{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,10]],"date-time":"2025-02-10T03:40:07Z","timestamp":1739158807502,"version":"3.37.0"},"publisher-location":"Boston, MA","reference-count":56,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9781441900074"},{"type":"electronic","value":"9781441900111"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-1-4419-0011-1_5","type":"book-chapter","created":{"date-parts":[[2009,6,12]],"date-time":"2009-06-12T22:26:23Z","timestamp":1244845583000},"page":"59-78","source":"Crossref","is-referenced-by-count":3,"title":["Toward a Maturity Model for Knowledge Management Systems Integration"],"prefix":"10.1007","author":[{"given":"David G.","family":"Schwartz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Doron","family":"Tauber","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2009,5,18]]},"reference":[{"issue":"1","key":"5_CR1_5","doi-asserted-by":"publisher","first-page":"107","DOI":"10.2307\/3250961","volume":"25","author":"M Alavi","year":"2001","unstructured":"Alavi, M., and D.E. Leidner. 2001. Knowledge management and knowledge management systems: Conceptual foundations and research issues. MIS Quarterly 25(1): 107\u2013136.","journal-title":"MIS Quarterly"},{"key":"5_CR2_5","first-page":"100","volume":"2","author":"S Aneerav","year":"2007","unstructured":"Aneerav, S., B. Andries, M.E. Mariki, and A.V. John. 2007. An evolutionary software project management maturity model for Mauritius. Interdisciplinary Journal of Information, Knowledge, and Management 2: 100\u2013118.","journal-title":"Interdisciplinary Journal of Information, Knowledge, and Management"},{"issue":"1","key":"5_CR3_5","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1145\/291469.291479","volume":"42","author":"DE Avison","year":"1999","unstructured":"Avison, D.E., F. Lau, M. Myers, and P.A. Nielsen. 1999. Action research. Communications of the ACM 42(1): 94\u201397.","journal-title":"Communications of the ACM"},{"issue":"1","key":"5_CR4_5","doi-asserted-by":"publisher","first-page":"28","DOI":"10.1108\/09593840110384762","volume":"14","author":"DE Avison","year":"2001","unstructured":"Avison, D.E., R. Baskerville, and M. Myers. 2001. Controlling action research projects. Information technology & people 14(1): 28\u201345.","journal-title":"Information technology & people"},{"key":"5_CR5_5","doi-asserted-by":"publisher","first-page":"235","DOI":"10.1080\/026839696345289","volume":"11","author":"RL Baskerville","year":"1996","unstructured":"Baskerville, R.L., and A.T. Wood-Harper. 1996. A critical perspective on action research as a method for information systems research. Journal of Information Technology 11: 235\u2013246.","journal-title":"Journal of Information Technology"},{"key":"5_CR6_5","volume-title":"A systems engineering capability maturity model, SECMM-95-01 CMU\/SEI-95-MM-003","author":"R Bate","year":"1995","unstructured":"Bate, R., D. Kuhn, C. Wells, J. Armitage, G. Clark, K. Cusick, Garcia, et al. 1995. A systems engineering capability maturity model, SECMM-95-01 CMU\/SEI-95-MM-003. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University."},{"key":"5_CR7_5","unstructured":"Bell Canada. 1994. Trillium model \u2013 For telecom product development and support process capability. Model Issue 3.0, Bell Canada."},{"issue":"3","key":"5_CR8_5","doi-asserted-by":"publisher","first-page":"369","DOI":"10.2307\/248684","volume":"11","author":"I Benbasat","year":"1987","unstructured":"Benbasat, I., D.K. Goldstein, and M. Mead. 1987. The case research strategy in studies of information systems. MIS Quarterly 11(3): 369\u2013386.","journal-title":"MIS Quarterly"},{"key":"5_CR9_5","series-title":"Proceedings of the 13th international workshop on database and expert systems applications","first-page":"162","volume-title":"Capability maturity for knowledge management","author":"AT Berztiss","year":"2002","unstructured":"Berztiss, A.T. 2002. Capability maturity for knowledge management, 162\u2013166., Proceedings of the 13th international workshop on database and expert systems applications Washington, DC: IEEE Computer Society."},{"key":"5_CR10_5","doi-asserted-by":"crossref","first-page":"24","DOI":"10.4018\/978-1-59140-573-3.ch004","volume-title":"Encyclopedia of knowledge management","author":"AT Berztiss","year":"2006","unstructured":"Berztiss, A.T. 2006. Capability maturity. In Encyclopedia of knowledge management, ed. D.G. Schwartz, 24\u201329. Hershey, PA: Idea Group Publishing."},{"key":"5_CR11_5","volume-title":"Object-oriented analysis and design with applications","author":"G Booch","year":"1994","unstructured":"Booch, G. 1994. Object-oriented analysis and design with applications, 2nd ed. Reading, MA: Addison Wesley.","edition":"2"},{"key":"5_CR12_5","volume-title":"The labyrinth of information: Challenging the wisdom of systems","author":"C Ciborra","year":"2002","unstructured":"Ciborra, C. 2002. The labyrinth of information: Challenging the wisdom of systems. Oxford: Oxford University Press."},{"key":"5_CR13_5","unstructured":"CMMI for Development, Version 1.2. Technical report CMU\/SEI-2006-TR-008, Carnegie Mellon Software Engineering Institute, August 2006."},{"key":"5_CR14_5","volume-title":"Software acquisition capability maturity model, technical report CMU\/SEI-2002-TR-010","author":"J Cooper","year":"2002","unstructured":"Cooper, J., and M. Fisher. 2002. Software acquisition capability maturity model, technical report CMU\/SEI-2002-TR-010. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University."},{"key":"5_CR15_5","doi-asserted-by":"crossref","DOI":"10.21236\/ADA362667","volume-title":"Software acquisition capability maturity model, technical report CMU\/SEI-99-TR-002","author":"J Cooper","year":"1999","unstructured":"Cooper, J., M. Fisher, and S.W. Sherer. 1999. Software acquisition capability maturity model, technical report CMU\/SEI-99-TR-002. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University."},{"issue":"4","key":"5_CR16_5","doi-asserted-by":"publisher","first-page":"50","DOI":"10.1201\/1078.10580530\/46352.23.4.20060901\/95113.7","volume":"23","author":"JK Crawford","year":"2006","unstructured":"Crawford, J.K. 2006. The project management maturity model. Information Systems Management 23(4): 50\u201358.","journal-title":"Information Systems Management"},{"key":"5_CR17_5","doi-asserted-by":"crossref","DOI":"10.21236\/ADA388676","volume-title":"People capability maturity model","author":"B Curtis","year":"2001","unstructured":"Curtis, B., W.E. Hefley, and S.A. Miller. 2001. People capability maturity model. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University."},{"issue":"80","key":"5_CR18_5","first-page":"107","volume":"7","author":"TH Davenport","year":"2002","unstructured":"Davenport, T.H., and J. Glaser. 2002. Just-in-time delivery comes to knowledge management. Harvard Business Review 7(80): 107\u2013111.","journal-title":"Harvard Business Review"},{"key":"5_CR19_5","volume-title":"Structured analysis and systems specification","author":"T Demarco","year":"1978","unstructured":"Demarco, T. 1978. Structured analysis and systems specification. Englewood Cliffs, NJ: Prentice-Hall."},{"key":"5_CR20_5","volume-title":"You want to do an action research thesis?","author":"B Dick","year":"1993","unstructured":"Dick, B. 1993. You want to do an action research thesis?. Australia: Southern Cross University. Retrieved 5 April 2008, from http:\/\/www.scu.edu.au\/schools\/gcm\/ar\/art\/arthesis.html ."},{"key":"5_CR21_5","volume-title":"Software acquisition capability maturity model, technical report CMU\/SEI-96-TR-020","author":"J Ferguson","year":"1996","unstructured":"Ferguson, J., J. Cooper, M. Falat, M. Fisher, A. Guido, J. Marciniak, J. Matejceck, and R. Webster. 1996. Software acquisition capability maturity model, technical report CMU\/SEI-96-TR-020. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University."},{"issue":"3","key":"5_CR22_5","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1147\/sj.433.0455","volume":"43","author":"D Ferrucci","year":"2004","unstructured":"Ferrucci, D., and A. Lally. 2004. Building an example application with the unstructured information management architecture. IBM Systems Journal 43(3): 455\u2013475. Retrieved 10 April 2008, from http:\/\/www.research.ibm.com\/journal\/sj\/433\/ferrucci.html.","journal-title":"IBM Systems Journal"},{"key":"5_CR23_5","doi-asserted-by":"crossref","unstructured":"Freeze, R., and U. Kulkarni. 2005. Knowledge management capability assessment: Validating a knowledge assets measurement instrument. Proceedings of the 38th annual Hawaii international conference on system sciences, p. 251a.","DOI":"10.1109\/HICSS.2005.375"},{"key":"5_CR24_5","volume-title":"Structured systems analysis \u2013 Tools and techniques","author":"C Gane","year":"1979","unstructured":"Gane, C., and T. Sarson. 1979. Structured systems analysis \u2013 Tools and techniques. Englewood Cliffs, NJ: Prentice-Hall."},{"issue":"2","key":"5_CR25_5","doi-asserted-by":"publisher","first-page":"200","DOI":"10.1108\/02635570610649853","volume":"106","author":"P Gottschalk","year":"2006","unstructured":"Gottschalk, P., and H. Solli-Saether. 2006. Maturity model for IT outsourcing relationships. Industrial Management & Data Systems 106(2): 200\u2013212.","journal-title":"Industrial Management & Data Systems"},{"key":"5_CR26_5","series-title":"Proceedings of 8th international workshop on database and expert systems applications","first-page":"682","volume-title":"KRAFT: Knowledge fusion from distributed databases and knowledge bases","author":"PMD Gray","year":"1997","unstructured":"Gray, P.M.D., A. Preece, N.J. Fiddian, W.A. Gray, T. Bench-Capon, M. Shave, et al. 1997. KRAFT: Knowledge fusion from distributed databases and knowledge bases, 682\u2013691., Proceedings of 8th international workshop on database and expert systems applications New York: IEEE."},{"key":"5_CR27_5","first-page":"302","volume-title":"Proceedings of the 21st International Conference on Information Systems (ICIS 2000)","author":"J Hahn","year":"2000","unstructured":"Hahn, J., and M.R. Subramani. 2000. A framework of knowledge management systems: issues and challenges for theory and practice. In Proceedings of the 21st International Conference on Information Systems (ICIS 2000), ed. W.J. Orlikowski, S. Ang, P. Weill, H.C. Krcmar, and J.I. DeGrosss, 302\u2013312. Atlanta, GA: Association for Information Systems."},{"issue":"4","key":"5_CR28_5","doi-asserted-by":"publisher","first-page":"449","DOI":"10.1109\/5326.983928","volume":"31","author":"U Harigopal","year":"2001","unstructured":"Harigopal, U., and A. Satyadas. 2001. Cognizant enterprise maturity model (CEMM). IEEE Transactions on Systems, Man, and Cybernetics \u2013 Part C: Applications and Reviews 31(4): 449\u2013459.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics \u2013 Part C: Applications and Reviews"},{"key":"5_CR29_5","volume-title":"Interpreting capability maturity model integration for service organizations, technical note CMU\/SEI-2003-TN-005","author":"MA Herndon","year":"2003","unstructured":"Herndon, M.A., R. Moore, and M. Phillips. 2003. Interpreting capability maturity model integration for service organizations, technical note CMU\/SEI-2003-TN-005. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University."},{"key":"5_CR30_5","unstructured":"ISO. 2002. Information technology \u2013 Systems security engineering-capability maturity model (SSE-CMM\u00ae), ISO\/IEC 21827, 2002."},{"key":"5_CR31_5","unstructured":"ISSEA. 2003. Systems security engineering capability maturity model SSE-CMM, June 2003."},{"key":"5_CR32_5","volume-title":"Approaches to knowledge representation","author":"M Jackman","year":"1989","unstructured":"Jackman, M., and C. Pavelin. 1989. Conceptual graphs. In Approaches to knowledge representation, ed. G.A. Ringland, and D.A. Duce. New York: Wiley."},{"key":"5_CR33_5","volume-title":"The unified software development process","author":"I Jacobson","year":"1999","unstructured":"Jacobson, I., G. Booch, and J. Rumbaugh. 1999. The unified software development process, 2nd ed. Reading, MA: Addison Wesley.","edition":"2"},{"key":"5_CR34_5","volume-title":"Systems analysis and design","author":"KE Kendall","year":"2001","unstructured":"Kendall, K.E., and J.E. Kendall. 2001. Systems analysis and design, 5th ed. Englewood Cliffs, NJ: Prentice-Hall.","edition":"5"},{"issue":"2","key":"5_CR35_5","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1111\/j.1540-5915.1997.tb01312.x","volume":"20","author":"WR King","year":"1997","unstructured":"King, W.R., and T.S.H. Teo. 1997. Integration between business planning and information systems planning: Validating a stage hypothesis. Decision Sciences 20(2): 279\u2013308.","journal-title":"Decision Sciences"},{"issue":"2","key":"5_CR36_5","doi-asserted-by":"publisher","first-page":"105","DOI":"10.1109\/TPC.2003.813164","volume":"46","author":"N Kock","year":"2003","unstructured":"Kock, N. 2003. Action research: Lessons learned from a multi-iteration study of computer-mediated communication in groups. IEEE Transactions on Professional Communication 46(2): 105\u2013128.","journal-title":"IEEE Transactions on Professional Communication"},{"key":"5_CR37_5","doi-asserted-by":"crossref","first-page":"605","DOI":"10.4018\/978-1-59140-573-3.ch079","volume-title":"Encyclopedia of knowledge management","author":"U Kulkarni","year":"2006","unstructured":"Kulkarni, U., and R. Freeze. 2006. Measuring knowledge management capabilities. In Encyclopedia of knowledge management, ed. D.G. Schwartz, 605\u2013613. Hershey, PA: Idea Group Publishing."},{"issue":"5","key":"5_CR38_5","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1177\/001872677803100503","volume":"31","author":"D Lavoie","year":"1978","unstructured":"Lavoie, D., and S.A. Culbert. 1978. Stages in organization and development. Human Relations 31(5): 417\u2013438.","journal-title":"Human Relations"},{"key":"5_CR39_5","first-page":"163","volume-title":"Knowledge management: An evolutionary view","author":"J Liebowitz","year":"2008","unstructured":"Liebowitz, J., and T. Beckman. 2008. Moving toward a knowledge management maturity model (K3M) for developing knowledge management strategy and implementation plans. In Knowledge management: An evolutionary view, ed. I. Becerra-Fernandez, and D. Leidner, 163\u2013179. Armonk, NY: M.E. Sharpe."},{"issue":"5","key":"5_CR40_5","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1108\/13673270310505449","volume":"5","author":"M Lindvall","year":"2003","unstructured":"Lindvall, M., L. Rus, and S.S. Sinha. 2003. Software systems support for knowledge management. Journal of Knowledge Management 5(5): 137\u2013150.","journal-title":"Journal of Knowledge Management"},{"key":"5_CR41_5","first-page":"577","volume-title":"Handbook of knowledge management","author":"Y Malhotra","year":"2002","unstructured":"Malhotra, Y. 2002. Why knowledge management systems fail? Enablers and constraints of knowledge management in human enterprises. In Handbook of knowledge management, ed. C.W. Holsapple, 577\u2013599. Heidelberg: Springer."},{"key":"5_CR42_5","series-title":"Proceedings of the 2003 international ACM SIGGROUP conference on supporting group work","first-page":"50","volume-title":"Introducing chat into business organizations: Toward an instant messaging maturity model","author":"MJ Muller","year":"2003","unstructured":"Muller, M.J., M.E. Raven, S. Kogan, D.R. Millen, and K. Carey. 2003. Introducing chat into business organizations: Toward an instant messaging maturity model, 50\u201357., Proceedings of the 2003 international ACM SIGGROUP conference on supporting group work Sanibel Island, FL: ACM."},{"issue":"1","key":"5_CR43_5","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1108\/09593840110384753","volume":"14","author":"E Mumford","year":"2001","unstructured":"Mumford, E. 2001. Advise for an action researcher. Information Technology & People 14(1): 12\u201327.","journal-title":"Information Technology & People"},{"issue":"2","key":"5_CR44_5","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1016\/j.jss.2003.10.017","volume":"74","author":"M Niazi","year":"2005","unstructured":"Niazi, M., D. Wilson, and D. Zowghi. 2005. A maturity model for the implementation of software process improvement: An empirical study. Journal of Systems and Software 74(2): 155\u2013172.","journal-title":"Journal of Systems and Software"},{"key":"5_CR45_5","volume-title":"The IT service capability maturity model, CMM Release L2+3\u20130.3","author":"F Niessink","year":"2002","unstructured":"Niessink, F., V. Clerc, T. Tijdinkm, and H. van Vliet. 2002. The IT service capability maturity model, CMM Release L2+3\u20130.3. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University."},{"key":"5_CR46_5","volume-title":"Object oriented systems analysis and design","author":"RJ Norman","year":"1996","unstructured":"Norman, R.J. 1996. Object oriented systems analysis and design. Upper Saddle River, NJ: Prentice-Hall."},{"key":"5_CR47_5","volume-title":"The capability maturity model: Guidelines for improving the software process","author":"MC Paulk","year":"1995","unstructured":"Paulk, M.C., Chrissis M.B., Weber, C.V., 1993. Capability maturity model for software, Version 1.1, Software Engineering Institute, CMU\/SEI-93-TR-24."},{"key":"5_CR48_5","volume-title":"The capability maturity model: Guidelines for improving the software process","author":"MC Paulk","year":"1995","unstructured":"Paulk, M.C., C.V. Weber, B. Curtis, and M.B. Chrissis. 1995. The capability maturity model: Guidelines for improving the software process. Boston, MA: Addison Wesley."},{"issue":"50","key":"5_CR49_5","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1007\/BF02504960","volume":"1","author":"JL Plass","year":"2002","unstructured":"Plass, J.L., and L.W. Salisbury. 2002. A living-systems design model for Web-based knowledge management systems. Educational Technology Research and Development 1(50): 35\u201358.","journal-title":"Educational Technology Research and Development"},{"key":"5_CR50_5","volume-title":"Software engineering: A practitioner\u2019s approach","author":"RS Pressman","year":"2000","unstructured":"Pressman, R.S. 2000. Software engineering: A practitioner\u2019s approach, 5th ed. Boston, MA: McGraw-Hill.","edition":"5"},{"issue":"4","key":"5_CR51_5","doi-asserted-by":"publisher","first-page":"582","DOI":"10.2307\/2392581","volume":"23","author":"GI Susman","year":"1978","unstructured":"Susman, G.I., and R.D. Evered. 1978. An assessment of the scientific merits of action research. Administrative Science Quarterly 23(4): 582\u2013603.","journal-title":"Administrative Science Quarterly"},{"key":"5_CR52_5","doi-asserted-by":"crossref","first-page":"259","DOI":"10.4018\/978-1-59140-573-3.ch034","volume-title":"Encyclopedia of knowledge management","author":"D Tauber","year":"2006","unstructured":"Tauber, D., and D.G. Schwartz. 2006. Integrating knowledge management with the systems analysis process. In Encyclopedia of knowledge management, ed. D.G. Schwartz, 259\u2013266. Hershey, PA: Idea Group Publishing."},{"issue":"1","key":"5_CR53_5","doi-asserted-by":"crossref","first-page":"16","DOI":"10.1201\/1078\/43189.16.4.19990901\/31199.3","volume":"16","author":"EF Vail","year":"1999","unstructured":"Vail, E.F. 1999. Knowledge mapping: Getting started with knowledge management. Information Systems Management 16(1): 16\u201323.","journal-title":"Information Systems Management"},{"key":"5_CR54_5","volume-title":"System analysis and design methods","author":"JL Whitten","year":"2001","unstructured":"Whitten, J.L., L.D. Bentley, and K.C. Dittman. 2001. System analysis and design methods. Boston, MA: McGraw-Hill."},{"key":"5_CR55_5","volume-title":"Case study research: Design and methods","author":"R Yin","year":"1994","unstructured":"Yin, R. 1994. Case study research: Design and methods, 2nd ed. Beverly Hills, CA: Sage.","edition":"2"},{"key":"5_CR56_5","volume-title":"Modern structured analysis","author":"E Yourdon","year":"1989","unstructured":"Yourdon, E. 1989. Modern structured analysis. Englewood Cliffs, NJ: Prentice-Hall."}],"container-title":["Annals of Information Systems","Knowledge Management and Organizational Learning"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-1-4419-0011-1_5.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,10]],"date-time":"2025-02-10T03:27:44Z","timestamp":1739158064000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-1-4419-0011-1_5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9781441900074","9781441900111"],"references-count":56,"URL":"https:\/\/doi.org\/10.1007\/978-1-4419-0011-1_5","relation":{},"ISSN":["1934-3221","1934-3213"],"issn-type":[{"type":"print","value":"1934-3221"},{"type":"electronic","value":"1934-3213"}],"subject":[],"published":{"date-parts":[[2009]]}}}