{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,10]],"date-time":"2026-11-10T22:42:35Z","timestamp":1794350555024,"version":"4.9.0"},"publisher-location":"Berlin, Heidelberg","reference-count":18,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540434191","type":"print"},{"value":"9783540460022","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2002]]},"DOI":"10.1007\/3-540-46002-0_9","type":"book-chapter","created":{"date-parts":[[2007,10,28]],"date-time":"2007-10-28T02:29:59Z","timestamp":1193538599000},"page":"113-126","source":"Crossref","is-referenced-by-count":33,"title":["Preemptive Job-Shop Scheduling Using Stopwatch Automata"],"prefix":"10.1007","author":[{"given":"Yasmina","family":"Abdedda\u00efm","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Oded","family":"Maler","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2002,3,14]]},"reference":[{"key":"9_CR1","series-title":"Lect Notes Comput Sci","doi-asserted-by":"crossref","first-page":"478","DOI":"10.1007\/3-540-44585-4_46","volume-title":"Proc. CAV\u201901, 2001","author":"Y. Abdedda\u00efm","year":"2001","unstructured":"Y. Abdedda\u00efm and O. Maler, Job-Shop Scheduling using Timed Automata in G. Berry, H. Comon and A. Finkel (Eds.), Proc. CAV\u201901, 478\u2013492, LNCS 2102, Springer 2001."},{"key":"9_CR2","doi-asserted-by":"crossref","unstructured":"K. Altisen, G. Goessler, A. Pnueli, J. Sifakis, S. Tripakis and S. Yovine, A Framework for Scheduler Synthesis, Proc. RTSS\u201999, 154\u2013163, IEEE, 1999.","DOI":"10.1109\/REAL.1999.818838"},{"key":"9_CR3","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1016\/0304-3975(94)90010-8","volume":"126","author":"R. Alur","year":"1994","unstructured":"R. Alur and D.L. Dill, ATheory ofTimedAutomata, Theoretical Computer Science 126, 183\u2013235, 1994.","journal-title":"Theoretical Computer Science"},{"key":"9_CR4","series-title":"Lect Notes Comput Sci","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1007\/3-540-48983-5_6","volume-title":"As Soon as Possible: Time Optimal Control for Timed Automata","author":"E. Asarin","year":"1999","unstructured":"E. Asarin and O. Maler, As Soon as Possible: Time Optimal Control for Timed Automata, Proc. HSCC\u201999, 19\u201330, LNCS 1569, Springer, 1999."},{"key":"9_CR5","series-title":"Lect Notes Comput Sci","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1007\/3-540-45319-9_13","volume-title":"Efficient Guiding Towards Cost-Optimality in UPPAAL","author":"G. Behrmann","year":"2001","unstructured":"G. Behrmann, A. Fehnker T.S. Hune, K.G. Larsen, P. Pettersson and J. Romijn, Efficient Guiding Towards Cost-Optimality in UPPAAL, Proc. TACAS 2001, 174\u2013188, LNCS 2031, Springer, 2001."},{"key":"9_CR6","doi-asserted-by":"crossref","unstructured":"J. Carlier and E. Pinson, A Practical Use of Jackson\u2019s Preemptive Schedule for Solving the Job-Shop Problem, Annals of Operations Research 26, 1990.","DOI":"10.1007\/BF03543071"},{"key":"9_CR7","series-title":"Lect Notes Comput Sci","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1007\/3-540-44618-4_12","volume-title":"Proc. CONCUR\u20192000","author":"F. Cassez","year":"2000","unstructured":"F. Cassez and K.G. Larsen, On the Impressive Power of Stopwatches, in C. Palamidessi (Ed.) Proc. CONCUR\u20192000, 138\u2013152, LNCS 1877, Springer, 2000."},{"key":"9_CR8","volume-title":"Algorithmic Problems in Analysis of Real Time System Specifications","author":"K. Cerans","year":"1992","unstructured":"K. Cerans, Algorithmic Problems in Analysis of Real Time System Specifications, Ph.D. thesis, University of Latvia, Riga, 1992."},{"key":"9_CR9","doi-asserted-by":"crossref","unstructured":"E. Fersman, P. Pettersson and W. Yi, Timed Automata with Asynchronous Processes: Schedulability and Decidability, TACAS 2002, this volume, 2002.","DOI":"10.1007\/3-540-46002-0_6"},{"key":"9_CR10","unstructured":"M. R. Garey and D. S Johnson, Computers and Intractability,A Guide to the Theory of NP-Completeness,W. H. Freeman and Company, 1979."},{"key":"9_CR11","unstructured":"J. R. Jackson, Scheduling a Production Line to Minimize Maximum Tardiness, Research Report 43, Management Sciences Research Project, UCLA, 1955."},{"key":"9_CR12","doi-asserted-by":"publisher","first-page":"390","DOI":"10.1016\/S0377-2217(98)00113-1","volume":"113","author":"A.S. Jain","year":"1999","unstructured":"A.S. Jain and S. Meeran, Deterministic Job-Shop Scheduling: Past, Present and Future, European Journal of Operational Research 113, 390\u2013434, 1999.","journal-title":"European Journal of Operational Research"},{"key":"9_CR13","doi-asserted-by":"publisher","first-page":"209","DOI":"10.1006\/inco.1998.2774","volume":"150","author":"Y. Kesten","year":"1999","unstructured":"Y. Kesten, A. Pnueli, J. Sifakis and S. Yovine, Decidable Integration Graphs, Information and Computation 150, 209\u2013243, 1999.","journal-title":"Information and Computation"},{"key":"9_CR14","series-title":"Lect Notes Comput Sci","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1007\/3-540-58179-0_47","volume-title":"Proc. CAV\u201994 , 1994","author":"J. McManis","year":"1994","unstructured":"J. McManis and P. Varaiya, Suspension Automata: A Decidable Class of Hybrid Automata, in D.L Dill (Ed.), Proc. CAV\u201994, 105\u2013117, LNCS 818, Springer, 1994."},{"key":"9_CR15","unstructured":"P. Niebert, S. Tripakis S. Yovine, Minimum-Time Reachability for Timed Automata, IEEE Mediteranean Control Conference, 2000."},{"key":"9_CR16","doi-asserted-by":"publisher","first-page":"440","DOI":"10.3166\/ejc.7.440-454","volume":"7","author":"P. Niebert","year":"2001","unstructured":"P. Niebert and S. Yovine, Computing Efficient Operation Schemes for Chemical Plants in Multi-batch Mode, European Journal of Control 7, 440\u2013453, 2001.","journal-title":"European Journal of Control"},{"key":"9_CR17","unstructured":"C. Le Pape and P. Baptiste, A Constraint-Based Branch-and-Bound Algorithm for Preemptive Job-Shop Scheduling, Proc. of Int.Workshop on Production Planning and Control, Mons, Belgium, 1996."},{"key":"9_CR18","unstructured":"C. Le Pape and P. Baptiste, An Experimental Comparaison of Constraint-Based Algorithms for the Preemptive Job-shop Sheduling Problem, CP97 Workshop on Industrial Constraint-Directed Scheduling, 1997."}],"container-title":["Lecture Notes in Computer Science","Tools and Algorithms for the Construction and Analysis of Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-46002-0_9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,4,27]],"date-time":"2020-04-27T13:34:19Z","timestamp":1587994459000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-46002-0_9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002]]},"ISBN":["9783540434191","9783540460022"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/3-540-46002-0_9","relation":{"is-part-of":[{"id-type":"doi","id":"https:\/\/doi.org\/10.1007\/3-540-46002-0","asserted-by":"object"}]},"ISSN":["0302-9743"],"issn-type":[{"value":"0302-9743","type":"print"}],"subject":[],"published":{"date-parts":[[2002]]}}}