{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,23]],"date-time":"2026-02-23T21:23:21Z","timestamp":1771881801925,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":16,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540417453","type":"print"},{"value":"9783540447191","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2001]]},"DOI":"10.1007\/3-540-44719-9_33","type":"book-chapter","created":{"date-parts":[[2010,3,1]],"date-time":"2010-03-01T15:42:59Z","timestamp":1267458179000},"page":"472-485","source":"Crossref","is-referenced-by-count":5,"title":["Comparison of Multiple Objective Genetic Algorithms for Parallel Machine Scheduling Problems"],"prefix":"10.1007","author":[{"given":"W.","family":"Matthew Carlyle","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bosun","family":"Kim","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"John W.","family":"Fowler","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Esma S.","family":"Gel","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2001,7,6]]},"reference":[{"key":"33_CR1","doi-asserted-by":"publisher","first-page":"408","DOI":"10.1016\/0377-2217(94)00251-7","volume":"89","author":"Y. Aksoy","year":"1996","unstructured":"Aksoy, Y., T. W. Butler and E. D. Minor, (1996) Comparative studies in interactive multiple objective mathematical programming, European Journal of Operational Research, 89, 408\u2013422.","journal-title":"European Journal of Operational Research"},{"key":"33_CR2","unstructured":"Cochran, J. K., S.-M. Horng, and Fowler, J. W., (2000), A Multi Population Genetic Algorithm to Solve Parallel Machine Scheduling Problem with Sequence Dependent Setups. Working Paper, Arizona State University, Department of Industrial Engineering."},{"issue":"3","key":"33_CR3","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1007\/BF03325101","volume":"1","author":"C. A. C. Coello Coello","year":"1999","unstructured":"Coello, C. A. C., (Aug., 1999), A Comprehensive Survey of Evolutionary-Based Multiobjective Optimization Techniques, An International Journal of Knowledge and Information Systems, 1(3):269\u2013308.","journal-title":"An International Journal of Knowledge and Information Systems"},{"key":"33_CR4","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1002\/(SICI)1099-1360(199801)7:1<34::AID-MCDA161>3.0.CO;2-6","volume":"7","author":"P. Czyzak","year":"1998","unstructured":"Czyzak, P. and A. Jaszkiewicz, (1998). Pareto Simulated annealing \u2014 A Metaheuristic Technique for Multiple-Objective Combinatorial Optimization. Journal of Multi-Criteria Decision Analyses, 7, 34\u201347.","journal-title":"Journal of Multi-Criteria Decision Analyses"},{"issue":"4","key":"33_CR5","first-page":"501","volume":"38","author":"R. L. Daniels","year":"1992","unstructured":"Daniels, R. L., (1992). Analytical evaluation of multi-criteria heuristics. Management Science, 38(4), 501\u2013513.","journal-title":"Analytical evaluation of multi-criteria heuristics"},{"key":"33_CR6","doi-asserted-by":"publisher","first-page":"596","DOI":"10.1111\/j.1540-5915.1992.tb00407.x","volume":"23","author":"P. De","year":"1992","unstructured":"De, P., J. B. Ghosh, and C. E. Wells, (1992), Heuristic Estimation of the Efficient Frontier for a Bi-Criteria Scheduling Problem. Decision Sciences, 23, 596\u2013609.","journal-title":"Decision Sciences"},{"key":"33_CR7","doi-asserted-by":"crossref","unstructured":"Kim B., E. S. Gel, M. W. Carlyle, J. W. Fowler, (2000), A new technique to compare algorithms for bi-criteria combinatorial optimization problems, submitted to Proceedings of the 15th International Conference on Multiple Criteria Decision Making, to appear.","DOI":"10.1007\/978-3-642-56680-6_10"},{"key":"33_CR8","unstructured":"Louis, S. J. and G. J. E. Rawlins, (1993), Pareto-optimality, GA-easiness and Deception. Proceedings of the International Conference on Genetic Algorithms, 118\u2013123."},{"issue":"4","key":"33_CR9","doi-asserted-by":"publisher","first-page":"957","DOI":"10.1016\/0360-8352(96)00045-9","volume":"30","author":"T. Murata","year":"1996","unstructured":"Murata, T., H. Ishibuchi, and H. Tanaka, (1996), Multi-objective genetic algorithm and its application to flowshop scheduling. Computers and Industrial Engineering, 30(4), 957\u2013968.","journal-title":"Computers and Industrial Engineering"},{"key":"33_CR10","unstructured":"Myers, R. H. and D.C. Montgomery, (1995), Response Surface Methodology \u2014 Process and Product Optimization Using Designed Experiments, John Wiley & Sons, New York."},{"key":"33_CR11","unstructured":"Pinedo, M., (1995), Scheduling: Theory, Algorithms, and Systems. Prentice Hall, New Jersey."},{"key":"33_CR12","unstructured":"Schaffer, J.D., (1985), Multiple objective optimization with vector evaluated genetic algorithms. Proceedings of the First International Conference on Genetic Algorithms, 93\u2013100."},{"key":"33_CR13","doi-asserted-by":"publisher","first-page":"773","DOI":"10.1016\/S0305-0548(98)00090-2","volume":"26","author":"F. S. Serifoglu","year":"1999","unstructured":"Serifoglu, F. S. and G. Ulusoy, (1999), Parallel Machine Scheduling with Earliness and Tardiness Penalties. Computers & Operations Research, 26, 773\u2013787.","journal-title":"Computers & Operations Research"},{"key":"33_CR14","unstructured":"Valenzuela-Rendon, M. and E. Uresti-Charre, (1997), A Non-Generational Genetic Algorithm for Multiobjective Optimization, Proceedings of the International Conference on Genetic Algorithms, pp 658\u2013665"},{"key":"33_CR15","doi-asserted-by":"publisher","first-page":"359","DOI":"10.1016\/S0377-2217(99)00163-0","volume":"120","author":"A. Viana","year":"2000","unstructured":"Viana, A. and J. P. Sousa, (2000). Using metaheuristics in multi-objective resource constrained project scheduling. European Journal of Operations Research, 120, 359\u2013374.","journal-title":"European Journal of Operations Research"},{"key":"33_CR16","doi-asserted-by":"crossref","unstructured":"Zitzler, E. and L. Thiele, (Sep. 1998), Multiobjective Optimization Using Evolutionary Algorithms \u2014 A Comparative Case Study. In A. E. Eiben, Editor, Parallel Problem Solving from Nature V, 292\u2013301, Amsterdam, Springer-Verlag.","DOI":"10.1007\/BFb0056872"}],"container-title":["Lecture Notes in Computer Science","Evolutionary Multi-Criterion Optimization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-44719-9_33","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,26]],"date-time":"2019-05-26T10:22:00Z","timestamp":1558866120000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-44719-9_33"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001]]},"ISBN":["9783540417453","9783540447191"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/3-540-44719-9_33","relation":{},"ISSN":["0302-9743"],"issn-type":[{"value":"0302-9743","type":"print"}],"subject":[],"published":{"date-parts":[[2001]]}}}