{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T04:25:46Z","timestamp":1725596746824},"publisher-location":"London","reference-count":7,"publisher":"Springer London","isbn-type":[{"type":"print","value":"9783540761082"},{"type":"electronic","value":"9781447106012"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1998]]},"DOI":"10.1007\/978-1-4471-0601-2_6","type":"book-chapter","created":{"date-parts":[[2011,7,19]],"date-time":"2011-07-19T02:11:14Z","timestamp":1311041474000},"page":"49-57","source":"Crossref","is-referenced-by-count":0,"title":["The Simulation of Taiwan\u2019s Power Generation System"],"prefix":"10.1007","author":[{"given":"Alfred D.","family":"Vella","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chuing-Yao","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"6_CR1","doi-asserted-by":"publisher","first-page":"1061","DOI":"10.1080\/00036849400000122","volume":"26","author":"CY Chen","year":"1994","unstructured":"Chen, C-Y & Vella, AD (1994) Estimating the economic costs of electricity shortages using input-output analysis: the case of Taiwan. Applied Economics, 26:1061\u20131069.","journal-title":"Applied Economics"},{"key":"6_CR2","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1109\/CJECE.1988.6593009","volume":"13","author":"Z Elrazaz","year":"1988","unstructured":"Elrazaz, Z. (1988) Long range forecasting for utilities with dynamic load growth rates. Canadian journal of Electrical and Computer Engineering, 13:127\u2013131.","journal-title":"Canadian journal of Electrical and Computer Engineering"},{"key":"6_CR3","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/0142-0615(83)90003-0","volume":"5","author":"G Hamound","year":"1983","unstructured":"Hamound, G & Billington, R (1983) Parameter uncertainty in generating capacity reliability evaluation. Electrical Power and Energy Systems, 5:149\u2013158.","journal-title":"Electrical Power and Energy Systems"},{"key":"6_CR4","volume-title":"Input-Output Economics","author":"W Leontief","year":"1966","unstructured":"Leontief, W (1966) Input-Output Economics. New York: Oxford University Press."},{"key":"6_CR5","unstructured":"Manikki, P (1991) Electric power capacity planning under uncertain conditions. Third International Conference on Probabilistic Methods Applied to Electric Power Systems. London, 3-5 July 1991: 214\u2013219."},{"key":"6_CR6","volume-title":"Electric Power Economics \u2014 Selected Works","author":"M Munasinghe","year":"1990","unstructured":"Munasinghe, M (1990) Electric Power Economics \u2014 Selected Works. Oxford: Butterworths."},{"key":"6_CR7","first-page":"85","volume":"2","author":"WB Shew","year":"1997","unstructured":"Shew, WB (1997) Costs of inadequate capacity in the electric utility industry. Energy Systems and Policy, 2:85\u2013110.","journal-title":"Energy Systems and Policy"}],"container-title":["Modelling for Added Value"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-1-4471-0601-2_6.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,1]],"date-time":"2021-05-01T00:29:06Z","timestamp":1619828946000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-1-4471-0601-2_6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998]]},"ISBN":["9783540761082","9781447106012"],"references-count":7,"URL":"https:\/\/doi.org\/10.1007\/978-1-4471-0601-2_6","relation":{},"subject":[],"published":{"date-parts":[[1998]]}}}