{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T22:04:30Z","timestamp":1725487470718},"publisher-location":"Berlin, Heidelberg","reference-count":12,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540426011"},{"type":"electronic","value":"9783540454113"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2001]]},"DOI":"10.1007\/3-540-45411-x_39","type":"book-chapter","created":{"date-parts":[[2007,7,16]],"date-time":"2007-07-16T12:17:28Z","timestamp":1184588248000},"page":"369-381","source":"Crossref","is-referenced-by-count":12,"title":["A Constraint-Based Architecture for Flexible Support to Activity Scheduling"],"prefix":"10.1007","author":[{"given":"Amedeo","family":"Cesta","sequence":"first","affiliation":[]},{"given":"Gabriella","family":"Cortellessa","sequence":"additional","affiliation":[]},{"given":"Angelo","family":"Oddi","sequence":"additional","affiliation":[]},{"given":"Nicola","family":"Policella","sequence":"additional","affiliation":[]},{"given":"Angelo","family":"Susi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2001,9,7]]},"reference":[{"key":"39_CR1","unstructured":"J.C. Beck. Heuristics for Constraint-DirectedS cheduling with Inventory. In Proceedings of the Fifth Int. Conf. on Artificial Intelligence Planning and Scheduling (AIPS-00), 2000."},{"key":"39_CR2","doi-asserted-by":"crossref","unstructured":"P. Brucker, A. Drexl, R. Mohring, K. Neumann, and E. Pesch. Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods. European Journal of Operations Research, 1998.","DOI":"10.1016\/S0377-2217(98)00204-5"},{"key":"39_CR3","unstructured":"A. Cesta, A. Oddi, and S.F. Smith. Profile Based Algorithms to Solve Multiple CapacitatedM etric Scheduling Problems. In Proceedings of the Fourth Int. Conf. on Artificial Intelligence Planning Systems (AIPS-98), 1998."},{"key":"39_CR4","doi-asserted-by":"crossref","unstructured":"A. Cesta, A. Oddi, and S.F. Smith. A Constrained-Based Method for Project Scheduling with Time Windows. Journal of Heuristics, 2002.","DOI":"10.1023\/A:1013617802515"},{"key":"39_CR5","unstructured":"A. Cesta, A. Oddi, and A. Susi. O-OSCAR: A Flexible Object-Oriented Architecture for Schedule Management in Space Applications. In Proceedings of the Fifth Int. Symp. on Artificial Intelligence, Robotics and Automation in Space (i-SAIRAS-99), 1999."},{"key":"39_CR6","doi-asserted-by":"crossref","unstructured":"A. Cesta and C. Stella. A Time andR esource Problem for Planning Architectures. In Proceedings of the Fourth European Conference on Planning (ECP 97), 1997.","DOI":"10.1007\/3-540-63912-8_80"},{"issue":"1","key":"39_CR7","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1016\/S0377-2217(97)00305-6","volume":"111","author":"B. Reyck De","year":"1998","unstructured":"B. De Reyck and W. Herroelen. A Branch-and-Bound Procedure for the Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. European Journal of Operations Research, 111(1):152\u2013174, 1998.","journal-title":"European Journal of Operations Research"},{"key":"39_CR8","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1016\/0004-3702(91)90006-6","volume":"49","author":"R. Dechter","year":"1991","unstructured":"R. Dechter, I. Meiri, and J. Pearl. Temporal constraint networks. Artificial Intelligence, 49:61\u201395, 1991.","journal-title":"Artificial Intelligence"},{"key":"39_CR9","unstructured":"K. Neumann and C. Schwindt. Project Scheduling with Inventory Constraints. Technical Report WIOR-572, Universit\u00e4t Karlsruhe, 1999."},{"key":"39_CR10","unstructured":"A. Oddi and S.F. Smith. Stochastic Procedures for Generating Feasible Schedules. In Proceedings 14th National Conference on AI (AAAI-97), 1997."},{"key":"39_CR11","unstructured":"N. Policella. Problemi di scheduling con risorse consumabili, risoluzione con approccio a vincoli in una architettura software orientata agli oggetti. Master\u2019s thesis, Universit\u00e0 di Roma \u201cLa Sapienza\u201d, March 2001. In Italian."},{"key":"39_CR12","doi-asserted-by":"publisher","first-page":"373","DOI":"10.1016\/0167-9236(94)90082-5","volume":"11","author":"G. Wolf","year":"1994","unstructured":"G. Wolf. Schedule Management: An Object-Oriented Approach. Decision Support Systems, 11:373\u2013388, 1994.","journal-title":"Decision Support Systems"}],"container-title":["Lecture Notes in Computer Science","AI*IA 2001: Advances in Artificial Intelligence"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-45411-X_39","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,30]],"date-time":"2019-04-30T23:27:47Z","timestamp":1556666867000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-45411-X_39"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001]]},"ISBN":["9783540426011","9783540454113"],"references-count":12,"URL":"https:\/\/doi.org\/10.1007\/3-540-45411-x_39","relation":{},"ISSN":["0302-9743"],"issn-type":[{"type":"print","value":"0302-9743"}],"subject":[],"published":{"date-parts":[[2001]]}}}