{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T23:15:41Z","timestamp":1725664541664},"publisher-location":"Berlin, Heidelberg","reference-count":6,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540594086"},{"type":"electronic","value":"9783540492450"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1995]]},"DOI":"10.1007\/3-540-59408-6_58","type":"book-chapter","created":{"date-parts":[[2012,2,26]],"date-time":"2012-02-26T17:15:36Z","timestamp":1330276536000},"page":"277-291","source":"Crossref","is-referenced-by-count":2,"title":["Scheduling jobs of equal length: Complexity, facets and computational results"],"prefix":"10.1007","author":[{"given":"Yves","family":"Crama","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Frits C. R.","family":"Spieksma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2005,6,1]]},"reference":[{"key":"22_CR1","unstructured":"Akker, J.M. van den, C.P.M. van Hoesel and M.W.P. Savelsbergh (1993), Facet inducing inequalities for single-machine scheduling problems, Memorandum COSOR 93-27, Eindhoven University of Technology."},{"key":"22_CR2","first-page":"147","volume":"5","author":"G. Birkhoff","year":"1946","unstructured":"Birkhoff, G. (1946), Tres observaciones sobre el algebra lineal, Revista Universidad Nacional de Tucum\u00e1n, Series A 5, 147\u2013151.","journal-title":"Revista Universidad Nacional de Tucum\u00e1n, Series A"},{"key":"22_CR3","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1007\/BF03543080","volume":"26","author":"Y. Crama","year":"1990","unstructured":"Crama, Y., A.W.J. Kolen, A.G. Oerlemans and F.C.R. Spieksma (1990), Throughput rate optimization in the automated assembly of printed circuit boards, Annals of Operations Research 26, 455\u2013480.","journal-title":"Annals of Operations Research"},{"key":"22_CR4","unstructured":"Crama, Y. and F.C.R. Spieksma (1993), Scheduling jobs of equal length: complexity, facets and computational results, Research Report M93-07, University of Limburg."},{"key":"22_CR5","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1007\/BF01328741","volume":"5","author":"P.J.M. Laarhoven van","year":"1993","unstructured":"Laarhoven, P.J.M. van, and W.H.M. Zijm (1993), Production preparation and numerical control in PCB assembly, the International Journal of Flexible Manufacturing Systems 5, 187\u2013207.","journal-title":"the International Journal of Flexible Manufacturing Systems"},{"key":"22_CR6","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1007\/BF01586059","volume":"54","author":"J.P. Sousa","year":"1992","unstructured":"Sousa, J.P. and L.A. Wolsey (1992), A time-indexed formulation of non-preemptive single-machine scheduling problems, Mathematical Programming 54, 353\u2013367.","journal-title":"Mathematical Programming"}],"container-title":["Lecture Notes in Computer Science","Integer Programming and Combinatorial Optimization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-59408-6_58.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,28]],"date-time":"2021-04-28T01:27:18Z","timestamp":1619573238000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-59408-6_58"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1995]]},"ISBN":["9783540594086","9783540492450"],"references-count":6,"URL":"https:\/\/doi.org\/10.1007\/3-540-59408-6_58","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[1995]]}}}