{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,26]],"date-time":"2025-10-26T14:13:02Z","timestamp":1761487982727},"publisher-location":"Boston, MA","reference-count":15,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780387772486"},{"type":"electronic","value":"9780387772493"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-0-387-77249-3_2","type":"book-chapter","created":{"date-parts":[[2008,1,25]],"date-time":"2008-01-25T13:05:50Z","timestamp":1201266350000},"page":"11-19","source":"Crossref","is-referenced-by-count":9,"title":["Sizing of Heijunka-controlled Production Systems with Unreliable Production Processes"],"prefix":"10.1007","author":[{"given":"Christian R.","family":"Lippolt","sequence":"first","affiliation":[]},{"given":"Kai","family":"Furmans","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"2_CR1_Ref","unstructured":"Furmans, K. (2005): Models of Heijunka-levelled Kanban-Systems. In: C.T. Papadopoulos (Ed.): 5th International Conference on Analysis of Manufacturing Systems - Production and Management 2005, Zakynthos Island, Greece, pp. 243\u2013248. Publishing Ziti, Thessaloniki, Greece, \n                      http:\/\/www.icsd.aegean.gr\/aic2005\/Papers\/Furmans.pdf\n                      \n                    ."},{"issue":"9","key":"2_CR2_Ref","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1108\/01443579510099670","volume":"15","author":"H. Yan","year":"1995","unstructured":"Yan, H. (1995): The optimal number of kanbans in a manufacturing system with general machine breakdowns and stochastic demands, Internat. Journal of Operations & Production Management, Vol. 15, Nr. 9, pp. 89\u2013103.","journal-title":"Journal of Operations & Production Management"},{"key":"2_CR3_Ref","volume-title":"The Toyota Production System: beyond large scale production","author":"T. Ohno","year":"1988","unstructured":"Ohno, T. (1988): The Toyota Production System: beyond large scale production, Productivity Press, Portland, OR, Cambridge, Mass."},{"key":"2_CR4_Ref","first-page":"668","volume-title":"Factory Physics, Foundation of Manufacturing Management","author":"W. J. Hopp","year":"1996","unstructured":"Hopp, W. J., Spearman, M. L. (1996): Factory Physics, Foundation of Manufacturing Management. Irwin\/McGraw-Hill, Boston, Mass., 2nd edition 2000, 668 p.","edition":"2nd edition"},{"key":"2_CR5_Ref","unstructured":"Adams, M., Schroer, B. J., Gunter, L. (2001): Impact of process variability on lean manufacturing systems. Proceedings of the Huntsville Simulation Conference, 2001, Huntsville, AL."},{"key":"2_CR6_Ref","volume-title":"Modern trends in manufacturing. 2nd Internat","author":"T. Koch","year":"2003","unstructured":"Koch, T., Kornicki, L. (2003): Minimizing variability in manufacturing systems in the context of lean manufacturing implementation. Modern trends in manufacturing. 2nd Internat. CAMT Conference. Wroc\u00e1aw, Poland."},{"key":"2_CR7_Ref","first-page":"350","volume-title":"The Toyota way: 14 management principles from the world\u2019s greatest manufacturer","author":"J. K. Liker","year":"2004","unstructured":"Liker, J. K. (2004): The Toyota way: 14 management principles from the world\u2019s greatest manufacturer. McGraw-Hill, New York. 350 p."},{"key":"2_CR8_Ref","volume-title":"Toyota Production System, practical approach to production management","author":"Y Monden","year":"1983","unstructured":"Monden Y. (1983): Toyota Production System, practical approach to production management. Industrial Engineering and Managment Press, Institute of Industrial Engineers, Norscross, GA. USA."},{"key":"2_CR9_Ref","first-page":"112","volume-title":"Learning to see: Value-Stream Mapping to Create Value and Eliminate Muda","author":"M. Rother","year":"1999","unstructured":"Rother, M., Shook, J. (1999): Learning to see: Value-Stream Mapping to Create Value and Eliminate Muda, Lean Enterprise Institute (LEI), Brookline, Mass., 112 p.; ISBN: 0966784308."},{"key":"2_CR10_Ref","volume-title":"Das System der Mixed Production, flexibel, rationell, kundenorientiert","author":"H. Takeda","year":"1996","unstructured":"Takeda, H. (1996): Das System der Mixed Production, flexibel, rationell, kundenorientiert. Verlag Moderne Industrie, Landsberg, Deutschland."},{"key":"2_CR11_Ref","first-page":"110","volume-title":"Creating level pull: a lean production-system improvement guide for production-control, operations, and engineering professionals","author":"A. Smalley","year":"2004","unstructured":"Smalley, A. (2004): Creating level pull: a lean production-system improvement guide for production-control, operations, and engineering professionals. LeanManagement-Institut (LMI), Aachen, Deutschland. ISBN: 0\u20139743225\u20130\u20134 (englisch); 0\u20139763152\u20134\u20136 (deutsch). c. 110 p."},{"key":"2_CR12_Ref","doi-asserted-by":"publisher","first-page":"1487","DOI":"10.1080\/00207548908942636","volume":"27","author":"J. Miltenburg","year":"1989","unstructured":"Miltenburg, J., Sinnamon, G. (1989): Scheduling mixed-model multi-level justin-time production systems. Internat Journal of Production Research 27, pp. 1487\u20131509.","journal-title":"Internat Journal of Production Research"},{"key":"2_CR13_Ref","first-page":"540","volume-title":"Verfahren der Fertigungssteuerung: Grundlagen, Beschreibung, Konfiguration","author":"H. L\u00f6dding","year":"2004","unstructured":"L\u00f6dding, H. (2004): Verfahren der Fertigungssteuerung: Grundlagen, Beschreibung, Konfiguration. Buch der VDI-Reihe, Springer, Heidelberg, Berlin. 540 p."},{"key":"2_CR14_Ref","volume-title":"Produktion und Logistik (6. Auflage; Erstauflage 1995)","author":"H.-O. G\u00fcnther","year":"2005","unstructured":"G\u00fcnther, H.-O., Tempelmeier, H. (2005): Produktion und Logistik (6. Auflage; Erstauflage 1995), Springer-Lehrbuch. Springer, Heidelberg."},{"issue":"1","key":"2_CR15_Ref","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1287\/opre.37.1.141","volume":"37","author":"J. L. Grassmann","year":"1989","unstructured":"Grassmann, J. L., Jain, W. K. (1989): Numerical solutions of the waiting time distribution and idle time distribution of the arithmetic GI|G|1 queue, Operations Research 37 (1989), No 1, pp. 141\u2013150.","journal-title":"Operations Research"}],"container-title":["IFIP \u2013 The International Federation for Information Processing","Lean Business Systems and Beyond"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-0-387-77249-3_2.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,29]],"date-time":"2021-04-29T04:12:27Z","timestamp":1619669547000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-0-387-77249-3_2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9780387772486","9780387772493"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-0-387-77249-3_2","relation":{},"subject":[]}}