{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T10:02:02Z","timestamp":1742983322909,"version":"3.40.3"},"publisher-location":"London","reference-count":16,"publisher":"Springer London","isbn-type":[{"type":"print","value":"9781447144250"},{"type":"electronic","value":"9781447144267"}],"license":[{"start":{"date-parts":[[2012,8,10]],"date-time":"2012-08-10T00:00:00Z","timestamp":1344556800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2012,8,10]],"date-time":"2012-08-10T00:00:00Z","timestamp":1344556800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-1-4471-4426-7_71","type":"book-chapter","created":{"date-parts":[[2012,8,9]],"date-time":"2012-08-09T15:52:35Z","timestamp":1344527555000},"page":"837-848","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Concurrent Process Planning and Scheduling Applied Into Production of Turned Parts"],"prefix":"10.1007","author":[{"given":"Jo\u017ee","family":"Tav\u010dar","sequence":"first","affiliation":[]},{"given":"Ale\u0161","family":"Slak","sequence":"additional","affiliation":[]},{"given":"Jo\u017ee","family":"Duhovnik","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,8,10]]},"reference":[{"key":"71_CR1","doi-asserted-by":"crossref","unstructured":"Alting L, Zhang H C (1989) Computer aided Process Planning: the state-of-the-art Survey. International Journal of Production Research, vol. 27, no. 4, p. 553-585","DOI":"10.1080\/00207548908942569"},{"key":"71_CR2","doi-asserted-by":"crossref","unstructured":"Cheng R, Gen M, Tsujimura Y (1996) A tutorial survey of job-shop scheduling problems using genetic algorithms\u2013I: representation. Computers and Industrial Engineering, vol. 30, no. 4, p. 983-997.","DOI":"10.1016\/0360-8352(96)00047-2"},{"key":"71_CR3","doi-asserted-by":"crossref","unstructured":"DUHOVNIK, Jo\u017ee, TAV\u010cAR, Jo\u017ee (1999) Concurrent engineering in real and virtual toolproduction. Concurr. eng. res. appl., vol. 7, no. 1, p. 67-79.","DOI":"10.1177\/1063293X9900700107"},{"key":"71_CR4","doi-asserted-by":"crossref","unstructured":"DUHOVNIK, Jo\u017ee, KU\u0160AR, Janez, TOMA\u017dEVI\u010c, Rok, STARBEK (2006)Marko. Development process with regard to customer requirements. Concurr. eng. res. appl., vol. 14, no. 1, p. 67-82.","DOI":"10.1177\/1063293X06064149"},{"key":"71_CR5","doi-asserted-by":"crossref","unstructured":"DUHOVNIK, Jo\u017ee, \u017dARGI, Urban, KU\u0160AR, Janez, STARBEK, Marko (2009) Project-driven concurrent product development. Concurr. eng. res. appl., vol. 17, no 3, p. 225-236","DOI":"10.1177\/1063293X09343823"},{"key":"71_CR6","doi-asserted-by":"crossref","unstructured":"Gao L, Shao X, Li,X, Zhang C (2009) Integration of process planning and scheduling \u2013 A modified genetic algorithm-based approach. Computers & Operation Research, vol. 36, no. 6, p. 2082-2096.","DOI":"10.1016\/j.cor.2008.07.006"},{"key":"71_CR7","doi-asserted-by":"crossref","unstructured":"Kimms A (1999) A genetic algorithm for multi-level, multi-machine lot sizing and scheduling. Computers & Operations Research, vol. 26, no. 8, p. 829-848.","DOI":"10.1016\/S0305-0548(98)00089-6"},{"key":"71_CR8","doi-asserted-by":"crossref","unstructured":"Kumar M, Rajotia S (2003) Integration of scheduling with computer aided process planning. Journal of Materials Processing Technology, vol. 138, no. 1-3, p. 297-300.","DOI":"10.1016\/S0924-0136(03)00088-8"},{"key":"71_CR9","doi-asserted-by":"crossref","unstructured":"Larsen N E (1993) Methods for integration of process planning and production planning. International Journal of Computer Integrated Manufacturing, vol. 6, no. 1-2, p. 152\u2013162.","DOI":"10.1080\/09511929308944565"},{"key":"71_CR10","doi-asserted-by":"crossref","unstructured":"Lee H, Kim S\u2013S (2001) Integration of Process Planning and Scheduling Using Simulation Based genetic Algorithms. The International Journal of Advanced Manufacturing Technology, vol. 18, no. 8, p. 586-590.","DOI":"10.1007\/s001700170035"},{"key":"71_CR11","doi-asserted-by":"crossref","unstructured":"Li X, Gao L, Shao X, Zhang C, Wang C (2010) Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling. Computers and Operations Research, vol. 37, no. 4, p. 656-667.","DOI":"10.1016\/j.cor.2009.06.008"},{"key":"71_CR12","doi-asserted-by":"crossref","unstructured":"Park B J, Choi H R (2006) A genetic algorithm for integration of process planning and scheduling in a job shop. AI2006: Advances in Artificial Intelligence, p. 647-657. ISBN 978-3-540-49787-5.","DOI":"10.1007\/11941439_69"},{"key":"71_CR13","doi-asserted-by":"crossref","unstructured":"Tan W, Khoshnevis B (2000) Integration of process planning and scheduling \u2013 a review. Journal of Intelligent Manufacturing, vol. 11, no. 1, p. 51-63.","DOI":"10.1023\/A:1008952024606"},{"key":"71_CR14","doi-asserted-by":"crossref","unstructured":"Usher J\u00a0M, Fernandes K\u00a0J (1996) Dynamic Process Planning \u2013 The Static Phase. Journal of Materials Processing Technology, vol. 61, no. 1, p. 53-58.","DOI":"10.1016\/0924-0136(96)02465-X"},{"key":"71_CR15","doi-asserted-by":"crossref","unstructured":"Valente J\u00a0+\u00a0M S, Goncalves J\u00a0+\u00a0F (2009) A genetic algorithm approach for the single machine scheduling problem with linear earliness and quadratic tardiness penalties. Computers and Operations Research, vol. 36, no. 10, p. 2707-2715.","DOI":"10.1016\/j.cor.2008.11.016"},{"key":"71_CR16","doi-asserted-by":"crossref","unstructured":"Yan H-S, Zhang, X-D (2007), A case study on Integrated Production planning and scheduling in a three-stage manufacturing system. IEEE Transactions on automation science and engineering, vol. 4, no. 1, p. 86-92.","DOI":"10.1109\/TASE.2006.872107"}],"container-title":["Concurrent Engineering Approaches for Sustainable Product Development in a Multi-Disciplinary Environment"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-1-4471-4426-7_71","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,30]],"date-time":"2023-01-30T17:14:13Z","timestamp":1675098853000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-1-4471-4426-7_71"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,8,10]]},"ISBN":["9781447144250","9781447144267"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/978-1-4471-4426-7_71","relation":{},"subject":[],"published":{"date-parts":[[2012,8,10]]},"assertion":[{"value":"10 August 2012","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}