{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T19:49:32Z","timestamp":1742932172389,"version":"3.40.3"},"publisher-location":"Boston, MA","reference-count":34,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780387747583"},{"type":"electronic","value":"9780387747590"}],"license":[{"start":{"date-parts":[[2008,1,1]],"date-time":"2008-01-01T00:00:00Z","timestamp":1199145600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2008,1,1]],"date-time":"2008-01-01T00:00:00Z","timestamp":1199145600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008]]},"DOI":"10.1007\/978-0-387-74759-0_639","type":"book-chapter","created":{"date-parts":[[2008,8,25]],"date-time":"2008-08-25T11:08:03Z","timestamp":1219662483000},"page":"3704-3708","source":"Crossref","is-referenced-by-count":0,"title":["Static Resource Constrained Project Scheduling"],"prefix":"10.1007","author":[{"given":"Arif Volkan","family":"Vural","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Burak","family":"Eksioglu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"639_CR1_639","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1023\/A:1010949931021","volume":"102","author":"J Alcaraz","year":"2001","unstructured":"Alcaraz J,\n  Maroto C (2001) A\u00a0robust genetic algorithm for resource allocation in\n  project scheduling. Ann Oper Res\n  102:83\u2013109","journal-title":"Ann Oper Res"},{"issue":"2","key":"639_CR2_639","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1016\/S0377-2217(02)00758-0","volume":"149","author":"C Artigues","year":"2003","unstructured":"Artigues C,\n  Michelon P, Reusser S (2003) Insertion techniques for static and dynamic\n  resource-constrained project scheduling. Eur J Oper Res\n  149(2):249\u2013267","journal-title":"Eur J Oper Res"},{"key":"639_CR3_639","first-page":"1","volume-title":"Meta-heuristics: Advances and Trends in Local Search Paradigms for Optimisation","author":"T Baar","year":"1998","unstructured":"Baar T,\n  Brucker P, Knust S (1998) Tabu-search algorithms for the\n  resource-constrained project scheduling problems. In: Voss S, Martello S,\n  Osman I, Roucairol C (eds) Meta-heuristics: Advances and Trends in Local\n  Search Paradigms for Optimisation. Kluwer, Boston, pp\u00a01\u201318"},{"issue":"1","key":"639_CR4_639","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/0377-2217(90)90116-S","volume":"49","author":"FF Boctor","year":"1990","unstructured":"Boctor FF\n  (1990) Some efficient multi-heuristic procedures for the\n  resource-constrained project scheduling problem. Eur J Oper Res\n  49(1):3\u201313","journal-title":"Eur J Oper Res"},{"issue":"8","key":"639_CR5_639","doi-asserted-by":"publisher","first-page":"2335","DOI":"10.1080\/00207549608905028","volume":"34","author":"FF Boctor","year":"1996","unstructured":"Boctor FF\n  (1996) Resource-constrained project scheduling by simulated annealing. Int J\n  Prod Res 34(8):2335\u20132351","journal-title":"Int J Prod Res"},{"issue":"2","key":"639_CR6_639","doi-asserted-by":"publisher","first-page":"268","DOI":"10.1016\/S0377-2217(02)00761-0","volume":"149","author":"K Bouleimen","year":"2003","unstructured":"Bouleimen K,\n  Lecocq H (2003) A\u00a0new efficient simulated annealing algorithm for the\n  resource-constrained project management problem and its multiple mode\n  version. Eur J Oper Res 149(2):268\u2013281","journal-title":"Eur J Oper Res"},{"issue":"1","key":"639_CR7_639","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker P,\n  Drexl A, M\u00f6hring R, Neumann K, Pesch E (1999) Resource-constrained project\n  scheduling: Notation, models, and methods.  Eur J Oper Res\n  112(1):3\u201341","journal-title":"Eur J Oper Res"},{"key":"639_CR8_639","doi-asserted-by":"publisher","first-page":"272","DOI":"10.1016\/S0377-2217(97)00335-4","volume":"107","author":"P Brucker","year":"1998","unstructured":"Brucker P,\n  Knust S, Schoo A, Thiele O (1998) A\u00a0branch and bound algorithm for the\n  resource-constrained project scheduling problem.  Eur J Oper Res\n  107:272\u2013288","journal-title":"Eur J Oper Res"},{"key":"639_CR9_639","doi-asserted-by":"publisher","first-page":"735","DOI":"10.1057\/palgrave.jors.2600416","volume":"48","author":"JH Cho","year":"1997","unstructured":"Cho JH, Kim\n  YD (1997) A\u00a0simulated annealing algorithm for resource constrained\n  project scheduling problems. J\u00a0Oper Res Soc\n  48:735\u2013744","journal-title":"J Oper Res Soc"},{"issue":"2","key":"639_CR10_639","doi-asserted-by":"publisher","first-page":"262","DOI":"10.1016\/0377-2217(87)90240-2","volume":"29","author":"N Christofides","year":"1987","unstructured":"Christofides\n  N, Alvarez-Valdes R, Tamarit JM (1987) Project scheduling with resource\n  constraints: A\u00a0branch and bound approach.  Eur J Oper Res\n  29(2):262\u2013273","journal-title":"Eur J Oper Res"},{"issue":"12","key":"639_CR11_639","doi-asserted-by":"publisher","first-page":"1803","DOI":"10.1287\/mnsc.38.12.1803","volume":"38","author":"E Demeulemeester","year":"1992","unstructured":"Demeulemeester\n  E, Herroelen W (1992) A\u00a0branch and bound procedure for the multiple\n  resource constrained project scheduling problem.  Manage Sci\n  38(12):1803\u20131818","journal-title":"Manage Sci"},{"issue":"11","key":"639_CR12_639","doi-asserted-by":"publisher","first-page":"1485","DOI":"10.1287\/mnsc.43.11.1485","volume":"43","author":"E Demeulemeester","year":"1995","unstructured":"Demeulemeester\n  E, Herroelen W (1995) New benchmark results for the resource-constrained\n  project scheduling problem. Manage Sci\n  43(11):1485\u20131492","journal-title":"Manage Sci"},{"key":"639_CR13_639","doi-asserted-by":"publisher","first-page":"733","DOI":"10.1002\/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C","volume":"456","author":"S Hartmann","year":"1998","unstructured":"Hartmann S\n  (1998) A\u00a0competitive genetic algorithm for the resource-constrained\n  project scheduling. Naval Res Logist\n  456:733\u2013750","journal-title":"Naval Res Logist"},{"key":"639_CR14_639","doi-asserted-by":"crossref","first-page":"478","DOI":"10.1007\/978-3-642-58627-9","volume-title":"Project scheduling under limited resources: models, methods, and applications. Lecture Notes in Economics and Mathematical Systems","author":"S Hartmann","year":"1999","unstructured":"Hartmann S\n  (1999) Project scheduling under limited resources: models, methods, and\n  applications. Lecture Notes in Economics and Mathematical Systems. Springer,\n  Berlin, p\u00a0478"},{"key":"639_CR15_639","doi-asserted-by":"publisher","first-page":"394","DOI":"10.1016\/S0377-2217(99)00485-3","volume":"127","author":"S Hartmann","year":"2000","unstructured":"Hartmann\n  S, Kolisch R (2000) Experimental evaluation of state-of-the-art heuristics\n  for the resource constrained project scheduling problem. Eur J Oper Res\n  127:394\u2013407","journal-title":"Eur J Oper Res"},{"issue":"4","key":"639_CR16_639","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/S0305-0548(97)00055-5","volume":"25","author":"W Herroelen","year":"1998","unstructured":"Herroelen\n  W, Demeulemeester E, De Reyck B (1998) Resource-constrained project\n  scheduling\u00a0\u2013 A\u00a0survey of recent developments. Comput Oper Res\n  25(4):279\u2013302","journal-title":"Comput Oper Res"},{"key":"639_CR17_639","first-page":"1","volume-title":"Project Scheduling: Recent Models, Algorithms and Applications","author":"W Herroelen","year":"1999","unstructured":"Herroelen\n  W, Demeulemeester E, De Reyck B (1999) A\u00a0classification scheme for\n  project scheduling. In: Weglarz J (ed) Project Scheduling: Recent Models,\n  Algorithms and Applications. Kluwer, Boston,\n  pp\u00a01\u201326"},{"issue":"8","key":"639_CR18_639","doi-asserted-by":"publisher","first-page":"842","DOI":"10.1016\/0305-0548(94)90014-0","volume":"21","author":"O Icmeli","year":"1994","unstructured":"Icmeli O,\n  Erenguc S (1994) A\u00a0tabu-search procedure for the resource constrained\n  project scheduling problem with discounted cash flows.  Comput Oper Res\n  21(8):842\u2013853","journal-title":"Comput Oper Res"},{"issue":"11","key":"639_CR19_639","doi-asserted-by":"publisher","first-page":"80","DOI":"10.1108\/01443579310046454","volume":"13","author":"O Icmeli","year":"1993","unstructured":"Icmeli O,\n  Erenguc S, Zappe C (1993) Project scheduling problems: A\u00a0survey. Int J\n  Oper Prod Manage 13(11):80\u201391","journal-title":"Int J Oper Prod Manage"},{"key":"639_CR20_639","doi-asserted-by":"publisher","first-page":"203","DOI":"10.1023\/A:1018912715283","volume":"90","author":"U Kohlmorgen","year":"1999","unstructured":"Kohlmorgen\n  U, Schmeck H, Haase K (1999) Experiences with fine grained parallel genetic\n  algorithms. Ann Oper Res 90:203\u2013219","journal-title":"Ann Oper Res"},{"key":"639_CR21_639","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/0272-6963(95)00032-1","volume":"14","author":"R Kolisch","year":"1996","unstructured":"Kolisch R\n  (1996) Efficient priority rule for the resource constrained\n  project-scheduling problem. J\u00a0Oper Manage\n  14:179\u2013192","journal-title":"J Oper Manage"},{"key":"639_CR22_639","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1002\/(SICI)1520-6750(199602)43:1<23::AID-NAV2>3.0.CO;2-P","volume":"43","author":"R Kolisch","year":"1996","unstructured":"Kolisch R,\n  Drexl A (1996) Adaptive search for solving hard scheduling problems. Naval\n  Res Logist 43:23\u201340","journal-title":"Naval Res Logist"},{"key":"639_CR23_639","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1007\/978-1-4615-5533-9_7","volume-title":"Project Scheduling: Recent Models, Algorithms, and Applications","author":"R Kolisch","year":"1999","unstructured":"Kolisch R,\n  Hartmann S (1999) Heuristic algorithms for solving the resource constrained\n  project scheduling problem: Classification and computational analysis. In:\n  Weglarz J (ed) Project Scheduling: Recent Models, Algorithms, and\n  Applications. Kluwer, Boston,\n  pp\u00a0147\u2013178"},{"issue":"1","key":"639_CR24_639","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R Kolisch","year":"2006","unstructured":"Kolisch R,\n  Hartmann S (2006) Experimental investigation of heuristics for resource\n  constrained project scheduling: An update. Eur J Oper Res\n  174(1):23\u201337","journal-title":"Eur J Oper Res"},{"issue":"3","key":"639_CR25_639","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"29","author":"R Kolisch","year":"2001","unstructured":"Kolisch R,\n  Padman R (2001) An integrated survey of project deterministic\n  scheduling. OMEGA Int J Manage Sci\n  29(3):249\u2013272","journal-title":"OMEGA Int J Manage Sci"},{"key":"639_CR26_639","doi-asserted-by":"publisher","first-page":"678","DOI":"10.1057\/palgrave.jors.0470507","volume":"47","author":"JK Lee","year":"1996","unstructured":"Lee JK,\n  Kim YD (1996) Search heuristics for the resource constrained project\n  scheduling problem. J\u00a0Oper Res Soc\n  47:678\u2013689","journal-title":"J Oper Res Soc"},{"issue":"2","key":"639_CR27_639","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1007\/BF01719262","volume":"17","author":"VJ Leon","year":"1995","unstructured":"Leon VJ,\n  Ramamoorthy B (1995) Strength and adaptability of problem-space based\n  neighborhoods for resource constrained scheduling. OR Spektrum\n  17(2):173\u2013182","journal-title":"OR Spektrum"},{"key":"639_CR28_639","doi-asserted-by":"publisher","first-page":"714","DOI":"10.1287\/mnsc.44.5.714","volume":"44","author":"A Mingozzi","year":"1998","unstructured":"Mingozzi\n  A, Maniezzo V, Ricardelli S, Bianco L (1998) An exact algorithm for project\n  scheduling with resources constraints based on a\u00a0new mathematical\n  formulation. Manage Sci 44:714\u2013729","journal-title":"Manage Sci"},{"key":"639_CR29_639","doi-asserted-by":"publisher","first-page":"307","DOI":"10.1023\/A:1018982423325","volume":"70","author":"KS Naphade","year":"1997","unstructured":"Naphade\n  KS, Wu SD, Storer RH (1997) Problem space search algorithms for resource\n  constrained project scheduling. Ann Oper Res\n  70:307\u2013326","journal-title":"Ann Oper Res"},{"key":"639_CR30_639","doi-asserted-by":"publisher","first-page":"574","DOI":"10.1080\/07408179508936773","volume":"27","author":"L Ozdamar","year":"1995","unstructured":"Ozdamar L,\n  Ulusoy G (1995) A\u00a0survey on the resource-constrained project scheduling\n  problem. IIE Trans 27:574\u2013586","journal-title":"IIE Trans"},{"key":"639_CR31_639","unstructured":"Pinson E,\n  Prins C, Ruiller F (1994) Using tabu search for solving the resource\n  constrained project scheduling problem. Proceedings of the 4th International\n  Workshop on Project Management and Scheduling. Leuven, Belgium,\n  pp\u00a0102\u2013106"},{"key":"639_CR32_639","doi-asserted-by":"publisher","first-page":"665","DOI":"10.1002\/1520-6750(199308)40:5<665::AID-NAV3220400509>3.0.CO;2-J","volume":"40","author":"SE Sampson","year":"1993","unstructured":"Sampson\n  SE, Weiss EN (1993) Local search techniques for the generalized resource\n  constrained project scheduling problem. Naval Res Logist\n  40:665\u2013675","journal-title":"Naval Res Logist"},{"key":"639_CR33_639","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1007\/978-1-4615-4102-8_16","volume-title":"Interfaces in Computer Science and Operations Research: Advances in Metaheuristics, Optimization, and Stochastic Modeling Technologies","author":"D Zhu","year":"1997","unstructured":"Zhu D,\n  Padman R (1997) A\u00a0cooperative multi-agent approach to constrained\n  project scheduling. In: Barr RS, Helgason RV, Kennington JL (eds) Interfaces\n  in Computer Science and Operations Research: Advances in Metaheuristics,\n  Optimization, and Stochastic Modeling Technologies.  Kluwer, Norwell MA, pp\u00a0367\u2013381"},{"key":"639_CR34_639","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1002\/(SICI)1520-6750(199912)46:8<912::AID-NAV3>3.0.CO;2-C","volume":"46","author":"D Zhu","year":"1999","unstructured":"Zhu D,\n  Padman R (1999) A\u00a0metaheuristic scheduling procedure for\n  resource-constrained projects with cash flows. Naval Res Logist\n  46:1\u201318","journal-title":"Naval Res Logist"}],"container-title":["Encyclopedia of Optimization"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-0-387-74759-0_639","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,11]],"date-time":"2024-07-11T10:44:19Z","timestamp":1720694659000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-0-387-74759-0_639"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008]]},"ISBN":["9780387747583","9780387747590"],"references-count":34,"URL":"https:\/\/doi.org\/10.1007\/978-0-387-74759-0_639","relation":{},"subject":[],"published":{"date-parts":[[2008]]}}}