{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T08:51:57Z","timestamp":1743065517120,"version":"3.40.3"},"publisher-location":"London","reference-count":11,"publisher":"Springer London","isbn-type":[{"type":"electronic","value":"9781447151029"}],"license":[{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-1-4471-5102-9_255-1","type":"book-chapter","created":{"date-parts":[[2014,12,2]],"date-time":"2014-12-02T14:34:34Z","timestamp":1417530874000},"page":"1-7","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Run-to-Run Control in Semiconductor Manufacturing"],"prefix":"10.1007","author":[{"given":"James","family":"Moyne","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,11,5]]},"reference":[{"key":"255-1_CR1","unstructured":"Advanced Process Control (APC) Conference Proceedings (2000\u20132014), titles available at http:\/\/www.apcconference.com"},{"key":"255-1_CR2","volume-title":"Empirical model-building and response surfaces","author":"GEP Box","year":"1987","unstructured":"Box GEP, Draper NR (1987) Empirical model-building and response surfaces. Wiley, New York"},{"key":"255-1_CR3","doi-asserted-by":"crossref","unstructured":"Cheng F-T etal. (2011) Benefit model of virtual metrology and integrating AVM Into MES. IEEE Trans Semicond Manuf 24(2):261\u2013272","DOI":"10.1109\/TSM.2011.2104372"},{"key":"255-1_CR4","unstructured":"Edgar TF, Firth SK, Bode C (2004) Multi-product run-to-run control for high-mix fabs. (session keynote) AEC\/APC Asia, Hsinchu, (2004), (available at http:\/\/140.113.156.45\/files\/reference\/2nd%20AEC-APC%20Symposium%20Asia\/APCAEC\/presentations\/session_KeynoteInvited\/Edgar_Thomas.pdf)"},{"key":"255-1_CR5","unstructured":"International Technology Roadmap for Semiconductors (ITRS), 2014 Edition, Semiconductor Industry Association. Available at http:\/\/www.itrs.net. (See especially \u201cFactory Integration\u201d chapter)"},{"issue":"7","key":"255-1_CR6","doi-asserted-by":"publisher","first-page":"364","DOI":"10.1109\/TSM.2007.907609","volume":"20","author":"A Khan","year":"2007","unstructured":"Khan A, Moyne J, Tilbury D (2007) Fab-wide control utilizing virtual metrology (invited). IEEE Trans Semicond Manuf-Spec Issue on Adv Process Control 20(7):364\u2013375","journal-title":"IEEE Trans Semicond Manuf-Spec Issue on Adv Process Control"},{"issue":"9","key":"255-1_CR7","first-page":"47","volume":"47","author":"J Moyne","year":"2004","unstructured":"Moyne J (2004) The evolution of APC: the move to total factory control (invited). Solid State Technol 47(9):47\u201352","journal-title":"Solid State Technol"},{"issue":"7","key":"255-1_CR8","first-page":"35","volume":"52","author":"J Moyne","year":"2009","unstructured":"Moyne J (2009) A blueprint for enterprise-wide deployment of advanced process control. Solid State Technol 52(7):35\u201337","journal-title":"Solid State Technol"},{"key":"255-1_CR9","doi-asserted-by":"publisher","DOI":"10.1201\/9781420040661","volume-title":"Run-to-run control in semiconductor manufacturing","author":"J Moyne","year":"2000","unstructured":"Moyne J, Del Castillo E, Hurwitz A (2000) Run-to-run control in semiconductor manufacturing. CRC, Boca Raton"},{"issue":"2","key":"255-1_CR10","doi-asserted-by":"publisher","first-page":"221","DOI":"10.1109\/TSM.2010.2041294","volume":"23","author":"J Moyne","year":"2010","unstructured":"Moyne J, Schulze B (2010) Yield management enhanced advanced process control system (YMeAPC): part I, description and case study of feedback for optimized multi-process control. IEEE Trans Semicond Manuf Spec Issue Adv Process Control 23(2):221\u2013235","journal-title":"IEEE Trans Semicond Manuf Spec Issue Adv Process Control"},{"key":"255-1_CR11","unstructured":"Zou J (2013) Method and system for estimating context offsets for run-to-run control in a semiconductor fabrication facility. United States Patent, Patent Number US 8,355,810 B2 (Filed, Jan 2010; Issued, Jan 2013)"}],"container-title":["Encyclopedia of Systems and Control"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-1-4471-5102-9_255-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,20]],"date-time":"2023-02-20T19:35:48Z","timestamp":1676921748000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-1-4471-5102-9_255-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9781447151029"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/978-1-4471-5102-9_255-1","relation":{},"subject":[],"published":{"date-parts":[[2014]]},"assertion":[{"value":"12 October 2014, 21:11:53","order":1,"name":"received","label":"Received","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"12 October 2014, 21:11:53","order":2,"name":"accepted","label":"Accepted","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"5 November 2014","order":3,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}