{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,11]],"date-time":"2026-11-11T16:04:09Z","timestamp":1794413049149,"version":"4.9.1"},"publisher-location":"Berlin, Heidelberg","reference-count":22,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540614401","type":"print"},{"value":"9783540685807","type":"electronic"}],"license":[{"start":{"date-parts":[[1996,1,1]],"date-time":"1996-01-01T00:00:00Z","timestamp":820454400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1996]]},"DOI":"10.1007\/3-540-61440-0_166","type":"book-chapter","created":{"date-parts":[[2012,2,26]],"date-time":"2012-02-26T16:39:03Z","timestamp":1330274343000},"page":"646-657","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":63,"title":["Improved scheduling algorithms for minsum criteria"],"prefix":"10.1007","author":[{"given":"Soumen","family":"Chakrabarti","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Cynthia A.","family":"Phillips","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Andreas S.","family":"Schulz","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"David B.","family":"Shmoys","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Cliff","family":"Stein","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Joel","family":"Wein","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2005,6,2]]},"reference":[{"key":"54_CR1","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1287\/ijoc.3.2.149","volume":"3","author":"D. Applegate","year":"1991","unstructured":"D. Applegate and W. Cook. A computational study of the job-shop scheduling problem. ORSA Journal of Computing, 3:149\u2013156, 1991.","journal-title":"ORSA Journal of Computing"},{"key":"54_CR2","first-page":"177","volume":"15","author":"I. B\u00e1r\u00e1ny","year":"1982","unstructured":"I. B\u00e1r\u00e1ny and T. Fiala. T\u00f6bbg\u00e9pes \u00fctemez\u00e9si probl\u00e9m\u00e1k k\u00f6zel optim\u00e1lis megold\u00e1sa. Szigma-Mat.-Kozgazdas\u00e1gi Foly\u00f3irat, 15:177\u2013191, 1982.","journal-title":"Szigma-Mat.-Kozgazdas\u00e1gi Foly\u00f3irat"},{"key":"54_CR3","first-page":"163","volume":"26","author":"A. Blum","year":"1994","unstructured":"A. Blum, P. Chalasani, D. Coppersmith, B. Pulleyblank, P. Raghavan, and M. Sudan. The minimum latency problem. In STOC 26, pages 163\u2013172, 1994.","journal-title":"STOC"},{"key":"54_CR4","doi-asserted-by":"publisher","first-page":"382","DOI":"10.1145\/361011.361064","volume":"17","author":"J.L. Bruno","year":"1974","unstructured":"J.L. Bruno, E.G. Coffman, and R. Sethi. Scheduling independent tasks to reduce mean finishing time. Communications of the ACM, 17:382\u2013387, 1974.","journal-title":"Communications of the ACM"},{"key":"54_CR5","doi-asserted-by":"crossref","unstructured":"S. Chakrabarti and S. Muthukrishnan. Resource scheduling for parallel database and scientific applications. To appear in SPAA 96, June 1996.","DOI":"10.1145\/237502.237577"},{"key":"54_CR6","first-page":"642","volume":"25","author":"A. Feldmann","year":"1993","unstructured":"A. Feldmann, M. Kao, J. Sgall, and S. Teng. Optimal online scheduline of parallel jobs with dependencies. In STOC 25, pages 642\u2013653, 1993.","journal-title":"STOC"},{"key":"54_CR7","doi-asserted-by":"publisher","first-page":"187","DOI":"10.1137\/0204015","volume":"4","author":"M.R. Garey","year":"1975","unstructured":"M.R. Garey and R.L. Graham. Bounds for multiprocessor scheduling with resource constraints. SIAM Journal on Computing, 4:187\u2013200, 1975.","journal-title":"SIAM Journal on Computing"},{"key":"54_CR8","first-page":"152","volume":"7","author":"M. Goemans","year":"1996","unstructured":"M. Goemans and J. Kleinberg. An improved approximation ratio for the minimum latency problem. In SODA 7, pages 152\u2013157, 1996.","journal-title":"SODA"},{"key":"54_CR9","doi-asserted-by":"publisher","first-page":"665","DOI":"10.1145\/321978.321985","volume":"23","author":"T. Gonzalez","year":"1976","unstructured":"T. Gonzalez and S. Sahni. Open shop scheduling to minimize finish time. Journal of the ACM, 23:665\u2013679, 1976.","journal-title":"Journal of the ACM"},{"key":"54_CR10","unstructured":"L.A. Hall, A.S. Schulz, D.B. Shmoys, and J. Wein. Scheduling to minimize average completion time: Off-line and on-line algorithms. Joint journal version of [11] and [18]; in preparation."},{"key":"54_CR11","first-page":"142","volume":"7","author":"L.A. Hall","year":"1996","unstructured":"L.A. Hall, D.B. Shmoys, and J. Wein. Scheduling to minimize average completion time: Off-line and on-line algorithms. In SODA 7, pages 142\u2013151, 1996.","journal-title":"SODA"},{"key":"54_CR12","doi-asserted-by":"crossref","first-page":"846","DOI":"10.1287\/opre.21.3.846","volume":"21","author":"W. Horn","year":"1973","unstructured":"W. Horn. Minimizing average flow time with parallel machines. Operations Research, 21:846\u2013847, 1973.","journal-title":"Operations Research"},{"key":"54_CR13","unstructured":"C.A.J. Hurkens and M.J. Coster. On the makespan of a schedule minimizing total completion time for unrelated parallel machines. Unpublished manuscript."},{"key":"54_CR14","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/moor.8.1.1","volume":"8","author":"D.S. Johnson","year":"1983","unstructured":"D.S. Johnson and K.A. Niemi. On knapsacks, partitions, and a new dynamic programming technique for trees. Mathematics of Operations Research, 8:1\u201314, 1983.","journal-title":"Mathematics of Operations Research"},{"key":"54_CR15","first-page":"167","volume":"5","author":"W. Ludwig","year":"1994","unstructured":"W. Ludwig and P. Tiwari. Scheduling malleable and nonmalleable parallel tasks. in SODA 5, pages 167\u2013176, 1994.","journal-title":"SODA"},{"key":"54_CR16","first-page":"86","volume":"4","author":"C. Phillips","year":"1995","unstructured":"C. Phillips, C. Stein, and J. Wein. Scheduling jobs that arrive over time. In WADS 4, pages 86\u201397, 1995.","journal-title":"WADS"},{"key":"54_CR17","unstructured":"M. Queyranne and A.S. Schulz. Polyhedral approaches to machine scheduling. Preprint 408\/1994, Dept. of Mathematics, Technical University of Berlin, 1994."},{"key":"54_CR18","doi-asserted-by":"crossref","unstructured":"A.S. Schulz. Scheduling to minimize total weighted completion time: Performance guarantees of LP-based heuristics and lower bounds. Preprint 474\/1995, Dept. of Mathematics, Technical University of Berlin. To appear in IPCO V, June 1996.","DOI":"10.1007\/3-540-61310-2_23"},{"key":"54_CR19","doi-asserted-by":"publisher","first-page":"617","DOI":"10.1137\/S009753979222676X","volume":"23","author":"D.B. Shmoys","year":"1994","unstructured":"D.B. Shmoys, C. Stein, and J. Wein. Improved approximation algorithms for shop scheduling problems. SIAM Journal on Computing, 23:617\u2013632, 1994.","journal-title":"SIAM Journal on Computing"},{"key":"54_CR20","first-page":"448","volume":"4","author":"D.B. Shmoys","year":"1993","unstructured":"D.B. Shmoys and \u00c9. Tardos. Scheduling parallel machines with costs. In SODA 4, pages 448\u2013455, 1993.","journal-title":"SODA"},{"key":"54_CR21","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W.E. Smith","year":"1956","unstructured":"W.E. Smith. Various optimizers for single-stage production. Naval Research Logistics Quarterly, 3:59\u201366, 1956.","journal-title":"Naval Research Logistics Quarterly"},{"key":"54_CR22","first-page":"112","volume":"5","author":"J. Turek","year":"1994","unstructured":"J. Turek, U. Schwiegelshohn, J. Wolf, and P. Yu. Scheduling parallel tasks to minimize average response time. In SODA 5, pages 112\u2013121, 1994.","journal-title":"SODA"}],"container-title":["Lecture Notes in Computer Science","Automata, Languages and Programming"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-61440-0_166","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,1,8]],"date-time":"2020-01-08T21:15:08Z","timestamp":1578518108000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-61440-0_166"}},"subtitle":["Extended abstract"],"short-title":[],"issued":{"date-parts":[[1996]]},"ISBN":["9783540614401","9783540685807"],"references-count":22,"URL":"https:\/\/doi.org\/10.1007\/3-540-61440-0_166","relation":{"is-part-of":[{"id-type":"doi","id":"https:\/\/doi.org\/10.1007\/3-540-61440-0","asserted-by":"object"}]},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[1996]]},"assertion":[{"value":"2 June 2005","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}