":"Journal of Manufacturing Systems"},{"issue":"2","key":"57_CR3","doi-asserted-by":"publisher","first-page":"160","DOI":"10.1109\/70.282541","volume":"10","author":"L. M. M. Custodio","year":"1994","unstructured":"Custodio, L., M., M., and Sentieiro, J., J., S., and Bispo, C., F., G., (1994), \u201cProduction planning and scheduling using a fuzzy decision system\u201d, IEEE Transactions on Robotics and Automation, Vol. 10, No. 2, pp. 160\u2013167.","journal-title":"IEEE Transactions on Robotics and Automation"},{"key":"57_CR4","first-page":"17","volume":"4","author":"P. J. Egbelu","year":"1987","unstructured":"Egbelu, P., J., (1987), \u201cThe use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system\u201d, Material Flow, vol. 4, pp. 17\u201332.","journal-title":"Material Flow"},{"key":"57_CR5","doi-asserted-by":"crossref","unstructured":"Egbelu, P., J., and Tanchoco, J., A., (1984), \u201cCharacterization of automatic guided vehicles dispatching rules\u201d, International Journal of Production Research, Vol. 22, No. 3.","DOI":"10.1080\/00207548408942459"},{"issue":"4","key":"57_CR6","doi-asserted-by":"crossref","first-page":"903","DOI":"10.1080\/00207549408956978","volume":"32","author":"B. Garbot","year":"1994","unstructured":"Garbot, B., and Geneste, L., (1994), \u201cDispatching rules in scheduling: a fuzzy approach\u201d, International Journal of Production Research, Vol. 32, No. 4, pp. 903\u2013915.","journal-title":"International Journal of Production Research"},{"issue":"5","key":"57_CR7","doi-asserted-by":"crossref","first-page":"927","DOI":"10.1080\/00207549008942764","volume":"28","author":"W. G. Goetz Jr.","year":"1990","unstructured":"Goetz, Jr. W., G., and Egbelu, P., J., (1990), \u201cGuide path design and location of load pick-up\/drop-off points for an automated guided vehicle system\u201d, International Journal of Production Research, Vol. 28, No. 5, pp. 927\u2013941.","journal-title":"International Journal of Production Research"},{"issue":"5","key":"57_CR8","doi-asserted-by":"publisher","first-page":"296","DOI":"10.1108\/09576069810230400","volume":"9","author":"E. B. Hoff","year":"1998","unstructured":"Hoff, E., B., and Sarker, B., R., (1998), \u201cAn overview of path design and dispatching methods for automated guided vehicles\u201d, Integrated Manufacturing Systems, Vol. 9, No. 5, pp. 296\u2013307.","journal-title":"Integrated Manufacturing Systems"},{"issue":"2","key":"57_CR9","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1016\/S0278-6125(98)80026-5","volume":"17","author":"H. Hwang","year":"1998","unstructured":"Hwang H., and Kim, S. H., (1998), \u201cDevelopment of dispatching rules for automated guided vehicle systems\u201d, Journal of Manufacturing Systems, Vol. 17, No. 2, pp. 137\u2013143.","journal-title":"Journal of Manufacturing Systems"},{"issue":"17","key":"57_CR10","doi-asserted-by":"publisher","first-page":"4053","DOI":"10.1080\/002075499189925","volume":"37","author":"C. W. Kim","year":"1999","unstructured":"Kim, C., W., Tanchoco, J., M., A., and Koo, R., H., (1999), \u201cAGV dispatching base on workload balancing\u201d, International Journal of Production Research, Vol. 37, No. 17, pp. 4053\u20134066.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"57_CR11","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1080\/09537289108919329","volume":"2","author":"R. E. King","year":"1991","unstructured":"King, R., E., and Wilson, C., (1991), \u201cA review of automated guided vehicles systems design and scheduling\u201d, Production Planning and Control, Vol. 2, No. 1, pp. 44\u201351.","journal-title":"Production Planning and Control"},{"key":"57_CR12","first-page":"3","volume":"4","author":"G. A. Koff","year":"1987","unstructured":"Koff, G., A., (1987), \u201cAutomated guided vehicle systems: applications, controls and planning\u201d, Material Flow, vol. 4, pp. 3\u201316.","journal-title":"Material Flow"},{"issue":"2","key":"57_CR13","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1177\/003754979606600208","volume":"66","author":"J. Lee","year":"1996","unstructured":"Lee, J., (1996), \u201cComposite dispatching rules for multiple-vehicle AGV systems\u201d, Simulation, Vol. 66, No. 2, pp. 121\u2013130.","journal-title":"Simulation"},{"key":"57_CR14","first-page":"65","volume":"4","author":"L. C. Leung","year":"1987","unstructured":"Leung L., C., and Khator, S., K., and Kimbler, D., L., (1987), \u201cAssignment of AGVS with different vehicle types\u201d, Material Flow, vol. 4, pp. 65\u201372.","journal-title":"Material Flow"},{"issue":"4 and 5","key":"57_CR15","doi-asserted-by":"crossref","first-page":"290","DOI":"10.1080\/09511929208944537","volume":"5","author":"C. M. Liu","year":"1992","unstructured":"Liu, C., M., and Duh, S., H., (1992), \u201cStudy of AGVS design and dispatching rules by analytical and simulation methods\u201d, International Journal of Computer Integrated Manufacturing, Vol. 5, No. 4 and 5, pp. 290\u20139.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"7","key":"57_CR16","doi-asserted-by":"publisher","first-page":"662","DOI":"10.1080\/095372897234768","volume":"8","author":"A. Naumann","year":"1997","unstructured":"Naumann, A., and Gu, P., (1997), \u201cReal-time part dispatching within manufacturing cells using fuzzy logic\u201d, Production planning & control, Vol. 8, No. 7, pp. 662\u2013669.","journal-title":"Production planning & control"},{"issue":"5","key":"57_CR17","doi-asserted-by":"crossref","first-page":"1059","DOI":"10.1080\/00207549208942943","volume":"30","author":"I. Sabuncuoglu","year":"1992","unstructured":"Sabuncuoglu, I., and Hommertzheim, D., L., (1992), \u201cDynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system\u201d, International Journal of Production Research, Vol. 30, No. 5, pp. 1059\u201379.","journal-title":"International Journal of Production Research"},{"issue":"5","key":"57_CR18","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1080\/00207540110105662","volume":"40","author":"D. Sinriech","year":"2002","unstructured":"Sinriech, D., and Kotlarski J., (2002), \u201cA dynamic scheduling algorithm for a multiple-load multiple-carrier system\u201d, International Journal of Production Research, Vol. 40, No. 5, pp. 1065\u20131080.","journal-title":"International Journal of Production Research"},{"key":"57_CR19","unstructured":"Shneor, R., Avraham, R., Amar, S., Shitrit, Y., (2002), \u201cImplementing project management according to TOC in aerial maintenance unit\u201d, 12th IE&M National Conference, Tel-Aviv, Israel."},{"key":"57_CR20","unstructured":"Shneor, R., (2004), \u201cFuzzy dispatching of AGV\u201d, M.Sc thesis, Ben-gurion university, Beer-sheva, Israel."},{"issue":"4","key":"57_CR21","doi-asserted-by":"publisher","first-page":"632","DOI":"10.1109\/3477.865187","volume":"30","author":"K. K. Tan","year":"2002","unstructured":"Tan, K., K., and Tan, K., C., and Tang, K., Z., (2002), \u201cEvolutionary tuning of a fuzzy dispatching system for automated guided vehicles\u201d, Systems, Man and Cybernetics, Part B, IEEE Transactions on, Vol. 30, No. 4, pp. 632\u2013636.","journal-title":"Systems, Man and Cybernetics, Part B, IEEE Transactions on"},{"key":"57_CR22","volume-title":"Facilities Planning","author":"White Tompkins","year":"1984","unstructured":"Tompkins, White, Bozer, Frazelle, Tanchoco, Trevino, (1984), Facilities Planning, 2nd ed., John Wiley & Sons, New York.","edition":"2nd ed."},{"issue":"1","key":"57_CR23","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1080\/00207549308956712","volume":"31","author":"D. Yim","year":"1993","unstructured":"Yim, D., and Linn, R., J., (1993), \u201cPush and pull rules for dispatching automated guided vehicles in a flexible manufacturing system\u201d, International Journal of Production Research, Vol. 31, No. 1, pp. 43\u201357.","journal-title":"International Journal of Production Research"}],"container-title":["Advances in Soft Computing","Applied Soft Computing Technologies: The Challenge of Complexity"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-31662-0_57.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,28]],"date-time":"2021-04-28T01:23:24Z","timestamp":1619573004000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-31662-0_57"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["3540316493"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/3-540-31662-0_57","relation":{},"subject":[]}}