{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T22:32:34Z","timestamp":1725489154295},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540001317"},{"type":"electronic","value":"9783540361312"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2002]]},"DOI":"10.1007\/3-540-36131-6_38","type":"book-chapter","created":{"date-parts":[[2007,8,12]],"date-time":"2007-08-12T01:42:30Z","timestamp":1186882950000},"page":"371-380","source":"Crossref","is-referenced-by-count":1,"title":["A Genetic Algorithm for Solving a Production and Delivery Scheduling Problem with Time Windows"],"prefix":"10.1007","author":[{"given":"Jose","family":"Manuel Garcia","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sebastian","family":"Lozano","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fernando","family":"Guerrero","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ignacio","family":"Eguia","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2002,11,5]]},"reference":[{"key":"38_CR1","doi-asserted-by":"crossref","first-page":"510","DOI":"10.1287\/opre.44.3.510","volume":"44","author":"N.G. Hall","year":"1996","unstructured":"Hall N.G. and Sriskandarajah C.: A survey of machine scheduling problems with blocking and no-wait in process. Operations Research, 44, (1996) 510\u2013525.","journal-title":"Operations Research"},{"key":"38_CR2","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1016\/0377-2217(93)90248-L","volume":"70","author":"C. Sriskandarajah","year":"1993","unstructured":"Sriskandarajah C.: Performance of scheduling algorithms for no-wait flowshops with parallel machines. European Journal of Operations Research, 70, (1993) 365\u2013378.","journal-title":"European Journal of Operations Research"},{"key":"38_CR3","doi-asserted-by":"publisher","first-page":"646","DOI":"10.1080\/07408179508936780","volume":"27","author":"A. Ramudhin","year":"1995","unstructured":"Ramudhin A. and Ratliff H.D.: Generating daily production schedules in process industries. IIE Transactions, 27, (1995) 646\u2013656.","journal-title":"IIE Transactions"},{"key":"38_CR4","doi-asserted-by":"publisher","first-page":"190","DOI":"10.1016\/0377-2217(93)E0335-U","volume":"82","author":"L.G. Kroon","year":"1995","unstructured":"Kroon L.G., Salomon M. and Van Wassenhove L. N.: Exact and approximation algorithms for the operational fixed interval scheduling problem. European Journal of Operational Research, 82, (1995) 190\u2013205.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"38_CR5","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1287\/opre.26.1.68","volume":"26","author":"I. Gertsbakh","year":"1978","unstructured":"Gertsbakh I. and Stern H.: Minimal Resources for Fixed and Variable Job Schedules. Operations Research, 26 (1), (1978) 68\u201385.","journal-title":"Operations Research"},{"key":"38_CR6","doi-asserted-by":"publisher","first-page":"320","DOI":"10.1016\/0377-2217(95)00010-N","volume":"83","author":"V. Gabrel","year":"1995","unstructured":"Gabrel V.: Scheduling jobs within time windows on identical parallel machines: New model and algorithms. European Journal of Operations Research, 83, (1995) 320\u2013329.","journal-title":"European Journal of Operations Research"},{"key":"38_CR7","unstructured":"Goldberg, D. E.: Genetic Algorithms in Search, Optimization, and Machine Learning. (1989). New York, NY: Addison-Wesley."},{"key":"38_CR8","unstructured":"Garcia J. M., Smith K., Lozano S. and Guerrero F.: A Comparison of GRASP and an Exact Method for Solving a Production and Delivery Scheduling Problem. Proceedings of the International workshop on Hybrid Intelligent Systems HIS\u20192001, Adelaide, Australia. (2001)."},{"key":"38_CR9","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0166-218X(87)90037-0","volume":"18","author":"E.M. Arking","year":"1987","unstructured":"Arking E.M., Silverberg E.B.: Scheduling jobs with fixed start and end times. Discrete Applied Mathematics 18, (1987) 1\u20138.","journal-title":"Discrete Applied Mathematics"},{"key":"38_CR10","unstructured":"Kaufmann, M.: Fundations of Genetic Algorithms. Edited by Gregory J.E. Rawlins, San Mateo California, (1991)."},{"key":"38_CR11","unstructured":"Garcia J. M., Smith K., Lozano S., Guerrero F. and Calle M.: Production and Delivery Scheduling Problem with Time Windows. Proceedings of The 30-th International Conference on Computers and Industrial Engineering, Tynos Island, Greece (2002) 263\u2013268."}],"container-title":["Lecture Notes in Computer Science","Advances in Artificial Intelligence \u2014 IBERAMIA 2002"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-36131-6_38","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,1,24]],"date-time":"2019-01-24T15:57:04Z","timestamp":1548345424000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-36131-6_38"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002]]},"ISBN":["9783540001317","9783540361312"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/3-540-36131-6_38","relation":{},"ISSN":["0302-9743"],"issn-type":[{"type":"print","value":"0302-9743"}],"subject":[],"published":{"date-parts":[[2002]]}}}