{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T21:06:24Z","timestamp":1743109584838,"version":"3.40.3"},"publisher-location":"London","reference-count":36,"publisher":"Springer London","isbn-type":[{"type":"print","value":"9780857297983"},{"type":"electronic","value":"9780857297990"}],"license":[{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-0-85729-799-0_50","type":"book-chapter","created":{"date-parts":[[2011,7,6]],"date-time":"2011-07-06T11:09:21Z","timestamp":1309950561000},"page":"425-432","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Concurrent Engineering Yesterday, Today and Tomorrow"],"prefix":"10.1007","author":[{"given":"Alemu Moges","family":"Belay","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Petri","family":"Helo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fentahun Moges","family":"Kasie","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2011,7,7]]},"reference":[{"key":"50_CR1","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1016\/S0925-5273(98)00152-2","volume":"60\u201361","author":"HS Abdalla","year":"1999","unstructured":"Abdalla HS. Concurrent engineering for global manufacturing. Int. J. Production Economics 1999;60-61: 251-60","journal-title":"Int. J. Production Economics"},{"key":"50_CR2","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1108\/02635570210428294","volume":"102","author":"CJ Anumba","year":"2002","unstructured":"Anumba CJ, Baugh C, Khalfan, MA. Organizational structures to support concurrent engineering. Industrial management & data systems 2002;102:260-70","journal-title":"Industrial management & data systems"},{"key":"50_CR3","doi-asserted-by":"publisher","first-page":"566","DOI":"10.1108\/09600030010346233","volume":"30","author":"CJ Anumba","year":"2000","unstructured":"Anumba CJ, Siemieniuch CE, Sinclair MA. Supply chain implications of concurrent engineering. International Journal of Physical Distribution & Logistics Management 2000; 30: 566-97","journal-title":"International Journal of Physical Distribution & Logistics Management"},{"key":"50_CR4","first-page":"45","volume":"6","author":"AM Belay","year":"2011","unstructured":"Belay AM, Helo P, Takala J, Kasie FM. Effects of Quality Management Practices and Concurrent Engineering in Business Performance. International Journal of Business and Management 2011;6:45-62","journal-title":"International Journal of Business and Management"},{"key":"50_CR5","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1108\/EUM0000000004225","volume":"15","author":"D Bradley","year":"1995","unstructured":"Bradley D. Concurrent engineering for bespoke products. Assembly Automation 1995;15:. 35-37","journal-title":"Assembly Automation"},{"key":"50_CR6","doi-asserted-by":"crossref","unstructured":"Brooks B.Realising the benefits of concurrent engineering through BPR. Computing & Control Engineering Journal 1996","DOI":"10.1049\/cce:19960201"},{"key":"50_CR7","doi-asserted-by":"crossref","unstructured":"Chou S, Trappey A, Pokojski J, Smith S. Global Perspective for Competitive Enterprise, Economy and Ecology: Proceedings of the 16th ISPE International Conference on Concurrent Engineering 2009","DOI":"10.1007\/978-1-84882-762-2"},{"key":"50_CR8","doi-asserted-by":"crossref","unstructured":"Curran R, Chou SY, Trappey A. Collaborative Product and Service Life Cycle Management for a Sustainable World. Proceedings of the 15th ISPE International Conference on Concurrent Engineering. Verlag London Limited 2008: Springer","DOI":"10.1007\/978-1-84800-972-1"},{"key":"50_CR9","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1111\/j.1467-9310.2007.00486.x","volume":"37","author":"N Harmancioglu","year":"2007","unstructured":"Harmancioglu N, McNally RC, Calantone RJ, Durmusoglu SS.Your new product development [NPD) is only as good as your process: an exploratory analysis of new NPD process design and implementation. R&D Management 2007; 37:339-424","journal-title":"R&D Management"},{"key":"50_CR10","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1016\/S0925-5273(99)00068-7","volume":"64","author":"PM Herder","year":"2000","unstructured":"Herder PM, Weijnen PC. A concurrent engineering approach to chemical process design Int. J. Production Economics 2000;64: 311-18","journal-title":"J. Production Economics"},{"key":"50_CR11","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1111\/j.1540-5915.1999.tb01599.x","volume":"30","author":"GM Hoedemaker","year":"1999","unstructured":"Hoedemaker GM, Blackburn JD, Van Wassenhove LN. Limits of concurrency. Decision sciences 1999;30:1-18","journal-title":"Decision sciences"},{"key":"50_CR12","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1108\/00438029910262464","volume":"48","author":"M Jarvis","year":"1999","unstructured":"Jarvis M. Concurrent engineering. Work Study 1999;48:88\u201391","journal-title":"Work Study"},{"key":"50_CR13","doi-asserted-by":"publisher","first-page":"672","DOI":"10.1007\/s00170-003-1641-y","volume":"23","author":"LM Jiao","year":"2004","unstructured":"Jiao LM, Khoo LP, Chen CH. An intelligent concurrent design task lanner for manufacturing systems. Int J Adv Manuf Technol 2004; 23: 672\u201381","journal-title":"Int J Adv Manuf Technol"},{"key":"50_CR14","first-page":"68","volume":"2","author":"JM Kamara","year":"2000","unstructured":"Kamara JM, Anumba CJ, Evbuomwan NFO. Developments in the Implementation of Concurrent Engineering in Construction. International Journal of Computer-Integrated Design and Construction 2000; 2: 68\u201378","journal-title":"International Journal of Computer-Integrated Design and Construction"},{"key":"50_CR15","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1177\/1063293X09102254","volume":"17","author":"L Kong","year":"2009","unstructured":"Kong L, Bhuiyan N, Thomson V. The Value of Organizational Structures. Concurrent Engineering 2009; 17: 61-72","journal-title":"Concurrent Engineering"},{"key":"50_CR16","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1108\/02635570110386634","volume":"101","author":"R Kumar","year":"2001","unstructured":"Kumar R, Midha PS. A QFD based methodology for evaluating a company\u2019s PDM requirements for collaborative product development. Industrial management and data systems 2001;101:126-31","journal-title":"Industrial management and data systems"},{"key":"50_CR17","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1016\/S0925-5273(99)00067-5","volume":"64","author":"RV Landeghem","year":"2000","unstructured":"Landeghem RV. Experiences with a concurrent engineering self-assessment tool. Int. J. Production Economics 2000; 64:295-309","journal-title":"Int. J. Production Economics"},{"key":"50_CR18","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1177\/1063293X09105328","volume":"17","author":"Y Li","year":"2009","unstructured":"Li Y, Jian J, Yan R, Liao W. Aircraft Tooling Collaborative Design Based on Multi-agent and PDM. Concurrent Engineering 2009; 17: 139-46","journal-title":"Concurrent Engineering"},{"key":"50_CR19","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1177\/1063293X07084639","volume":"16","author":"A Lindquist","year":"2008","unstructured":"Lindquist A, Berglund F, Johannesson H. Supplier Integration and Communication Strategies in Collaborative Platform Development. Concurrent Engineering 2008; 16: 23-35","journal-title":"Concurrent Engineering"},{"key":"50_CR20","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1177\/1063293X09102249","volume":"17","author":"D Luh","year":"2009","unstructured":"Luh D, Ko Y, Ma C. A Dynamic Planning Approach for New Product Development. Concurrent Engineering 2009; 17: 43-59","journal-title":"Concurrent Engineering"},{"key":"50_CR21","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1016\/S0925-5273(00)00023-2","volume":"69","author":"D Maffin","year":"2001","unstructured":"Maffin D, Braiden P. Manufacturing and supplier roles in product development. Int. J. Production Economics 2001;69: 205-13","journal-title":"Int. J. Production Economics"},{"key":"50_CR22","doi-asserted-by":"crossref","unstructured":"Melin T, Isikveren AT, Rizzi A, Stamblewski C, Anders HV. How industry concepts of concurrent engineering enhance aircraft design education. Proc. Imeche Vol. 221 Part G: J. Aerospace Engineering JAERO127 imeche 2007","DOI":"10.1243\/09544100JAERO127"},{"key":"50_CR23","unstructured":"Najmi M, Ip-Shing F. Concurrent Engineering in Total Quality Management Environment\u201d, 8th International Conference on Concurrent Enterprising 2002, Rome, Italy."},{"key":"50_CR24","doi-asserted-by":"crossref","unstructured":"Nicoletti S, Nicolo F. A concurrent engineering decision model: Management of the project activities information flows. Int. J. Production Economics 19981;54: 115-27","DOI":"10.1016\/S0925-5273(97)00108-4"},{"key":"50_CR25","doi-asserted-by":"crossref","unstructured":"O\u2019Neal C. Concurrent Engineering with Early Supplier Involvement: A Cross- Functional Challenge. International Journal of Purchasing and Materials Management, Spring 1993; 1-9","DOI":"10.1111\/j.1745-493X.1993.tb00001.x"},{"key":"50_CR26","doi-asserted-by":"publisher","first-page":"131","DOI":"10.1016\/j.ejor.2010.02.010","volume":"206","author":"Y Qian","year":"2010","unstructured":"Qian Y, Xie M, Goh TN, Lin J. Decision Support Optimal testing strategies in overlapped design process. European Journal of Operational Research 2010; 206: 131\u201343","journal-title":"European Journal of Operational Research"},{"key":"50_CR27","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1108\/EUM0000000004208","volume":"14","author":"PG Ranky","year":"1994","unstructured":"Ranky PG. Features Concurrent Engineering and Enterprise Modeling. Assembly Automation 1994;14:14-21","journal-title":"Assembly Automation"},{"key":"50_CR28","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/0925-5273(95)99061-9","volume":"38","author":"A Rolstadas","year":"1995","unstructured":"Rolstadas A. Planning and control of concurrent engineering projects. Int. J. Production Economics 1995; 38: 3-13","journal-title":"Int. J. Production Economics"},{"key":"50_CR29","doi-asserted-by":"publisher","first-page":"576","DOI":"10.1108\/17542730910995855","volume":"21","author":"H Sun","year":"2009","unstructured":"Sun H, Zhao Y, and Hon Keung Yau HK. The relationship between quality management and the speed of new product development. The TQM Journal 2009; 21:576-88","journal-title":"The TQM Journal"},{"key":"50_CR30","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1080\/14783361003606480","volume":"21","author":"H Sun","year":"2010","unstructured":"Sun H, Zhao Y. The empirical relationship between quality management and the speed of new product development Total Quality Management 2010;21:351\u201361","journal-title":"Total Quality Management"},{"key":"50_CR31","doi-asserted-by":"crossref","unstructured":"Tan CL, Tracey M. Collaborative New Product Development Environments: Implications for Supply Chain Management. The Journal of Supply Chain Management Summer 2007;1-15","DOI":"10.1111\/j.1745-493X.2007.00031.x"},{"key":"50_CR32","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1108\/02621710010318765","volume":"19","author":"D Tucker","year":"2000","unstructured":"Tucker D, Hackney R. Towards the integration of concurrent engineering environment within organizational strategy. Journal of management development 2000;19:179-89","journal-title":"Journal of management development"},{"key":"50_CR33","doi-asserted-by":"publisher","first-page":"128","DOI":"10.1111\/j.0737-6782.2005.00110.x","volume":"22","author":"RW Veryzer","year":"2005","unstructured":"Veryzer RW, de Mozota BB. The Impact of User-Oriented Design on New Product Development: An Examination of Fundamental Relationships. J Prod Innov Manag 2005;22:128\u201343","journal-title":"J Prod Innov Manag"},{"key":"50_CR34","first-page":"87","volume":"15","author":"SA Willaert","year":"1998","unstructured":"Willaert SA, de Graaf R, Minderhoud S. concurrent engineering in a wider context. J. Eng. Manage. 1998;15:87-109","journal-title":"J. Eng. Manage."},{"key":"50_CR35","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/j.ijpe.2006.08.009","volume":"107","author":"CC Yang","year":"2007","unstructured":"Yang CC, Chen SH, Jiun-Yan Shiau JY. A DFX and concurrent engineering model for the establishment of a new department in a university. Int. J. Production Economics 2007;107: 179\u201389","journal-title":"Int. J. Production Economics"},{"key":"50_CR36","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1177\/106329303034503","volume":"11","author":"A Yassine","year":"2003","unstructured":"\\Yassine A, Braha D. Complex Concurrent Engineering and the Design Structure Matrix Method. Concurrent Engineering 2003; 11: 165-76","journal-title":"Concurrent Engineering"}],"container-title":["Advanced Concurrent Engineering","Improving Complex Systems Today"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-0-85729-799-0_50","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,18]],"date-time":"2023-02-18T09:44:01Z","timestamp":1676713441000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-0-85729-799-0_50"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9780857297983","9780857297990"],"references-count":36,"URL":"https:\/\/doi.org\/10.1007\/978-0-85729-799-0_50","relation":{},"ISSN":["1865-5440"],"issn-type":[{"type":"print","value":"1865-5440"}],"subject":[],"published":{"date-parts":[[2011]]},"assertion":[{"value":"7 July 2011","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}