{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T22:32:37Z","timestamp":1725489157058},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540001317"},{"type":"electronic","value":"9783540361312"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2002]]},"DOI":"10.1007\/3-540-36131-6_83","type":"book-chapter","created":{"date-parts":[[2007,8,12]],"date-time":"2007-08-12T01:42:30Z","timestamp":1186882950000},"page":"815-824","source":"Crossref","is-referenced-by-count":2,"title":["Scheduling as Heuristic Search with State Space Reduction"],"prefix":"10.1007","author":[{"given":"Ramiro","family":"Varela","sequence":"first","affiliation":[]},{"given":"Elena","family":"Soto","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2002,11,5]]},"reference":[{"key":"83_CR1","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/S0004-3702(99)00099-5","volume":"117","author":"J. Ch. Beck","year":"2000","unstructured":"Beck, J. Ch., and Fox, M. S. Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics. Artificial Intelligence117, 31\u201381(2000).","journal-title":"Artificial Intelligence"},{"issue":"1","key":"83_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1162\/evco.1999.7.1.1","volume":"7","author":"Ch. Bierwirth","year":"1999","unstructured":"Bierwirth, Ch., and Mattfeld D. C., Production Scheduling and Rescheduling with Genetic Algoritms. Evolutionary Computation7 (1), 1\u201317(1999).","journal-title":"Evolutionary Computation"},{"key":"83_CR3","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1016\/S0004-3702(01)00108-4","volume":"129","author":"B. Bonet","year":"2001","unstructured":"Bonet, B., Geffner, H., Planning as Heuristic Search, Art. Intelligence129,5\u201333, (2001).","journal-title":"Art. Intelligence"},{"key":"83_CR4","doi-asserted-by":"publisher","first-page":"487","DOI":"10.1287\/opre.8.4.487","volume":"8","author":"B. Giffler","year":"1960","unstructured":"Giffler, B. Thomson, G. L. Algorithms for Solving Production Scheduling Problems.Operations Reseach8, 487\u2013503(1960).","journal-title":"Operations Reseach"},{"key":"83_CR5","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1007\/BF02682439","volume":"7","author":"L. Hatzikonstantis","year":"1992","unstructured":"Hatzikonstantis, L. and Besant, C. B., Job-Shop Scheduling Using Certain Heuristic Search Algorithms. Int. J. Adv. Manuf. Tecnol. 7, 251\u2013261 (1992).","journal-title":"Int. J. Adv. Manuf. Tecnol."},{"key":"83_CR6","unstructured":"Nilsson, N., Principles of Artificial Intelligence, Tioga, Palo Alto, CA, 1980."},{"key":"83_CR7","unstructured":"Pearl, J., Heuristics, Morgan Kauffman, San Francisco, CA, 1983."},{"key":"83_CR8","volume-title":"Machine Intelligence","author":"I. Pohl","year":"1977","unstructured":"Pohl, I., Practical and theoretical considerations in heuristic search algorithms, Machine Intelligence8, Ed.E. W. Elcock and D. Michie, Ellis H. Ltd., Chich., G.B., 1977."},{"key":"83_CR9","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0004-3702(95)00098-4","volume":"86","author":"N. Sadeh","year":"1996","unstructured":"Sadeh, N., Fox, M.S., Variable and Value Ordering Heuristics for the Job Shop Scheduling Constraint Satisfaction Problem.Artificial Intelligence 86, 1\u201341 (1996).","journal-title":"Artificial Intelligence"},{"key":"83_CR10","unstructured":"Soto, Elena, Resoluci\u00f3n de problemas de Satisfacci\u00f3n de Restriciones con el Algoritmo A*. Proyecto fin de carrera nro. 1012076. ETSII e II de Gij\u00f3n. Univ. de Oviedo. (2002)."},{"key":"83_CR11","doi-asserted-by":"crossref","first-page":"1494","DOI":"10.1287\/mnsc.38.10.1495","volume":"38","author":"R. Storer","year":"1992","unstructured":"Storer, R., and Talbot, F. New search spaces for sequencing problems with application to job shop scheduling. Management Science38, 1494\u20131509 (1992).","journal-title":"Management Science"}],"container-title":["Lecture Notes in Computer Science","Advances in Artificial Intelligence \u2014 IBERAMIA 2002"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-36131-6_83","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,2,21]],"date-time":"2019-02-21T08:33:09Z","timestamp":1550737989000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-36131-6_83"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002]]},"ISBN":["9783540001317","9783540361312"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/3-540-36131-6_83","relation":{},"ISSN":["0302-9743"],"issn-type":[{"type":"print","value":"0302-9743"}],"subject":[],"published":{"date-parts":[[2002]]}}}