{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,15]],"date-time":"2025-10-15T00:40:43Z","timestamp":1760488843203,"version":"3.41.0"},"publisher-location":"Cham","reference-count":13,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030005597"},{"type":"electronic","value":"9783030005603"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-030-00560-3_26","type":"book-chapter","created":{"date-parts":[[2018,9,11]],"date-time":"2018-09-11T03:43:32Z","timestamp":1536637412000},"page":"192-199","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Collaborative Tool for the Construction Site to Enhance Lean Project Delivery"],"prefix":"10.1007","author":[{"given":"Julia","family":"Ratajczak","sequence":"first","affiliation":[]},{"given":"Christoph Paul","family":"Schimanski","sequence":"additional","affiliation":[]},{"given":"Carmen","family":"Marcher","sequence":"additional","affiliation":[]},{"given":"Michael","family":"Riedl","sequence":"additional","affiliation":[]},{"given":"Dominik T.","family":"Matt","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,9,12]]},"reference":[{"key":"26_CR1","volume-title":"Managing Risks in Projects","author":"JD Frame","year":"1997","unstructured":"Frame, J.D.: Establishing project risk assessment teams. In: Kahkonen, K., Artto, K.A. (eds.) Managing Risks in Projects. E & FN Spon, London (1997)"},{"key":"26_CR2","unstructured":"Memon, A.H., Rahman, I.A., Aziz, A.A.A.: The cause factors of large project\u2019s cost overrun: a survey in the southern part of peninsular Malaysia. Int. J. Real Estate Stud. 7(2) (2012)"},{"key":"26_CR3","unstructured":"McCulloch, B.: Automating field data collection in construction organizations. In: Construction Congress V: Managing Engineered Construction in Expanding Global Markets, pp. 957\u2013963 (1997)"},{"key":"26_CR4","unstructured":"Golparvar Fard, M.: Assessment of collaborative decision-making in design development and coordination meetings. Master thesis dissertation, University of British Columbia Library, Vancouver, Canada (2006)"},{"key":"26_CR5","unstructured":"Lee, S., Pena-Mora, F.: Visualization of construction progress monitoring. In: Joint International Conference on Computing and Decision Making in Civil and Building Engineering, pp. 2527\u20132533 (2006)"},{"key":"26_CR6","unstructured":"IBC: Industry Benchmarking Consortium: Project Control Best Practice Study by IPA \u2013 Independent Project Analysis (2000)"},{"key":"26_CR7","unstructured":"IBC: Industry Benchmarking Consortium: Cost Engineering Committee (CEC) (1999)"},{"key":"26_CR8","unstructured":"Yates, J.K., Epstein, A.: Avoiding and minimizing construction delay claim disputes in relational contracting (2005). (In: Yeomans, S. (ed.): ICT Enabled Collaborative Working Methodologies in Construction. EngD thesis, Loughborough University, UK (2006))"},{"issue":"1\u20133","key":"26_CR9","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1504\/IJAHUC.2014.059902","volume":"15","author":"S Sendra","year":"2014","unstructured":"Sendra, S., Lloret, A.T., Lloret, J., Rodrigues, J.J.P.C.: A wireless sensor networks deployment to detect the degeneration of cement used in construction. Int. J. Ad Hoc Ubiquitous Comput. 15(1\u20133), 147\u2013160 (2014)","journal-title":"Int. J. Ad Hoc Ubiquitous Comput."},{"key":"26_CR10","doi-asserted-by":"crossref","unstructured":"Sepp\u00e4nen, O., Ballard, G., Pesonen, S.: The combination of last planner system and location-based management system. Lean Constr. J. 43\u201354 (2010)","DOI":"10.60164\/87i4g2d4i"},{"key":"26_CR11","doi-asserted-by":"crossref","unstructured":"Ratajczak, J., et al.: Digital Tools for the construction site. a case study: ACCEPT project. In: LC32017: Volume I \u2013 Proceedings of the Joint Conference on Computing in Construction (JC3), Heraklion, Greece, pp. 981\u2013988 (2017)","DOI":"10.24928\/JC3-2017\/0034"},{"key":"26_CR12","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1007\/978-3-319-66805-5_26","volume-title":"Cooperative Design, Visualization, and Engineering","author":"J Ratajczak","year":"2017","unstructured":"Ratajczak, J., Schimanski, C.P., Marcher, C., Riedl, M., Matt, D.T.: Mobile application for collaborative scheduling and monitoring of construction works according to lean construction methods. In: Luo, Y. (ed.) CDVE 2017. LNCS, vol. 10451, pp. 207\u2013214. Springer, Cham (2017). https:\/\/doi.org\/10.1007\/978-3-319-66805-5_26"},{"key":"26_CR13","unstructured":"Dallasega, P., Matt, D.T., Krause, D.: Design of the building execution process in SME construction networks. In: Thompson, K. (ed.) Proceedings of the 2nd International Workshop on Design in Civil and Environmental Engineering, Worcester, UK, pp. 7\u201315 (2013)"}],"container-title":["Lecture Notes in Computer Science","Cooperative Design, Visualization, and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-00560-3_26","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,7]],"date-time":"2025-07-07T01:53:49Z","timestamp":1751853229000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-00560-3_26"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783030005597","9783030005603"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-00560-3_26","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2018]]}}}