{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T01:28:24Z","timestamp":1725499704665},"publisher-location":"Boston, MA","reference-count":6,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780387763118"},{"type":"electronic","value":"9780387763125"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-0-387-76312-5_71","type":"book-chapter","created":{"date-parts":[[2007,12,28]],"date-time":"2007-12-28T22:00:00Z","timestamp":1198879200000},"page":"1413-1417","source":"Crossref","is-referenced-by-count":0,"title":["A Research on a Genetic Algorithm for Hybrid Production Style"],"prefix":"10.1007","author":[{"given":"Zijian","family":"Zhang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lili","family":"Jiang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qiang","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"4","key":"71_CR1","first-page":"510","volume":"23","author":"R. Xiong","year":"1996","unstructured":"R. Xiong, H. Chen, and B. Hu. An integration model for production planning and job scheduling and its Lagrangian relaxation-lased solution approach, Journal of Xidian University. Volume 23, Number 4, pp.510\u2013516, (1996).","journal-title":"Journal of Xidian University"},{"issue":"8","key":"71_CR2","doi-asserted-by":"publisher","first-page":"1201","DOI":"10.1287\/mnsc.38.8.1201","volume":"38","author":"J.B. Lasserre","year":"1992","unstructured":"J.B. Lasserre, An integrated for job-shop planning and scheduling, Management Science. Volume 38, Number 8, pp.1201\u20131211, (1992).","journal-title":"Management Science"},{"issue":"2","key":"71_CR3","first-page":"1001","volume":"94","author":"H. Li","year":"2006","unstructured":"H. Li, W. Peng, and H. Shi. Optimization model of production scheduling on the assemble shop floor, Machinery Design & Manufacture. Volume 94, Number 2, pp.1001\u20133997, (2006).","journal-title":"Machinery Design & Manufacture"},{"key":"71_CR4","unstructured":"V. Lo and J. Mache, Job Scheduling for Prime Time vs. Non-Prime Time, in Proc. of the IEEE international Conference on Cluster Computing (2002), pp.488\u2013493."},{"key":"71_CR5","volume-title":"Genetic algorithm-theory, application and software develop","author":"X. Wang","year":"2002","unstructured":"X. Wang and L. Cao, Genetic algorithm-theory, application and software develop (Xi\u2019an Jiaotong University press: Xi\u2019an, 2002)."},{"issue":"1663","key":"71_CR6","first-page":"1006","volume":"12","author":"W. Shang","year":"2005","unstructured":"W. Shang and Y. Fan, Integrated optimization modeling of production planning & scheduling for batch production, Computer Integrated Manufacturing Systems. Volume 12, Number 1663, pp.1006\u20135911, (2005).","journal-title":"Computer Integrated Manufacturing Systems"}],"container-title":["IFIP International Federation for Information Processing","Research and Practical Issues of Enterprise Information Systems II"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-0-387-76312-5_71.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,29]],"date-time":"2021-04-29T04:00:19Z","timestamp":1619668819000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-0-387-76312-5_71"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9780387763118","9780387763125"],"references-count":6,"URL":"https:\/\/doi.org\/10.1007\/978-0-387-76312-5_71","relation":{},"subject":[]}}