{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T10:42:44Z","timestamp":1743072164759,"version":"3.40.3"},"publisher-location":"Boston, MA","reference-count":18,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780387747583"},{"type":"electronic","value":"9780387747590"}],"license":[{"start":{"date-parts":[[2008,1,1]],"date-time":"2008-01-01T00:00:00Z","timestamp":1199145600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2008,1,1]],"date-time":"2008-01-01T00:00:00Z","timestamp":1199145600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008]]},"DOI":"10.1007\/978-0-387-74759-0_555","type":"book-chapter","created":{"date-parts":[[2008,8,25]],"date-time":"2008-08-25T11:09:38Z","timestamp":1219662578000},"page":"3236-3245","source":"Crossref","is-referenced-by-count":1,"title":["Railroad Locomotive Scheduling"],"prefix":"10.1007","author":[{"given":"Arvind","family":"Kumar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Balachandran","family":"Vaidyanathan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ravindra K.","family":"Ahuja","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"555_CR1_555","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1287\/trsc.1050.0115","volume":"39","author":"RK Ahuja","year":"2005","unstructured":"Ahuja RK, Liu J, Orlin JB, Sharma D,\n\t    Shughart LA (2005) Solving real-life locomotive scheduling problems. Trans Sci 39:503\u2013517","journal-title":"Trans Sci"},{"key":"555_CR2_555","volume-title":"Network Flows: Theory, Algorithms, and Applications","author":"RK Ahuja","year":"1993","unstructured":"Ahuja RK, Magnanti TL, Orlin JB (1993) Network Flows: Theory,\n\t    Algorithms, and Applications. Prentice Hall, Englewood Cliffs"},{"key":"555_CR3_555","doi-asserted-by":"publisher","first-page":"943","DOI":"10.2307\/2581584","volume":"31","author":"JMP Booler","year":"1980","unstructured":"Booler JMP (1980) The\n\t    solution of a\u00a0railway locomotive scheduling problem. J\u00a0Oper Res Soc 31:943\u2013948","journal-title":"J Oper Res Soc"},{"key":"555_CR4_555","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1038\/sj\/jors\/0460113","volume":"46","author":"JMP Booler","year":"1995","unstructured":"Booler JMP (1995)\n\t    A\u00a0note on the use of Lagrangean Relaxation in railway scheduling. J\u00a0Oper Res Soc 46:123\u2013127","journal-title":"J Oper Res Soc"},{"key":"555_CR5_555","first-page":"39","volume-title":"Computer Applications in Railway Planning and Management","author":"KC Chih","year":"1990","unstructured":"Chih KC, Hornung MA, Rothenberg MS, Kornhauser AL (1990) Implementation of a\u00a0real time locomotive distribution system. In:\n\t  Murthy TKS, Rivier RE, List GF, Mikolaj J (eds) Computer Applications in Railway Planning and Management. Computational Mechanics Publications,\n\t  Southampton, pp\u00a039\u201349"},{"issue":"2","key":"555_CR6_555","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1287\/trsc.34.2.133.12308","volume":"34","author":"JF Cordeau","year":"2000","unstructured":"Cordeau JF, Soumis F, Desrosiers J (2000) A\u00a0Benders decomposition approach for the locomotive and car assignment\n\t    problem. Trans Sci 34(2):133\u2013149","journal-title":"Trans Sci"},{"key":"555_CR7_555","doi-asserted-by":"crossref","first-page":"380","DOI":"10.1287\/trsc.32.4.380","volume":"32","author":"JF Cordeau","year":"1998","unstructured":"Cordeau JF, Toth P,\n\t    Vigo D (1998) A\u00a0survey of optimization models for train routing and scheduling. Trans Sci\n\t    32:380\u2013404","journal-title":"Trans Sci"},{"key":"555_CR8_555","unstructured":"Fischetti M, Toth P (1997) A\u00a0package for locomotive scheduling. Technical\n\tReport DEIS-OR-97\u201316, University of Bologna"},{"key":"555_CR9_555","first-page":"121","volume":"14","author":"M Florian","year":"1976","unstructured":"Florian M, Bushell G, Ferland J, Guerin G,\n\t    Nastansky L (1976) The engine scheduling problem in a\u00a0railway network. INFOR 14:121\u2013138","journal-title":"INFOR"},{"key":"555_CR10_555","doi-asserted-by":"publisher","first-page":"825","DOI":"10.1038\/sj\/jors\/0421001","volume":"42","author":"MA Forbes","year":"1991","unstructured":"Forbes MA, Holt JN,\n\t    Watts AM (1991) Exact solution of locomotive scheduling problems. J\u00a0Oper Res Soc 42:825\u2013831","journal-title":"J Oper Res Soc"},{"key":"555_CR11_555","doi-asserted-by":"crossref","DOI":"10.1002\/9781118627372","volume-title":"Integer and Combinatorial Optimization","author":"GL Nemhauser","year":"1988","unstructured":"Nemhauser GL, Wolsey LA (1988) Integer and Combinatorial Optimization. Wiley, New\n\t    York"},{"key":"555_CR12_555","unstructured":"Nou A, Desrosiers J, Soumis F (1997) Weekly locomotive scheduling at Swedish\n\tState Railways. Technical Report TRITA\/MAT-97-OS12, Royal Institute of Technology, Stockholm"},{"key":"555_CR13_555","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1287\/inte.11.3.44","volume":"11","author":"KV Ramani","year":"1981","unstructured":"Ramani KV (1981) An information system for allocating coach stock on Indian Railways. Interfaces\n\t    11:44\u201351","journal-title":"Interfaces"},{"key":"555_CR14_555","first-page":"45","volume":"1251","author":"S Smith","year":"1988","unstructured":"Smith S, Sheffi Y\n\t    (1988) Locomotive scheduling under uncertain demand. Trans Res Records 1251:45\u201353","journal-title":"Trans Res Records"},{"key":"555_CR15_555","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1016\/j.trb.2007.06.003","volume":"42","author":"B Vaidyanathan","year":"2008","unstructured":"Vaidyanathan B, Ahuja RK, Liu J, Shughart LA (2008) Real-life locomotive planning: new formulations and computational\n\t    results. Transp Res Part B 42:147\u2013168","journal-title":"Transp Res Part B"},{"key":"555_CR16_555","doi-asserted-by":"publisher","first-page":"187","DOI":"10.1057\/palgrave.jors.0400207","volume":"40","author":"MB Wright","year":"1989","unstructured":"Wright MB (1989)\n\t    Applying stochastic algorithms to a\u00a0locomotive scheduling problem. J\u00a0Oper Res Soc 40:187\u2013192","journal-title":"J Oper Res Soc"},{"key":"555_CR17_555","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/S0377-2217(96)00198-1","volume":"97","author":"K Ziarati","year":"1997","unstructured":"Ziarati K,\n\t    Soumis F, Desrosiers J, Gelinas S, Saintonge\u00a0A (1997) Locomotive assignment with heterogeneous consists at CN North America. Eur J Oper Res\n\t    97:281\u2013292","journal-title":"Eur J Oper Res"},{"key":"555_CR18_555","doi-asserted-by":"crossref","first-page":"1156","DOI":"10.1287\/mnsc.45.8.1156","volume":"45","author":"K Ziarati","year":"1999","unstructured":"Ziarati K, Soumis F,\n\t    Desrosiers J, Solomon MM (1999) A\u00a0branch-first, cut-second approach for locomotive assignment. Manage Sci\n\t    45:1156\u20131168","journal-title":"Manage Sci"}],"container-title":["Encyclopedia of Optimization"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-0-387-74759-0_555","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,11]],"date-time":"2024-07-11T10:01:55Z","timestamp":1720692115000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-0-387-74759-0_555"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008]]},"ISBN":["9780387747583","9780387747590"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-0-387-74759-0_555","relation":{},"subject":[],"published":{"date-parts":[[2008]]}}}