{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T01:56:34Z","timestamp":1725501394417},"publisher-location":"Boston, MA","reference-count":9,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780387772486"},{"type":"electronic","value":"9780387772493"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-0-387-77249-3_6","type":"book-chapter","created":{"date-parts":[[2008,1,25]],"date-time":"2008-01-25T13:05:50Z","timestamp":1201266350000},"page":"49-56","source":"Crossref","is-referenced-by-count":1,"title":["Planning and Balancing of Disassembly Systems"],"prefix":"10.1007","author":[{"given":"Gert","family":"Z\u00fclch","sequence":"first","affiliation":[]},{"given":"Rainer","family":"Schwarz","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"6_CR1_Ref","unstructured":"Gert Z\u00fclch, Reinhard M\u00fcller, and Emmerich F. Schiller, Information System for Supporting Manual Disassembly Tasks, in: ICME 2000, The Eighth International Conference on Manufacturing Engineering, edited by Causal Productions (2000), Compact disk, file:\/\/\/D|\/HTML\/ME00S104.HTM."},{"key":"6_CR2_Ref","unstructured":"Gert Z\u00fclch and J\u00f6rg W. Fischer, Increasing the Flexibility of Working Times and Personnel Control in an Industrial Repair Work System, (Espoo, Sim-Serv, 2004) \n                      http:\/\/www.sim-serv.com\/white_papers.php\n                      \n                     (August 13, 2004)."},{"key":"6_CR3_Ref","unstructured":"Gert Z\u00fclch and Joachim Greinke, Simulation-aided Reconfiguration of an Industrial Service System for the Repair of Electrical Tools (Espoo, Sim-Serv, 2004), \n                      http:\/\/www.sim-serv.com\/white_papers.php\n                      \n                     (November 05, 2004)."},{"key":"6_CR4_Ref","first-page":"245","volume-title":"ECO-Performance \u201896, edited by Rainer Z\u00fcst, Gabriel Caduff, and Michael Frei","author":"Gert Z\u00fclch","year":"1996","unstructured":"Gert Z\u00fclch, Emmerich F. Schiller, and Milko Schneck, Adaptive Dynamic Process Plans - A Basis for a Disassembly Information System, in: ECO-Performance \u201896, edited by Rainer Z\u00fcst, Gabriel Caduff, and Michael Frei (Z\u00fcrich, Verlag Industrielle Organisation, 1996), pp. 245\u2013253."},{"key":"6_CR5_Ref","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1007\/0-387-23078-5_12","volume-title":"Integrating Human Aspects in Production Management","author":"J\u00f6rg Fischer","year":"2005","unstructured":"J\u00f6rg Fischer, Patricia Stock, and Gert Z\u00fclch, Simulation of Disassembly and Re assembly Processes with Beta-distributed Operation Times, in: Integrating Human Aspects in Production Management, edited by Gert Z\u00fclch, Harinder S. Jagdev, and Patricia Stock (New York, Springer, 2005), pp. 147\u2013156."},{"key":"6_CR6_Ref","unstructured":"Olaf M\u00f6nig and Rainer Schwarz, Zeitermittlung f\u00fcr die manuelle Demontage, in: Aktuell, das Info-Magazin der Deutschen MTM-Vereinigung, 2(2002), (Hamburg, 2002), pp. 14\u201315."},{"key":"6_CR7_Ref","first-page":"347","volume-title":"Good Practice. Ergonomie und Arbeitsgestaltung","author":"Gert Z\u00fclch","year":"2003","unstructured":"Gert Z\u00fclch and Rainer Schwarz, Demontagesystemplanung an einem Beispiel aus der Elektroindustrie, in: Good Practice. Ergonomie und Arbeitsgestaltung, edited by Kurt Landau (Stuttgart, ergonomia Verlag, 2003), pp. 347\u2013362."},{"key":"6_CR8_Ref","doi-asserted-by":"crossref","first-page":"400","DOI":"10.1007\/978-1-4615-6381-5_34","volume-title":"Life Cycle Networks","author":"Gert Z\u00fclch","year":"1997","unstructured":"Gert Z\u00fclch, Reinhard M\u00fcller, and Emmerich F. Schiller, A Disassembly Information System, in: Life Cycle Networks, edited by Frank-Lothar Krause and G\u00fcnther Seliger (London, Weinheim, New York et al., Chapman & Hall, 1997), pp. 400\u2013412."},{"key":"6_CR9_Ref","first-page":"26","volume-title":"Beitrag zur Festlegung von Arbeitsteilung in manuellen Arbeitssystemen","author":"Wolfgang-J\u00fcrgen Braun","year":"1995","unstructured":"Wolfgang-J\u00fcrgen Braun, Beitrag zur Festlegung von Arbeitsteilung in manuellen Arbeitssystemen (Aachen, Shaker, 1995), p. 26."}],"container-title":["IFIP \u2013 The International Federation for Information Processing","Lean Business Systems and Beyond"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-0-387-77249-3_6.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,29]],"date-time":"2021-04-29T04:12:45Z","timestamp":1619669565000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-0-387-77249-3_6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9780387772486","9780387772493"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-0-387-77249-3_6","relation":{},"subject":[]}}