{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T23:10:34Z","timestamp":1725664234518},"publisher-location":"Berlin, Heidelberg","reference-count":15,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540612735"},{"type":"electronic","value":"9783540683919"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1996]]},"DOI":"10.1007\/3-540-61273-4_20","type":"book-chapter","created":{"date-parts":[[2012,2,26]],"date-time":"2012-02-26T21:21:59Z","timestamp":1330291319000},"page":"306-320","source":"Crossref","is-referenced-by-count":1,"title":["Formalising the repair of schedules through knowledge acquisition"],"prefix":"10.1007","author":[{"given":"Janet","family":"Efstathiou","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2005,6,1]]},"reference":[{"key":"20_CR1","unstructured":"Beck, H.A.: Design considerations for reactive scheduling. Technical Report, Artificial Intelligence Applications Institute, University of Edinburgh, (1982)"},{"key":"20_CR2","unstructured":"Bona, B., Brandimente P. and Greco C.: Some experiences in the application of AI in manufacturing and control. 29\u201345, in Applications of Artificial Intelligence in Engineering V, Volume 2, Manufacturing and Planning, G. Rzevski (Ed.), Computational Mechanics Publications, 1982, Springer-Verlag."},{"key":"20_CR3","first-page":"107","volume-title":"Artificial Intelligence in Manufacturing","author":"I. Buchanan","year":"1988","unstructured":"Buchanan, I., Burke, P., Costello, J. and Prosser, P.: in Artificial Intelligence in Manufacturing, (ed.) G. Rzevski, Computational Mechanics Publications, Southampton, (1988) 107\u2013114."},{"key":"20_CR4","unstructured":"Burke, P., Prosser, P.: Distributed Asynchronous Scheduling. 503\u2013522, in Applications of Artificial Intelligence in Engineering V, Volume 2, Manufacturing and Planning, G. Rzevski (Ed.), Computational Mechanics Publications (1990), Springer-Verlag."},{"key":"20_CR5","volume-title":"Working Paper in Manufacturing","author":"G.D.M. Frizelle","year":"1995","unstructured":"Frizelle, G.D.M.: An Entropic Measurement of Complexity in Jackson Networks, Working Paper in Manufacturing, 1995 No 13, Cambridge University Engineering Department, Mill Lane Cambridge CB2 1RX."},{"key":"20_CR6","doi-asserted-by":"crossref","unstructured":"Interrante, L.D., Rochowiak, D.M.: Active Rescheduling and Collaboration in Dynamic Manufacturing Systems. Concurrent Engineering: Research and Applications, 2 97\u2013105","DOI":"10.1177\/1063293X9400200203"},{"key":"20_CR7","volume-title":"Production and Operations Management","author":"R. Wild","year":"1989","unstructured":"Wild, R.: Production and Operations Management. Fourth Edition, Cassell, london, 1989.","edition":"Fourth Edition"},{"key":"20_CR8","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/0951-5240(95)00005-E","volume":"8","author":"R. Lane","year":"1995","unstructured":"Lane, R., Evans, S.: Solving problems in production scheduling. Computer Integrated Manufacturing Systems, 8 (1995) 117\u2013124","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"20_CR9","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/0951-5240(94)90053-1","volume":"7","author":"D. Little","year":"1995","unstructured":"Little, D., A. Hemmings: Automated assembly scheduling: a review. Computer Integrated Manufacturing Systems 7 (1995) 51\u201361.","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"20_CR10","unstructured":"McKay, K.N., Safayeni, F.R., Buzacott, J.A.: Schedulers & Planners: What and how can we learn from them. Invited paper, Proceedings of Intelligent Scheduling Symposium, November, San Francisco (1992) 51\u201366."},{"key":"20_CR11","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1049\/ise.1992.0007","volume":"1","author":"P. Prosser","year":"1992","unstructured":"Prosser, P., Conway, C., Muller, C.: A constraint maintenance system for the distributed resource allocation problem. Intelligent Systems Engineering 1 (1992) 76\u201383.","journal-title":"Intelligent Systems Engineering"},{"issue":"No.2","key":"20_CR12","doi-asserted-by":"crossref","first-page":"26","DOI":"10.1109\/64.129280","volume":"7","author":"N. Sathi","year":"1992","unstructured":"Sathi, N., Fox, M.S., Goyal., R., Kott, S.: Resource configuration and allocation. IEEE Expert 7 No. 2 (1992) 26\u201335.","journal-title":"IEEE Expert"},{"key":"20_CR13","first-page":"539","volume":"41","author":"S.F. Smith","year":"1990","unstructured":"Smith, S.F., Ow, P.S., Potvin, J-Y., Muscettola, N., Matthys, D.C.: An integrated framework for generating and revising factory schedules. International Journal of Operations Research 41 (1990) 539\u2013552","journal-title":"International Journal of Operations Research"},{"key":"20_CR14","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1109\/64.73815","volume":"6","author":"K.P. Sycara","year":"1991","unstructured":"Sycara, K.P., Roth, S.F., Sadeh, N., Fox, M.S.: Resource allocation in distributed factory scheduling. IEEE Expert, 6 (1991) 29\u201340.","journal-title":"IEEE Expert"},{"key":"20_CR15","doi-asserted-by":"crossref","unstructured":"Zweben, M.: Repair for scheduling and rescheduling. IEEE Systems Man and Cybernetics (1992)","DOI":"10.1109\/21.257756"}],"container-title":["Lecture Notes in Computer Science","Advances in Knowledge Acquisition"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-61273-4_20.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,31]],"date-time":"2021-12-31T10:23:27Z","timestamp":1640946207000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-61273-4_20"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1996]]},"ISBN":["9783540612735","9783540683919"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/3-540-61273-4_20","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[1996]]}}}