{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T22:11:13Z","timestamp":1743027073745,"version":"3.40.3"},"publisher-location":"London","reference-count":17,"publisher":"Springer London","isbn-type":[{"type":"print","value":"9781447144250"},{"type":"electronic","value":"9781447144267"}],"license":[{"start":{"date-parts":[[2012,8,10]],"date-time":"2012-08-10T00:00:00Z","timestamp":1344556800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2012,8,10]],"date-time":"2012-08-10T00:00:00Z","timestamp":1344556800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-1-4471-4426-7_83","type":"book-chapter","created":{"date-parts":[[2012,8,9]],"date-time":"2012-08-09T15:52:35Z","timestamp":1344527555000},"page":"981-992","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Value Stream Mapping and Process Optimization Strategy: A Case Study of Public Sector Organization"],"prefix":"10.1007","author":[{"given":"Amjed","family":"Javed","sequence":"first","affiliation":[]},{"given":"Irfan Anjum","family":"Manarvi","sequence":"additional","affiliation":[]},{"given":"Syed Zahid Raza","family":"Rizvi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,8,10]]},"reference":[{"key":"83_CR1","doi-asserted-by":"publisher","unstructured":"Teichgraber UK, de Bucourt Maximilian (2011) Applying value stream mapping techniques to eliminate non-value-added waste for the procurement of endovascular stents. Eur. J Radiology. doi:10.1016\/j.ejrad.2010.12.045","DOI":"10.1016\/j.ejrad.2010.12.045"},{"key":"83_CR2","doi-asserted-by":"publisher","unstructured":"C. Paciarotti et al. (2011) Value stream mapping implementation in the third sector. Operation Management Research, doi: 10.1007\/s12063-011-0052-8","DOI":"10.1007\/s12063-011-0052-8"},{"key":"83_CR3","unstructured":"Antoldi F (2003) II governo strategico delle organizzazioni non profit."},{"key":"83_CR4","doi-asserted-by":"publisher","unstructured":"B. Singh et al. (2011) Value stream mapping: literature review and implications for Indian industry. Int J Adv Manuf Technol 53:799\u2013809, doi: 10.1007\/s00170-010-2860-7","DOI":"10.1007\/s00170-010-2860-7"},{"key":"83_CR5","doi-asserted-by":"publisher","unstructured":"Melvin, A. and Baglee (2008) Value Stream Mapping: A Dairy Industry Prospective. 978-1-4244-2289 IEEE, doi: 10.1109\/IEMCE.2008.4618003","DOI":"10.1109\/IEMCE.2008.4618003"},{"key":"83_CR6","doi-asserted-by":"publisher","unstructured":"S.Vinodh et al. (2010) Tools and techniques for enabling sustainability through lean initiatives. Clean Techn Environ Policy (2011) 13:469\u2013479, doi: 10.1007\/s10098-010-0329-x","DOI":"10.1007\/s10098-010-0329-x"},{"key":"83_CR7","doi-asserted-by":"publisher","unstructured":"P. Kuhlang et al. (2011) Methodical approach to increase productivity and reduce lead time in assembly and production-logistic processes. CIRP J of Manf Science and Tech, doi:10.1016\/j.cirpj.2011.02.001","DOI":"10.1016\/j.cirpj.2011.02.001"},{"key":"83_CR8","doi-asserted-by":"publisher","first-page":"1091","DOI":"10.1007\/s00170-010-2788-y","volume":"52","author":"M. Eswaramoorthi","year":"2010","unstructured":"M. Eswaramoorthi et al. (2010) A survey on lean practices in Indian machine tool industries. Int J Adv Manuf Technol (2011) 52:1091\u20131101, doi: 10.1007\/s00170-010-2788-y","journal-title":"Int J Adv Manuf Technol"},{"key":"83_CR9","doi-asserted-by":"crossref","unstructured":"Fawaz A. Abdulmaleka and Jayant Rajgopal (2007) Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study. Int. J. Production Economics 107 (2007) 223\u2013236","DOI":"10.1016\/j.ijpe.2006.09.009"},{"key":"83_CR10","doi-asserted-by":"publisher","unstructured":"B. Stump and F. Badurdeen (2009) Integrating lean and other strategies for mass customization manufacturing: a case study. J Intell Manuf, doi: 10.1007\/s10845-009-0289-3","DOI":"10.1007\/s10845-009-0289-3"},{"key":"83_CR11","doi-asserted-by":"publisher","unstructured":"L. M. F. Cabral Sacadura and A.M.B. Ramos Tenera (2011) Integrating Value and Lean Management in Manufacturing Processes. IEEE, doi: 10.1109\/ICMSS.2011.5999337","DOI":"10.1109\/ICMSS.2011.5999337"},{"key":"83_CR12","doi-asserted-by":"publisher","unstructured":"B.J. Hicks (2007) Lean information management: Understanding and eliminating waste. Int. J. of Information Management 27 (2007) 233\u2013249, doi:10.1016\/j.ijinfomgt.2006.12.001","DOI":"10.1016\/j.ijinfomgt.2006.12.001"},{"key":"83_CR13","doi-asserted-by":"publisher","unstructured":"P. Schwarz et al. (2011) Lean processes for optimizing OR capacity utilization: prospective analysis before and after implementation of value stream mapping (VSM). Langenbecks Arch of Surg (2011) 396:1047\u20131053, doi: 10.1007\/s00423-011-0833-4","DOI":"10.1007\/s00423-011-0833-4"},{"key":"83_CR14","doi-asserted-by":"publisher","unstructured":"Trappey et al. (2011) Re-engineering Transformer Maintenance Processes to Improve Customized Service Delivery. J Syst Sci Syst Eng, doi: 10.1007\/s11518-011-5172-z","DOI":"10.1007\/s11518-011-5172-z"},{"key":"83_CR15","doi-asserted-by":"publisher","unstructured":"F. Giudice et al. (2009) FEA Integrated Approach \u2014 A Concurrent Design Method Based on DFMA. CERA 2009 17(3) 183-202, doi: 10.1177\/1063293X09343337","DOI":"10.1177\/1063293X09343337"},{"key":"83_CR16","doi-asserted-by":"publisher","unstructured":"Y.-T. Ko et al. (2011) A Problem-Oriented Design Method for Product Innovation. CERA 2011 19(4): 335-344, doi: 10.1177\/1063293X11425091","DOI":"10.1177\/1063293X11425091"},{"key":"83_CR17","doi-asserted-by":"publisher","unstructured":"Hong-Zhong Huang et al. (2011) Collaborative Reliability Analysis under the Environment of Multidisciplinary Design Optimization. CERA 2011 19(3):245-254, doi: 10.1177\/1063293X11420177","DOI":"10.1177\/1063293X11420177"}],"container-title":["Concurrent Engineering Approaches for Sustainable Product Development in a Multi-Disciplinary Environment"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-1-4471-4426-7_83","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,12]],"date-time":"2023-02-12T00:36:21Z","timestamp":1676162181000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-1-4471-4426-7_83"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,8,10]]},"ISBN":["9781447144250","9781447144267"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-1-4471-4426-7_83","relation":{},"subject":[],"published":{"date-parts":[[2012,8,10]]},"assertion":[{"value":"10 August 2012","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}