{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,2]],"date-time":"2025-11-02T19:51:22Z","timestamp":1762113082486},"publisher-location":"Berlin, Heidelberg","reference-count":23,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540652243"},{"type":"electronic","value":"9783540494812"}],"license":[{"start":{"date-parts":[[1998,1,1]],"date-time":"1998-01-01T00:00:00Z","timestamp":883612800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1998]]},"DOI":"10.1007\/3-540-49481-2_28","type":"book-chapter","created":{"date-parts":[[2007,11,24]],"date-time":"2007-11-24T19:46:10Z","timestamp":1195933570000},"page":"385-399","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":25,"title":["A Generic Model and Hybrid Algorithm for Hoist Scheduling Problems"],"prefix":"10.1007","author":[{"given":"Robert","family":"Rodo\u0161ek","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mark","family":"Wallace","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[1999,6,11]]},"reference":[{"key":"28_CR1","unstructured":"Barth, P., Bockmayr, A.: Modelling Mixed-Integer Optimisation Problems in Constraint Logic Programming. MPI Report Nr. I-95-2-011 (1995)"},{"key":"28_CR2","unstructured":"Baptiste, P., Legeard, B., Manier, M.A., Varnier, C.: A Scheduling Problem Optimisation Solved with Constraint Logic Programming. Proc. of the PACT Conf. (1994) 47\u201366"},{"key":"28_CR3","unstructured":"Beringer, H., De Backer, B.: Combinatorial Problem Solving in Constraint Logic Programming with Cooperating Solvers. Chapter 8 in Logic Programming: Formal Methods and Practical Applications ed. C. Beierle and L. Pluemer Elsevier (1995)"},{"key":"28_CR4","unstructured":"Cheng, C.C., Smith, S.F.: A Constraint Satisfaction Approach to Makespan Scheduling. Proc. of the AIPS Conf. (1996) 45\u201352"},{"key":"28_CR5","unstructured":"Dincbas, M., Van Hentenryck, P., Simonis, H., Aggoun, A., Graf, T., Berthier, F.: The Constraint Logic Programming Language CHIP. Proc. of the FGCS Conf. (1988) 693\u2013702"},{"key":"28_CR6","unstructured":"CPLEX. Using the CPLEX Callable Library. CPLEX Optimization, Inc. (1997)"},{"key":"28_CR7","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1016\/0743-1066(90)90052-7","volume":"8","author":"M. Dincbas","year":"1995","unstructured":"Dincbas, M., Simonis, H., Van Hentenryck, P.: Solving Large Combinatorial Problems in Logic Programming. Journal of Logic programming 8 (1995) 75\u201393","journal-title":"Journal of Logic programming"},{"issue":"3","key":"28_CR8","doi-asserted-by":"publisher","first-page":"245","DOI":"10.1007\/BF00137871","volume":"1","author":"K. Darby-Dowman","year":"1997","unstructured":"Darby-Dowman, K., Little, J., Mitra, G., Zaffalon, M.: Constraint Logic Programming and Integer programming Approaches and their Collaboration in Solving an Assignment Scheduling Problem. Constraints 1(3) (1997) 245\u2013264","journal-title":"Constraints"},{"key":"28_CR9","unstructured":"ECLiPSe User Manual Version 3.7.1. IC-PARC, Imperial College, London (1998)"},{"key":"28_CR10","doi-asserted-by":"publisher","first-page":"82","DOI":"10.1016\/0377-2217(94)90332-8","volume":"72","author":"C. Hanen","year":"1994","unstructured":"Hanen. C.: Study of a NP-Hard Cyclic Scheduling Problem: The Recurrent Job-Shop. European Journal of Operations Research 72 (1994) 82\u2013101","journal-title":"European Journal of Operations Research"},{"key":"28_CR11","unstructured":"Hooker, J.N., Osorio, M.A.: Mixed Logical\/Linear Programming. Proc. of the INFORMS CSTS Conf. Atlanta (1996)"},{"key":"28_CR12","unstructured":"Hajian, M., Sakkout, H.El, Wallace, M., Richards, E.: Towards a Closer Integration of Finite Domain Propagation and Simplex-Based Algorithms. Proc. of the AI Maths Conf. Florida (1995) http:\/\/www.icparc.ic.ac.uk\/papers.html"},{"key":"28_CR13","doi-asserted-by":"crossref","unstructured":"Jaffar, J., Lassez, J.L.: Constraint Logic Programming. Proc. of the ACM POPL Symposium Munich (1997)","DOI":"10.1093\/oso\/9780198537922.003.0012"},{"key":"28_CR14","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0167-6377(93)90101-L","volume":"14","author":"L. Lei","year":"1993","unstructured":"Lei, L., Armstrong, R., Gu, S.: Minimizing the Fleet Size with Dependent Time-Window and Single-Track Constraints. Operations Res. Letters 14 (1993) 91\u201398","journal-title":"Operations Res. Letters"},{"issue":"12","key":"28_CR15","doi-asserted-by":"publisher","first-page":"1629","DOI":"10.1287\/mnsc.37.12.1629","volume":"37","author":"L. Lei","year":"1991","unstructured":"Lei, L., Wang, T.J.: The Minimum Common-Cycle Algorithm for Cycle Scheduling of Two Material Handling Hoists with Time Window Constraints. Management Science 37(12) (1991) 1629\u20131639","journal-title":"Management Science"},{"issue":"2","key":"28_CR16","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1080\/07408179408966593","volume":"26","author":"L. Lei","year":"1994","unstructured":"Lei, L., Wang, T.J.: Determining Optimal Cyclic Hoist Schedules in a Single Hoist Electroplating Line. IEE Transactions 26(2) (1994) 25\u201333","journal-title":"IEE Transactions"},{"key":"28_CR17","unstructured":"McAloon, K., Tretkoff, C.: Optimization and Computational Logic. Wiley-Interscience (1996)"},{"issue":"2","key":"28_CR18","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1080\/05695557608975070","volume":"8","author":"L.W. Phillips","year":"1976","unstructured":"Phillips, L.W., Unger, P.S.: Mathematical Programming Solution of a Hoist Scheduling Problem. AIIE Transactions 8(2) (1976) 219\u2013255","journal-title":"AIIE Transactions"},{"key":"28_CR19","unstructured":"Rodo\u0161ek, R., Wallace, M.G., Hajian, M.T.: A New Approach to Integrating Mixed Integer Programming with Constraint Logic Programming. Annals of Operational Research. Recent Advance in Combinatorial Optimization: Theory and Applications (to appear) http:\/\/www.icparc.ic.ac.uk\/papers.html"},{"issue":"2","key":"28_CR20","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1007\/BF00143880","volume":"1","author":"B.M. Smith","year":"1996","unstructured":"Smith, B.M., Brailsford, S.C., Hubbard, P.M., Williams, H.P.: The Progressive Party Problem: Integer Linear Programming and Constraint Programming Compared. Constraints 1(2) (1996) 119\u2013138","journal-title":"Constraints"},{"key":"28_CR21","unstructured":"Schimpf. J.: ECLiPSe Approach to Solver Integration and Cooperation. Proc. of the INFORMS CSTS Conf. Monterey (1998)"},{"issue":"2","key":"28_CR22","doi-asserted-by":"publisher","first-page":"157","DOI":"10.1080\/07408178808966165","volume":"20","author":"G.W. Sharpio","year":"1988","unstructured":"Sharpio, G.W., Nuttle, H.: Hoist Scheduling for a PBC Electroplating Facility. IIE Transactions 20(2) (1988) 157\u2013167","journal-title":"IIE Transactions"},{"key":"28_CR23","volume-title":"XPRESS-MP Reference Manual","author":"Dash Associates","year":"1993","unstructured":"Dash Associates. XPRESS-MP Reference Manual. Dash Associates UK (1993)"}],"container-title":["Lecture Notes in Computer Science","Principles and Practice of Constraint Programming \u2014 CP98"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-49481-2_28","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,5,14]],"date-time":"2023-05-14T22:35:47Z","timestamp":1684103747000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-49481-2_28"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998]]},"ISBN":["9783540652243","9783540494812"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/3-540-49481-2_28","relation":{},"ISSN":["0302-9743"],"issn-type":[{"type":"print","value":"0302-9743"}],"subject":[],"published":{"date-parts":[[1998]]},"assertion":[{"value":"11 June 1999","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}