{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T07:59:35Z","timestamp":1770969575923,"version":"3.50.1"},"publisher-location":"Boston, MA","reference-count":36,"publisher":"Springer US","isbn-type":[{"value":"9781461490555","type":"print"},{"value":"9781461490562","type":"electronic"}],"license":[{"start":{"date-parts":[[2013,12,3]],"date-time":"2013-12-03T00:00:00Z","timestamp":1386028800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2013,12,3]],"date-time":"2013-12-03T00:00:00Z","timestamp":1386028800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-1-4614-9056-2_13","type":"book-chapter","created":{"date-parts":[[2013,12,2]],"date-time":"2013-12-02T16:56:54Z","timestamp":1386003414000},"page":"301-341","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["A Probabilistic Characterization of Allocation Performance in a Worker-Constrained Job Shop"],"prefix":"10.1007","author":[{"given":"Benjamin J.","family":"Lobo","sequence":"first","affiliation":[]},{"given":"T. J.","family":"Thoney","sequence":"additional","affiliation":[]},{"given":"Russell E.","family":"King","sequence":"additional","affiliation":[]},{"given":"James R.","family":"Wilson","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,12,3]]},"reference":[{"issue":"3","key":"13_CR1","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J. Adams","year":"1988","unstructured":"Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391\u2013401.","journal-title":"Management Science"},{"key":"13_CR2","volume-title":"Mathematical Statistics: Basic Ideas and Selected Topics (2nd edn.)","author":"P. J. Bickel","year":"2007","unstructured":"Bickel, P. J., & Doksum, K. A.. (2007). Mathematical Statistics: Basic Ideas and Selected Topics (2nd edn.). Upper Saddle River, Pearson Prentice Hall."},{"key":"13_CR3","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4471-3675-0","volume-title":"An Introduction to Statistical Modeling of Extreme Values","author":"S. Coles","year":"2001","unstructured":"Coles, S. (2001). An Introduction to Statistical Modeling of Extreme Values. Springer, London."},{"issue":"5","key":"13_CR4","doi-asserted-by":"crossref","first-page":"1024","DOI":"10.1287\/opre.33.5.1024","volume":"33","author":"U. Derigs","year":"1985","unstructured":"Derigs, U. (1985). Using confidence limits for the global optimum in combinatorial optimization. Operations Research, 33(5), 1024\u20131049.","journal-title":"Operations Research"},{"issue":"10","key":"13_CR5","doi-asserted-by":"crossref","first-page":"2487","DOI":"10.1080\/00207549308956871","volume":"31","author":"J. Felan","year":"1993","unstructured":"Felan, J., Fry, T., & Philipoom, P. (1993). Labour flexibility and staffing levels in a dual-resource constrained job shop. International Journal of Production Research, 31(10), 2487\u20132506.","journal-title":"International Journal of Production Research"},{"issue":"8","key":"13_CR6","doi-asserted-by":"publisher","first-page":"2077","DOI":"10.1080\/00207549608905015","volume":"34","author":"V. Gargeya","year":"1996","unstructured":"Gargeya, V., Deane, R. (1996). Scheduling research in multiple resource constrained job shops: A review and critique. International Journal of Production Research, 34(8), 2077\u20132097.","journal-title":"International Journal of Production Research"},{"key":"13_CR7","unstructured":"Geer Mountain Software Corp. (2001). Stat::Fit, Version 2. South Kent, Geer Mountain Software Corp."},{"issue":"1","key":"13_CR8","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1002\/nav.3800260108","volume":"26","author":"B. L. Golden","year":"1979","unstructured":"Golden, B. L., & Alt, F. B. (1979). Interval estimation of a global optimum for large combinatorial problems. Naval Research Logistics Quarterly, 26(1), 69\u201377.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"10","key":"13_CR9","doi-asserted-by":"crossref","first-page":"1442","DOI":"10.1287\/mnsc.44.10.1442","volume":"44","author":"T. Hodgson","year":"1998","unstructured":"Hodgson, T., Cormier, D., Weintraub, A., & Zozom, A. (1998). Satisfying due dates in large job shops. Management Science, 44(10), 1442\u20131446.","journal-title":"Management Science"},{"key":"13_CR10","first-page":"177","volume":"32","author":"T. Hodgson","year":"2000","unstructured":"Hodgson, T., King, R., Thoney, K., Stanislaw, N., Weintraub, A., & Zozom, A. (2000). On satisfying due-dates in large job shops: Idle time insertion. IIE Transactions, 32, 177\u2013180.","journal-title":"IIE Transactions"},{"issue":"6-8","key":"13_CR11","doi-asserted-by":"crossref","first-page":"905","DOI":"10.1016\/S0895-7177(04)90561-4","volume":"39","author":"T. Hodgson","year":"2004","unstructured":"Hodgson, T., Melendez, B., Thoney, K., & Trainor, T. (2004). The deployment scheduling analysis tool (DSAT). Mathematical and Computer Modelling, 39(6-8), 905\u2013924.","journal-title":"Mathematical and Computer Modelling"},{"issue":"2","key":"13_CR12","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1016\/S1047-8310(98)90002-5","volume":"9","author":"M. Hottenstein","year":"1998","unstructured":"Hottenstein, M., & Bowman, S. (1998). Cross-training and worker flexibility: A review of DRC system research. The Journal of High Technology Management Research, 9(2), 157\u2013174.","journal-title":"The Journal of High Technology Management Research"},{"issue":"1","key":"13_CR13","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.cie.2010.03.001","volume":"59","author":"M. Jaber","year":"2010","unstructured":"Jaber, M., & Neumann, W. (2010). Modelling worker fatigue and recovery in dual-resource constrained systems. Computers & Industrial Engineering, 59(1), 75\u201384.","journal-title":"Computers & Industrial Engineering"},{"key":"13_CR14","volume-title":"Simulation with Arena 4th edn","author":"W. D. Kelton","year":"2010","unstructured":"Kelton, W. D., Sadowski, R. P., & Swets, N. B.. (2010). Simulation with Arena 4th edn. New York, McGraw-Hill."},{"issue":"5","key":"13_CR15","doi-asserted-by":"crossref","first-page":"592","DOI":"10.1057\/palgrave.jors.2600935","volume":"51","author":"H. Kher","year":"2000","unstructured":"Kher, H. (2000). Examination of flexibility acquisition policies in dual resource constrained job shops with simultaneous worker learning and forgetting effects. The Journal of the Operational Research Society, 51(5), 592\u2013601.","journal-title":"The Journal of the Operational Research Society"},{"issue":"1","key":"13_CR16","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/S0377-2217(98)00190-8","volume":"115","author":"H. Kher","year":"1999","unstructured":"Kher, H., Malhotra, M., Philipoom, P., & Fry, T. (1999). Modeling simultaneous worker learning and forgetting in dual resource constrained systems. European Journal of Operational Research, 115(1), 158\u2013172.","journal-title":"European Journal of Operational Research"},{"key":"13_CR17","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1057\/jos.2009.31","volume":"4","author":"M. Kuhl","year":"2010","unstructured":"Kuhl, M., Ivy, J., Lada, E., Steiger, N., Wagner, M., & Wilson, J. (2010). Univariate input models for stochastic simulation. Journal of Simulation, 4, 81\u201397.","journal-title":"Journal of Simulation"},{"key":"13_CR18","unstructured":"Law, A. M (2007). Simulation Modeling and Analysis. McGraw-Hill, New York, 4th edn."},{"key":"13_CR19","doi-asserted-by":"crossref","unstructured":"Law, A. M. (2011). How the ExpertFit distribution-fitting software can make your simulation models more valid. In Proceedings of the 2011 Winter Simulation Conference, S. Jain, R. R. Creasy, J. Himmelspach, K. P. White, & M. Fu (eds.) Institute of Electrical and Electronics Engineers (pp. 63\u201369). New Jersey, Piscataway.","DOI":"10.1109\/WSC.2011.6147740"},{"key":"13_CR20","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4612-5449-2","volume-title":"Extremes and Related Properties of Random Sequences and Processes","author":"M. R. Leadbetter","year":"1983","unstructured":"Leadbetter, M. R., Lindgren, G., & Rootz\u00e9n, H. (1983). Extremes and Related Properties of Random Sequences and Processes. New York, Springer-Verlag."},{"key":"13_CR21","doi-asserted-by":"crossref","unstructured":"Lenstra, J., & Rinnooy Kan, A. (1979). Computational complexity of discrete optimization problems. In Discrete Optimization I Proceedings of the Advanced Research Institute on Discrete Optimization and Systems Applications of the Systems Science Panel of NATO and of the Discrete Optimization Symposium, P. Hammer, E. Johnson, and B. Korte, eds., Elsevier, vol.\u00a04 of Annals of Discrete Mathematics. 121\u2013140.","DOI":"10.1016\/S0167-5060(08)70821-5"},{"issue":"1","key":"13_CR23","doi-asserted-by":"crossref","first-page":"328","DOI":"10.1016\/j.cor.2012.07.003","volume":"40","author":"B. Lobo","year":"2013a","unstructured":"Lobo, B., Hodgson, T., King, R., Thoney, K., & Wilson, J. (2013a). An effective lower bound on \n$L\\rm \\max$\n in a worker-constrained job shop. Computers & Operations Research, 40(1), 328\u2013343.","journal-title":"Computers & Operations Research"},{"issue":"10","key":"13_CR24","doi-asserted-by":"crossref","first-page":"2569","DOI":"10.1016\/j.cor.2013.02.008","volume":"40","author":"B. Lobo","year":"2013b","unstructured":"Lobo, B., Hodgson, T., King, R., Thoney, K., & Wilson, J. (2013b). Allocating job-shop manpower to minimize \n$L\\rm \\max$\n in a job shop: Optimality criteria, search heuristics, and probabilistic quality metrics. Computers & Operations Research, 40(10), 2569\u20132584.","journal-title":"Computers & Operations Research"},{"key":"13_CR25","doi-asserted-by":"crossref","unstructured":"Lobo, B., Wilson, J., Thoney, K., Hodgson, T., & King, R. (2013c). A practical method for evaluating worker-allocations in large-scale dual resource constrained job shops. http:\/\/people.engr.ncsu.edu\/bjlobo\/papers\/loboetal_paper4.pdf.","DOI":"10.1080\/0740817X.2014.892231"},{"issue":"3","key":"13_CR26","doi-asserted-by":"publisher","first-page":"641","DOI":"10.1111\/j.1540-5915.1993.tb01296.x","volume":"24","author":"M. Malhotra","year":"1993","unstructured":"Malhotra, M., Fry, T., Kher, H., & Donohue, J. (1993). The impact of learning and labor attrition on worker flexibility in dual resource constrained job shops. Decision Sciences, 24(3), 641\u2013664.","journal-title":"Decision Sciences"},{"issue":"9","key":"13_CR27","doi-asserted-by":"crossref","first-page":"648","DOI":"10.1287\/mnsc.13.9.648","volume":"13","author":"R. Nelson","year":"1967","unstructured":"Nelson, R. (1967). Labor and machine limited production systems. Management Science, 13(9), 648\u2013671.","journal-title":"Management Science"},{"issue":"10","key":"13_CR28","doi-asserted-by":"crossref","first-page":"1192","DOI":"10.1145\/63039.63042","volume":"31","author":"S Park","year":"1988","unstructured":"Park, S., & Miller K (1988) Random number generators: good ones are hard to find. Communications of the ACM, 31(10), 1192\u20131201.","journal-title":"Communications of the ACM"},{"key":"13_CR29","doi-asserted-by":"crossref","unstructured":"Pinedo, M. (2012). Scheduling: Theory, Algorithms, and Systems, (4th edn). Springer","DOI":"10.1007\/978-1-4614-2361-4"},{"issue":"23","key":"13_CR30","doi-asserted-by":"crossref","first-page":"4893","DOI":"10.1080\/00207540410001721754","volume":"42","author":"S. Schultz","year":"2004","unstructured":"Schultz, S., Hodgson, T., King, R., & Thoney, K. (2004). Minimizing \n$L\\rm \\max$\n for large-scale, job-shop scheduling problems. International Journal of Production Research, 42(23), 4893\u20134907.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"13_CR31","doi-asserted-by":"crossref","first-page":"605","DOI":"10.1093\/biomet\/66.3.605","volume":"66","author":"D. Scott","year":"1979","unstructured":"Scott, D. (1979). On optimal and data-based histograms. Biometrika, 66(3), 605\u2013610.","journal-title":"Biometrika"},{"issue":"9","key":"13_CR32","first-page":"803","volume":"34","author":"K. Thoney","year":"2002","unstructured":"Thoney, K., Hodgson, T., King, R., Taner, M., & Wilson, A. (2002). Satisfying due-dates in large multi-factory supply chains. IIE Transactions, 34(9), 803\u2013811.","journal-title":"IIE Transactions"},{"issue":"3","key":"13_CR33","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1080\/07408178908966233","volume":"21","author":"M. Treleven","year":"1989","unstructured":"Treleven, M. (1989). A review of the dual resource constrained system research. IIE Transactions, 21(3), 279\u2013287.","journal-title":"IIE Transactions"},{"issue":"1","key":"13_CR34","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/0272-6963(85)90035-X","volume":"6","author":"M Treleven","year":"1985","unstructured":"Treleven M, & Elvers D. (1985). An investigation of labor assignment rules in a dual-constrained job shop. Journal of Operations Management, 6(1), 51\u201368.","journal-title":"Journal of Operations Management"},{"issue":"11","key":"13_CR35","first-page":"1093","volume":"31","author":"A. Weintraub","year":"1999","unstructured":"Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J., & Zozom, A. (1999). Scheduling with alternatives: a link between process planning and scheduling. IIE Transactions, 31(11), 1093\u20131102.","journal-title":"IIE Transactions"},{"key":"13_CR36","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1016\/S0377-2217(02)00910-4","volume":"155","author":"A. D. Wilson","year":"2004","unstructured":"Wilson, A. D., King, R. E., & Wilson, J. R. (2004). Case study on statistically estimating minimum makespan for flow line scheduling problems. European Journal of Operational Research, 155, 439\u2013454.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"13_CR37","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1080\/00207540210162992","volume":"41","author":"A. Zozom","year":"2003","unstructured":"Zozom, A., Hodgson, T., King, R., Weintraub, A., & Cormier, D. (2003). Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates. International Journal of Production Research, 41(1), 31\u201345.","journal-title":"International Journal of Production Research"}],"container-title":["International Series in Operations Research &amp; Management Science","Essays in Production, Project Planning and Scheduling"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-1-4614-9056-2_13","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,19]],"date-time":"2023-02-19T20:02:33Z","timestamp":1676836953000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-1-4614-9056-2_13"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,12,3]]},"ISBN":["9781461490555","9781461490562"],"references-count":36,"URL":"https:\/\/doi.org\/10.1007\/978-1-4614-9056-2_13","relation":{},"ISSN":["0884-8289","2214-7934"],"issn-type":[{"value":"0884-8289","type":"print"},{"value":"2214-7934","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,12,3]]},"assertion":[{"value":"3 December 2013","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}