{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T01:56:34Z","timestamp":1725501394845},"publisher-location":"Boston, MA","reference-count":15,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780387772486"},{"type":"electronic","value":"9780387772493"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-0-387-77249-3_7","type":"book-chapter","created":{"date-parts":[[2008,1,25]],"date-time":"2008-01-25T08:05:50Z","timestamp":1201248350000},"page":"57-65","source":"Crossref","is-referenced-by-count":0,"title":["Demand Planning &amp; Control \u2013 Handling Multiple Perspectives Through a Holistic Approach to Hierarchical Planning"],"prefix":"10.1007","author":[{"given":"Peter","family":"Nielsen","sequence":"first","affiliation":[]},{"given":"Kenn","family":"Steger-Jensen","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"7_CR1_Ref","doi-asserted-by":"publisher","first-page":"717","DOI":"10.1287\/opre.29.4.717","volume":"29","author":"G. R. Bitran","year":"1981","unstructured":"Bitran, G. R., E. A. Haas, and A. C. Hax, Hierarchical Production Planning: A Single Stage System, Operations Research, 29, pp. 717\u2013743, 1981.","journal-title":"Operations Research"},{"key":"7_CR2_Ref","doi-asserted-by":"publisher","first-page":"232","DOI":"10.1287\/opre.30.2.232","volume":"30","author":"G. R. Bitran","year":"1982","unstructured":"Bitran, G. R., E. A. Haas, and A. C. Hax, Hierarchical Production Planning: A Two Stage Approach, Operations Research, 30, pp. 232\u2013251, 1982.","journal-title":"Operations Research"},{"key":"7_CR3_Ref","unstructured":"Bitran, G. R. and A. C. Hax, On the design of hierarchical production planning and inventory control systems, Bulletin of the Operations Research Society of America, 23, 1975."},{"key":"7_CR4_Ref","unstructured":"Chankong, V., and Y. Y. Haimes, \u201cMultiobjective decision making: theory and methodology\u201d, North-holland series in System Science and Engineering; 8, Elsevier Science, 1983."},{"key":"7_CR5_Ref","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1108\/02635570110365952","volume":"101","author":"G. Fliedner","year":"2001","unstructured":"Fliedner, G., Hierarchical forecasting: issues and use guidelines, Industrial Management & Data Systems, 101, pp. 5\u201312, 2001.","journal-title":"Industrial Management & Data Systems"},{"key":"7_CR6_Ref","doi-asserted-by":"publisher","first-page":"38","DOI":"10.1108\/eb054765","volume":"6","author":"B. E. Flores","year":"1986","unstructured":"Flores, B. E., and D. C. Whybark, Multiple Criteria ABC Analysis, International Journal of Operations & Production Management, 6, pp. 38\u201346, 1986.","journal-title":"International Journal of Operations & Production Management"},{"key":"7_CR7_Ref","volume-title":"Hierarchical production planning systems","author":"A. C. Hax","year":"1978","unstructured":"Hax A. C. and J. J. Golovin, Hierarchical production planning systems, Studies in Operations Management, North-Holland, 1978."},{"key":"7_CR8_Ref","volume-title":"Logistics, vol. 1 of Studies in the Management Sciences","author":"A. C. Hax","year":"1975","unstructured":"Hax, A. C., and H. C. Meal, Hierarchical Integration of Production Planning and Scheduling, in edited by M. A. Geisler, Logistics, vol. 1 of Studies in the Management Sciences, North-Holland\/American Elsevier, 1975."},{"key":"7_CR9_Ref","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0377-2217(89)90266-X","volume":"6","author":"L. C. Hendry","year":"1989","unstructured":"Hendry, L. C. and B. G. Kingsman, Production Planning Systems and Their Applicability to Make-to-Order Companies, European Journal of Operational Research, 6, pp. 1\u201315, 1989.","journal-title":"European Journal of Operational Research"},{"key":"7_CR10_Ref","unstructured":"Ignizio, J. P., Goal Programming and Extensions, Lexington Books, 1976."},{"key":"7_CR11_Ref","unstructured":"Lee, S. M., Goal Programming for Decision Analysis, First edition, Auerbach Publishers Inc., 1972."},{"key":"7_CR12_Ref","doi-asserted-by":"publisher","first-page":"306","DOI":"10.1016\/S0377-2217(02)00396-X","volume":"144","author":"A. Otto","year":"2003","unstructured":"Otto, A., and H. Kotzab, Does supply chain management really pay? Six perspectives to measure the performance of managing a supply chain, European Journal of Operational Research, 144, pp. 306\u2013320, 2003.","journal-title":"European Journal of Operational Research"},{"key":"7_CR13_Ref","unstructured":"Silver, E. A., D. F. Pyke, and R. Peterson, Inventory Management and Production Planning and Scheduling, third ed., John Wiley & Sons, 1998."},{"key":"7_CR14_Ref","unstructured":"Theil, H., Applied Economic Forecasting, vol. 4 of Studies in Mathematical and Managerial Economics, North-Holland Publishing Company, 1966."},{"key":"7_CR15_Ref","unstructured":"Vollmann, T., W. Berry, and D. Whybark, Manufacturing Planning and Control Systems, fourth ed., Irwin\/McGraw-Hill, 1997."}],"container-title":["IFIP \u2013 The International Federation for Information Processing","Lean Business Systems and Beyond"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-0-387-77249-3_7.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,29]],"date-time":"2021-04-29T00:12:46Z","timestamp":1619655166000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-0-387-77249-3_7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9780387772486","9780387772493"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-0-387-77249-3_7","relation":{},"subject":[]}}