{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,26]],"date-time":"2026-01-26T15:45:16Z","timestamp":1769442316747,"version":"3.49.0"},"publisher-location":"Cham","reference-count":99,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030009786","type":"print"},{"value":"9783030009793","type":"electronic"}],"license":[{"start":{"date-parts":[[2018,9,28]],"date-time":"2018-09-28T00:00:00Z","timestamp":1538092800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-00979-3_57","type":"book-chapter","created":{"date-parts":[[2018,9,27]],"date-time":"2018-09-27T12:55:41Z","timestamp":1538052941000},"page":"539-546","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Modeling and Optimization of Flexible Manufacturing Systems: A Stochastic Approach"],"prefix":"10.1007","author":[{"given":"Gilberto P\u00e9rez","family":"Lechuga","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Francisco Mart\u00ednez","family":"S\u00e1nchez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,9,28]]},"reference":[{"issue":"2","key":"57_CR1","doi-asserted-by":"crossref","first-page":"414","DOI":"10.1016\/j.ejor.2007.09.023","volume":"192","author":"Steve Ah kioon","year":"2009","unstructured":"Ah-kioon, S., Bulgak, A.A., Bektas, T.: Integrated cellular manufacturing systems design with production planning and dynamic system reconfiguration. Eur. J. od Oper. Res. 192(2), 414\u2013428 (2009)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"57_CR2","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.cie.2004.06.008","volume":"48","author":"Zahir Albadawi","year":"2005","unstructured":"Albadawi, Z., Bashir, H.A., Chen, M.: A mathematical approach for the formation of manufacturing cells. Comput. Ind. Eng. 48(1) (2005)","journal-title":"Computers & Industrial Engineering"},{"key":"57_CR3","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2012\/731092","volume":"2012","author":"Mohammad D. AL-Tahat","year":"2012","unstructured":"Al-Tahat, M.D., Bataineh, K.M.: Statistical analyses and modeling of the implementation of agile manufacturing tactics in industrial firms (2012)","journal-title":"Mathematical Problems in Engineering"},{"key":"57_CR4","doi-asserted-by":"crossref","unstructured":"Sadrazadeh, A.: A genetic algorithm with the heuristic procedure to solve the multi-line layout problem. Comput. Ind. Eng. 1055\u20131064 (2012)","DOI":"10.1016\/j.cie.2011.12.033"},{"issue":"4","key":"57_CR5","first-page":"379","volume":"67","author":"A Andrade","year":"2014","unstructured":"Andrade, A., Santoro, M., De Tomi, G.: Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation. Rem: Rev. Esc. Minas 67(4), 379\u2013387 (2014). Ouro Preto","journal-title":"Rem: Rev. Esc. Minas"},{"key":"57_CR6","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1016\/j.procir.2015.06.014","volume":"33","author":"Andreas Hees","year":"2015","unstructured":"Andreas Hees, A., Reinhart G.: Approach for production planning in reconfigurable manufacturing systems. In: 9th CIRP Conference on Intelligent Computation in Manufacturing Engineering\u2014CIRP ICME 2014 (2015)","journal-title":"Procedia CIRP"},{"issue":"4","key":"57_CR7","doi-asserted-by":"crossref","first-page":"132","DOI":"10.1016\/j.jmsy.2010.06.003","volume":"28","author":"S Ariafara","year":"2009","unstructured":"Ariafara, S., Ismail, N.: An improved algorithm for layout design in cellular manufacturing systems. J. Manuf. Syst. 28(4), 132\u2013139 (2009)","journal-title":"J. Manuf. Syst."},{"key":"57_CR8","doi-asserted-by":"crossref","first-page":"742","DOI":"10.1016\/j.ijpe.2005.08.010","volume":"103","author":"M Arostegui","year":"2006","unstructured":"Arostegui, M., Kadipasaoglu, S., Khumawala, B.: An empirical comparison of Tabu search, simulated annealing and genetic algorithms for facilities location problems. J. Prod. Econ. 103, 742\u2013754 (2006)","journal-title":"J. Prod. Econ."},{"issue":"6","key":"57_CR9","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1108\/09576050310503420","volume":"16","author":"SB Barla","year":"2003","unstructured":"Barla, S.B.: A case study of supplier selection for lean supply by using a mathematical model. Logistics Inf. Manag. 16(6), 451\u2013459 (2003)","journal-title":"Logistics Inf. Manag."},{"key":"57_CR10","unstructured":"Baruah, S.: A scheduling model inspired by control theory. In: Proceedings of the 6th International Real-Time Scheduling Open Problems Seminar (RTSOPS) (2015)"},{"issue":"1","key":"57_CR11","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1108\/13552510410526875","volume":"10","author":"Marcello Braglia","year":"2004","unstructured":"Braglia, M., Multi-attribute classification method for spare parts inventory management. J. Qual. Maint. Eng. 10(1) (2004)","journal-title":"Journal of Quality in Maintenance Engineering"},{"issue":"1","key":"57_CR12","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1080\/02522667.1991.10699055","volume":"12","author":"Shaukat Brah","year":"1991","unstructured":"Brah, S., Hunsucker, J., Shah, J.: Mathematical modeling of scheduling problems. J. Inf. Optim. Sci. 12 (1991)","journal-title":"Journal of Information and Optimization Sciences"},{"key":"57_CR13","doi-asserted-by":"crossref","unstructured":"Brenner, S.C., Carstensen, C.: Finite Element Methods. Wiley Online Library (2017)","DOI":"10.1002\/9781119176817.ecm2003"},{"key":"57_CR14","doi-asserted-by":"crossref","unstructured":"Burnhual, S., Deb, S.: Scheduling optimization of flexible manufacturing systems using cuckoo search-based approach. Int. J. Adv. Manuf. Technol. 64(5\u20138) (2013)","DOI":"10.1007\/s00170-012-4061-z"},{"key":"57_CR15","volume-title":"Stochastic models of manufacturing systems","author":"JA Buzacott","year":"1993","unstructured":"Buzacott, J.A., Shanthikumar, J.G.: Stochastic models of manufacturing systems. Prentice Hall EEUU, New York (1993)"},{"issue":"3","key":"57_CR16","doi-asserted-by":"crossref","first-page":"317","DOI":"10.1016\/j.ijpe.2004.01.002","volume":"95","author":"D Cao","year":"2005","unstructured":"Cao, D., Chen, M.: A mixed integer programming model for a two line CONWIP-based production and assembly system. Int. J. Prod. Econ. 95(3), 317\u2013326 (2005)","journal-title":"Int. J. Prod. Econ."},{"key":"57_CR17","unstructured":"C\u00e1rdenas, G.E., P\u00e9rez-Lechuga, G., Tuoh-Mora, J.C., Medina-Mar\u00edn, J.: Obtaining the optimal short-term hydrothermal coordination scheduling: a stochastic view point. Appl. Math. Comput. Sci. 3(4), 361\u2013379 (2012). ISSN 0976\u20131586"},{"key":"57_CR18","unstructured":"Cassandras, C.G., Lafortune, S.: Introduction to Discrete Event Systems. Springer, New York (2010)"},{"issue":"01","key":"57_CR19","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1142\/S0217595908001651","volume":"25","author":"CHUN-TAO CHANG","year":"2008","unstructured":"Chang, C.-T., Teng, J-.T., Goyal, S.K.: Inventory lot-size models under trade credits: a review. Asia Pac. J. Oper. Res. 25(01), 89\u2013112 (2008)","journal-title":"Asia-Pacific Journal of Operational Research"},{"key":"57_CR20","doi-asserted-by":"crossref","unstructured":"Chin, C., Chen, W., Chien, F., Wang, J.J.: An AHP-based approach to ERP system selection. Int. J. Prod. Econ. 96(1, 18), 47\u201362 (2005)","DOI":"10.1016\/j.ijpe.2004.03.004"},{"key":"57_CR21","unstructured":"Choudhary, S.K.: Study about the types of information technology service for supply chain. In: Proceedings of the World Congress on Engineering and Computer Science 2016 Vol II WCECS 2016, 19\u201321 October 2016, San Francisco, USA (2016)"},{"key":"57_CR22","doi-asserted-by":"crossref","unstructured":"De Carlo, F., Arlo, M.A. et.al.: Layout design for a low capacity manufacturing line: a case study. Int. J. Eng. Bus. (2013)","DOI":"10.5772\/56883"},{"issue":"4","key":"57_CR23","doi-asserted-by":"crossref","first-page":"1342","DOI":"10.1016\/j.cie.2009.07.003","volume":"57","author":"Sandra D. Ek\u015fio\u011flu","year":"2009","unstructured":"Ek\u015fio\u011flu, S.D., Acharya, A., Leightley, L.E., Arora, S.: Analyzing the design and management of biomass-to-biorefinery supply chain. Comput. Ind. Eng. 57(4), 1342\u20131352 (2009)","journal-title":"Computers & Industrial Engineering"},{"key":"57_CR24","unstructured":"Faizrahnemoon, M.: Mathematical modelling of the scheduling of a production line at SKF, Master\u2019s Thesis, University of Gothenburg (2012)"},{"issue":"2","key":"57_CR25","doi-asserted-by":"crossref","first-page":"767","DOI":"10.1016\/j.ijpe.2005.10.008","volume":"103","author":"MD Fantahun","year":"2006","unstructured":"Fantahun, M.D., Chen, M.: A comprehensive mathematical model for the design of cellular manufacturing systems. Int. J. Prod. Econ. 103(2), 767\u2013783 (2006)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"57_CR26","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1109\/TSMCA.2003.820590","volume":"34","author":"M.P. Fanti","year":"2004","unstructured":"Fanti, M.P., Zhou, M.: Deadlock control methods in automatic manufacturing systems. IEEE Trans. Syst. 34(1) (2004)","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans"},{"issue":"2","key":"57_CR27","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1504\/IJISCM.2008.020693","volume":"3","author":"Amirhossein Ghapanchi","year":"2008","unstructured":"Ghapanchi, A., Jafarzadeh, M.H., Khakbaz, M.-H.: Fuzzy-data envelopment analysis approach to enterprise resource planning system analysis and selection. Int. J. Inform. Syst. Change Manage. 3(2) (2008)","journal-title":"International Journal of Information Systems and Change Management"},{"key":"57_CR28","unstructured":"Ghosha, T., Senguptaa, S., Chattopadhyayb, M., Dana, P.K.: Meta-heuristics in cellular manufacturing: a state-of-the-art review. Int. J. Ind. Eng. Comput. (2011)"},{"issue":"3","key":"57_CR29","first-page":"13","volume":"5","author":"I Ghosh","year":"2014","unstructured":"Ghosh, I.: An Intelligent hybrid multi criteria decision making technique to solve a plant layout problem. Int. J. Ind. Eng. Res. Dev. (IJIERD) 5(3), 13\u201323 (2014)","journal-title":"Int. J. Ind. Eng. Res. Dev. (IJIERD)"},{"issue":"3","key":"57_CR30","doi-asserted-by":"crossref","first-page":"5565","DOI":"10.1016\/j.eswa.2008.06.082","volume":"36","author":"AT Gumus","year":"2009","unstructured":"Gumus, A.T., Guneri, A.F.: A multi-echelon inventory management framework for stochastic and fuzzy supply chains. Expert Syst. Appl. 36(3), 5565\u20135575 (2009). Part 1","journal-title":"Expert Syst. Appl."},{"issue":"5","key":"57_CR31","first-page":"635","volume":"24","author":"Q Hao","year":"2008","unstructured":"Hao, Q., Shen, W.: Implementing a hybrid simulation model for a Kanban-based material handling system. Manufacturing 24(5), 635\u2013646 (2008)","journal-title":"Manufacturing"},{"key":"57_CR32","unstructured":"Hong, M., Payandeh, S., Gruver, W.A.: Modeling and analysis of flexible fixturing systems for agile manufacturing. In: IEEE International Conference on Systems, Man and Cybernetics. Information Intelligence and Systems (1996)"},{"key":"57_CR33","unstructured":"How does additive manufacturing work? https:\/\/www.ge.com\/additive\/additive-manufacturing"},{"key":"57_CR34","unstructured":"Jarimo, T., Pulkkinen, U.: A multi-criteria mathematical programming model for agile virtual organization creation. https:\/\/link.springer.com\/content\/pdf\/10.1007%2F0-387-29360-4_13.pdf"},{"key":"57_CR35","unstructured":"Jin. J.M.: The Finite Element Method in Electromagnetic, 3rd edn. Wiley (2014)"},{"issue":"1","key":"57_CR36","doi-asserted-by":"crossref","first-page":"660","DOI":"10.1016\/j.eswa.2007.09.016","volume":"36","author":"EE Karsak","year":"2009","unstructured":"Karsak, E.E., \u00d6zogul, C.O.: An integrated decision-making approach for ERP system selection. Expert Syst. Appl. 36(1), 660\u2013667 (2009)","journal-title":"Expert Syst. Appl."},{"key":"57_CR37","doi-asserted-by":"crossref","unstructured":"Kia, R., Baboli, A., Javadian, N., Tavakkoli-Moghaddam, R., Kazemi, M.: Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing. Comput. Oper. Res. (2012)","DOI":"10.1016\/j.cor.2012.01.012"},{"key":"57_CR38","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1016\/j.dss.2014.06.011","volume":"66","author":"HS Kilic","year":"2014","unstructured":"Kilic, H.S., Zaim, S.M., Delen, D.: Development of a hybrid methodology for ERP system selection: the case of Turkish Airlines. Decis. Support Syst. 66, 82\u201392 (2014)","journal-title":"Decis. Support Syst."},{"key":"57_CR39","unstructured":"Khusna, D., Zawiah, S., Jamasri, J., Aoyama H.: A proposed study on facility planning and design in manufacturing process. In: Proceedings of the International Multiconference of Engineers and Computers Scientists 2010, vol. 3, Hong Kong (2010)"},{"key":"57_CR40","unstructured":"Lall, V., Teyarachakul, S.: Enterprise resource planning (ERP) system selection: a data envelopment anaysis (DEA) approach. J. Comput. Inf. Syst. 47(1) 2006 (2016)"},{"issue":"1","key":"57_CR41","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1108\/14635770710730937","volume":"14","author":"SC Lenny Koh","year":"2007","unstructured":"Lenny Koh, S.C., Mike Simpson, M.: Could enterprise resource planning create a competitive advantage for small businesses? Benchmarking Int. J. 14(1), 59\u201376 (2007)","journal-title":"Benchmarking Int. J."},{"key":"57_CR42","unstructured":"Lee, Y.H., Golinska, P., Wu, J.Z.: Mathematical models for supply chain management. Mathematical Problems in Engineering, vol. 2016, p. 4. Hindawi Publishing Corporation (2016). Article ID 6167290"},{"key":"57_CR43","unstructured":"Li, P., Shi, K., Zhang, J.: Modeling Agile manufacturing cell using object-oriented timed petri net. http:\/\/keshi.ubiwna.org\/paper\/Modeling%20Agile%20Manufacturing%20Cell%20using%20Object-Oriented%20Timed%20Petri%20net.pdf"},{"key":"57_CR44","doi-asserted-by":"crossref","unstructured":"Li, Z., Wu, N., Zhou, M.: Deadlock control of automatic manufacturing systems based on Petri Nets\u2014A literature review. IEEE Trans. Syst. 42(4) (2012)","DOI":"10.1109\/TSMCC.2011.2160626"},{"key":"57_CR45","first-page":"1","volume":"2017","author":"Xixing Li","year":"2017","unstructured":"Li X., Guo, S., Liu, Y., Du, B., Wang, L.: A production planning model for make-to-order foundry flow shop with capacity constraint. Math. Probl. Eng. 2017 (2017). Article ID 6315613","journal-title":"Mathematical Problems in Engineering"},{"issue":"7","key":"57_CR46","doi-asserted-by":"crossref","first-page":"1005","DOI":"10.1016\/j.is.2006.10.005","volume":"32","author":"X Liao","year":"2007","unstructured":"Liao, X., Li, Y., Lu, B.: A model for selecting an ERP system based on linguistic information processing. Inf. Syst. 32(7), 1005\u20131017 (2007)","journal-title":"Inf. Syst."},{"issue":"12","key":"57_CR47","doi-asserted-by":"crossref","first-page":"3609","DOI":"10.1080\/00207543.2017.1308576","volume":"55","author":"Yongxin Liao","year":"2017","unstructured":"Liao, Y., Deschamps, F., Loures, E.F., Ramos, L.F.P.: Past, present and future of Industry 4.0- a systematic literature review and research agenda proposal. Int. J. Prod. Res. 55(12) 2017 (2017)","journal-title":"International Journal of Production Research"},{"key":"57_CR48","unstructured":"L\u00f3pez-Ortega, O., P\u00e9rez-Lechuga, G.: An express meta model for sharing and exchanging flexible manufacturing resources. In: World Congress Manufacturing, Rochester Institute of Technology, Rochester, New York, USA (2001)"},{"key":"57_CR49","unstructured":"Madhav, P.A.: Mathematical Modelling of Flexible Manufacturing Systems. University of Windsor (1986)"},{"key":"57_CR50","doi-asserted-by":"crossref","unstructured":"Madavhi, I., A., Paydar, Solymanpur, M., Heidarzade, A.: Genetic algorithm approach for solving a cell formation problem in cellular manufacturing. Expert Syst. Appl. (2009)","DOI":"10.1016\/j.eswa.2008.07.054"},{"key":"57_CR51","doi-asserted-by":"crossref","unstructured":"Madavhi, I., Aalaei, A., Paydar, M.M., Solymanpur, M.: Designing a mathematical model for dynamic cellular manufacturing systems considering production planning and worker assignment (2010)","DOI":"10.1016\/j.camwa.2010.03.044"},{"issue":"1","key":"57_CR52","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/j.fss.2004.07.020","volume":"150","author":"NK Mandal","year":"2005","unstructured":"Mandal, N.K., Roy, T.K., Maitic, M.: Multi-objective fuzzy inventory model with three constraints: a geometric programming approach. Fuzzy Sets Syst. 150(1), 87\u2013106 (2005)","journal-title":"Fuzzy Sets Syst."},{"issue":"3","key":"57_CR53","doi-asserted-by":"crossref","first-page":"542","DOI":"10.1016\/j.cie.2011.04.009","volume":"61","author":"K.D. Maniya","year":"2011","unstructured":"Maniya, K., Bhatt, M.G.: An alternative multiple attribute decision making methodology for solving optimal facility layout design selection problems. Comput. Indus. Eng. 61, 542\u2013549 (2011)","journal-title":"Computers & Industrial Engineering"},{"key":"57_CR54","doi-asserted-by":"crossref","unstructured":"Manzhirov, A.V., Lychev, S.A.: Mathematical modeling of additive manufacturing technologies. In: Proceedings of the World Congress on Engineering 2014, WCE 2014, vol. II, London, UK (2014)","DOI":"10.1007\/978-94-017-9804-4_7"},{"key":"57_CR55","doi-asserted-by":"crossref","unstructured":"Manzhirov, A.V.: Mechanical design of viscoelastic parts fabricated using additive manufacturing technologies. In: 2015 Proceedings of the World Congress on Engineering, WCE 2015, vol. II, London, UK (2015)","DOI":"10.1007\/978-94-017-9804-4_7"},{"key":"57_CR56","unstructured":"Method for controlled optimization of enterprise planning models. https:\/\/translate.google.com\/?hl=es#es\/en\/Method%20for%20controlled%20optimization%20of%20enterprise%20planning%20models"},{"issue":"1","key":"57_CR57","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1016\/j.fss.2005.05.045","volume":"157","author":"J Mula","year":"2006","unstructured":"Mula, J., Poler, R., Garc\u00eda, J.P.: MRP with flexible constraints: a fuzzy mathematical programming approach. Fuzzy Sets Syst. 157(1), 74\u201397 (2006)","journal-title":"Fuzzy Sets Syst."},{"issue":"1","key":"57_CR58","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1016\/j.ijpe.2005.09.001","volume":"103","author":"J Mula","year":"2006","unstructured":"Mula, J., Poler, R., Garc\u00eda, J.P.: Models for production planning under uncertainty: a review. Int. J. Prod. Econ. 103(1), 271\u2013285 (2006)","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"57_CR59","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/j.ejor.2009.09.008","volume":"204","author":"J Mula","year":"2010","unstructured":"Mula, J., Peidro, D., Diaz-Madro\u00f1ero, M., Vicens, E.: Mathematical programming models for supply chain production and transport planning. Eur. J. Oper. Res. 204(3), 377\u2013390 (2010)","journal-title":"Eur. J. Oper. Res."},{"key":"57_CR60","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2015\/809216","volume":"2015","author":"Gholamreza Norouzi","year":"2015","unstructured":"Norouzi, G., Heydari, M., Noory, S., Bagherpour, M.: Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks. J. Appl. Math. 2015 (2015). Article ID 809216","journal-title":"Journal of Applied Mathematics"},{"issue":"2013","key":"57_CR61","doi-asserted-by":"crossref","first-page":"1275","DOI":"10.1016\/j.apm.2012.03.041","volume":"37","author":"M Omar","year":"2013","unstructured":"Omar, M., Sarker, R., Othman, W.A.M.: A just-in-time three-level integrated manufacturing system for linearly time-varying demand process. Appl. Math. Model. 37(2013), 1275\u20131281 (2013)","journal-title":"Appl. Math. Model."},{"key":"57_CR62","doi-asserted-by":"crossref","unstructured":"P\u00e9rez, L.G., Gress, E.S.H., Karelyn, A., Or\u00e1n, M.G.M.: Some efficiency measures in the operation of flexible manufacturing systems: a stochastic approach. In: Proceedings of the 2009 SIAM Conference on \u201cMathematics for Industry\u201d, SIAM, EEUU, pp. 31\u201336 (2010)","DOI":"10.1137\/1.9781611973303.4"},{"key":"57_CR63","unstructured":"P\u00e9rez-Lechuga, G., Flores-Rivera, C., Karelyn, A., Tarasenko, A.: A multi-period stochastic model to link the supply chain production planning in a manufacturing organization, Advances in science and statistics applications. 6(4) 255\u2013283 (2011). ISSN 0974-6811"},{"key":"57_CR64","unstructured":"P\u00e9rez, L.G., P\u00e9rez, R.E., Venegas, M.F.: Stochastic optimization of manufacture systems by using Markov decision processes. In: Vasant, P., Weber, G., Dieu, V.N. (eds.) Handbook of Research on Modern Optimization Algorithms and Applications in Engineering and Economics, Engineering Science Reference, EEUU. IGI Global (2015)"},{"key":"57_CR65","unstructured":"P\u00e9rez, L.G., Bujari, A.A., Venegas, M.F.: Economic aspects of the production planning in lines of manufacturing under conditions of uncertainty. In: Ram\u00edrez, C.E.C., Venegas, M.F., Herrera, F. (eds.) Modeling of Economic and Financial Phenomena: A Contemporary Vision, Editorial Castdel, S.A. de C.V, Mexico (2017)"},{"key":"57_CR66","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1186\/s13362-018-0044-5","volume":"8","author":"G P\u00e9rez-Lechuga","year":"2018","unstructured":"P\u00e9rez-Lechuga, G.: Optimal logistics strategy to distribute medicines in clinics and hospitals. J. Math. Ind. 8, 2 (2018)","journal-title":"J. Math. Ind."},{"key":"57_CR67","volume-title":"Production Planning by Mixed Integer Programming","author":"Y Pochet","year":"2006","unstructured":"Pochet, Y., Wolsey, L.A.: Production Planning by Mixed Integer Programming. Springer, New York (2006)"},{"issue":"6","key":"57_CR68","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1016\/j.ijmachtools.2007.11.004","volume":"48","author":"JK Rai","year":"2008","unstructured":"Rai, J.K., Xirouchakis, P.: Finite element method based machining simulation environment for analyzing part errors induced during milling of thin-walled components. Int. J. Mach. Tools Manuf. 48(6), 629\u2013643 (2008)","journal-title":"Int. J. Mach. Tools Manuf."},{"key":"57_CR69","doi-asserted-by":"crossref","unstructured":"Raj, S.A., Sudheer, A., Vinodh, S., Anand, G.: A mathematical model to evaluate the role of agility enablers and criteria in a manufacturing environment. Int. J. Prod. Res. 51(19) (2013)","DOI":"10.1080\/00207543.2013.825381"},{"key":"57_CR70","doi-asserted-by":"crossref","unstructured":"Roberts, I.A., Wang, C.J., Esterlein, R., Stanford, M., Mynors, D.J.: A three-dimensional finite element analysis of the temperature field during laser melting of metal powders in additive layer manufacturing. Int. J. Mach. Tools Manuf. (2009)","DOI":"10.1016\/j.ijmachtools.2009.07.004"},{"key":"57_CR71","unstructured":"Rosen, D.W.: Design for additive manufacturing: a method to explore unexplored regions of the design. https:\/\/pdfs.semanticscholar.org\/101a\/8f03ed20725ae71d30537e90f783a398e86f.pdf"},{"issue":"5","key":"57_CR72","doi-asserted-by":"crossref","first-page":"2155","DOI":"10.3233\/IFS-130890","volume":"26","author":"L Rui","year":"2014","unstructured":"Rui, L., Xiaofei, Z., Guiwu, W.: Models for selecting an ERP system with hesitant fuzzy linguistic information. J. Intel. Fuzzy Syst. 26(5), 2155\u20132165 (2014)","journal-title":"J. Intel. Fuzzy Syst."},{"issue":"1","key":"57_CR73","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/0925-5273(95)00166-2","volume":"42","author":"M Savsar","year":"1995","unstructured":"Savsar, M., Jawini, A.N.: Simulation analysis of just-in-time production systems. Int. J. Prod. Econ. 42(1), 67\u201378 (1995)","journal-title":"Int. J. Prod. Econ."},{"key":"57_CR74","doi-asserted-by":"crossref","unstructured":"Sawik, T.: Scheduling in Supply Chains Using Mixed Integer Programming. Wiley (2011)","DOI":"10.1002\/9781118029114"},{"key":"57_CR75","doi-asserted-by":"crossref","unstructured":"Shah, K., Ripon, N., Glette, K., et. al.: Adaptive variable neighborhood search for solving multi- objective facility layout problem with unequal area facilities. Swarm Evol. Comput. (2012)","DOI":"10.1016\/j.swevo.2012.07.003"},{"issue":"10\u201311","key":"57_CR76","doi-asserted-by":"crossref","first-page":"754","DOI":"10.1007\/s00170-002-1387-y","volume":"21","author":"P Shahabudeen","year":"2003","unstructured":"Shahabudeen, P., Krishnaiah, K., Narayanan, M.T.: Design of a Two-card dynamic Kanban system using a simulated annealing algorithm. Int. J. Adv. Manuf. Technol. 21(10\u201311), 754\u2013759 (2003)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"57_CR77","doi-asserted-by":"crossref","unstructured":"Shapiro, J.F.: Mathematical programming models and methods for production planning and scheduling. In: Handbooks in Operations Research and Management Science, vol. 4, pp. 371\u2013443 (1993)","DOI":"10.1016\/S0927-0507(05)80188-4"},{"key":"57_CR78","unstructured":"Solymanpur, M., Vrat, P., Shankar, R.: Ant colony optimization algorithm to the inter-cell layout problem in cellular manufacturing. Eur. J. Oper. Res. 157(3), 592\u2013606 (2004)"},{"key":"57_CR79","doi-asserted-by":"crossref","unstructured":"Sun, L., Heragu, S.S., Chen, L., Spearman, M.L., Simulation analysis of a multi-item MRP system based on factorial design. In: 2009 Proceedings of the Winter Simulation Conference (WSC), pp. 2107\u20132114 (2009)","DOI":"10.1109\/WSC.2009.5429655"},{"issue":"2","key":"57_CR80","doi-asserted-by":"crossref","first-page":"212","DOI":"10.1016\/j.ijpe.2004.11.012","volume":"100","author":"S Talluri","year":"2006","unstructured":"Talluri, S., Narasimhan, R., Nairb, A.: Vendor performance with supply risk: A chance-constrained DEA approach. Int. J. Prod. Econ. 100(2), 212\u2013222 (2006)","journal-title":"Int. J. Prod. Econ."},{"key":"57_CR81","doi-asserted-by":"crossref","unstructured":"Tayur, S., Ganeshan, R., Magazine, M.: Quantitative Models for Chain supply Management. Kluwer\u2019s International Series (1999)","DOI":"10.1007\/978-1-4615-4949-9"},{"key":"57_CR82","unstructured":"Thapa, G.: Optimization of just-in-time sequencing problems and supply chain logistics. M\u00e4lardalen University Press Dissertations No. 184 (2015). https:\/\/www.diva-portal.org\/smash\/get\/diva2:851513\/FULLTEXT01.pdf"},{"key":"57_CR83","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/j.cor.2015.07.005","volume":"65","author":"B Urek","year":"2016","unstructured":"Urek, B., Kaya, O.: A mixed integer nonlinear programming model and heuristic solutions for location, inventory and pricing decisions in a closed loop supply chain. Comput. Oper. Res. 65, 93\u2013103 (2016)","journal-title":"Comput. Oper. Res."},{"key":"57_CR84","unstructured":"Voss, S., Woodruff, D.: Connecting MRP, MRP II and ERP- supply chain production planning via optimization models, In: Greenberg, H.J. (ed.) Tutorials on Emerging Methodologies and Applications in Operations Research. Springer Science & Business Media (2006)"},{"issue":"1","key":"57_CR85","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/j.cie.2003.09.009","volume":"46","author":"RCH Wang","year":"2004","unstructured":"Wang, R.C.H., Liang, T.F.: Application of fuzzy multi-objective linear programming to aggregate production planning. Comput. Ind. Eng. 46(1), 17\u201341 (2004)","journal-title":"Comput. Ind. Eng."},{"key":"57_CR86","unstructured":"What are automated manufacturing systems? https:\/\/connell-ind.com\/what-are-automated-manufacturing-systems\/"},{"key":"57_CR87","unstructured":"What is agile manufacturing? https:\/\/translate.google.com\/?hl=es#en\/es\/WHAT%20IS%20AGILE%20MANUFACTURING%3F%20Why%20is%20it%20an%20effective%20strategy%3F"},{"key":"57_CR88","unstructured":"Wazed, M.A., Ahmed, S., Nukman, Y.: Mathematical models for multistage production under commonality and uncertainty. http:\/\/ebooks.asmedigitalcollection.asme.org\/content.aspx?bookid=481&sectionid=38789428"},{"issue":"2","key":"57_CR89","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/S0263-7863(02)00064-9","volume":"22","author":"CC Wei","year":"2004","unstructured":"Wei, C.C.: Wang, J, J., A comprehensive framework for selecting an ERP system. Int. J. Project Manage. 22(2), 161\u2013169 (2004)","journal-title":"Int. J. Project Manage."},{"issue":"7","key":"57_CR90","doi-asserted-by":"crossref","first-page":"2464","DOI":"10.1080\/00207543.2017.1387302","volume":"56","author":"Anupma Yadav","year":"2017","unstructured":"Yadav, A., Jayswal, S.C.: Modelling of flexible manufacturing systems: a review. Int. J. Prod. Res. 56(7) (2017)","journal-title":"International Journal of Production Research"},{"issue":"5","key":"57_CR91","doi-asserted-by":"crossref","first-page":"9214","DOI":"10.1016\/j.eswa.2008.12.022","volume":"36","author":"HR Yazgan","year":"2009","unstructured":"Yazgan, H.R., Boran, S., Goztepe, K.: An ERP software selection process with using artificial neural network based on analytic network process approach. Expert Syst. Appl. 36(5), 9214\u20139222 (2009)","journal-title":"Expert Syst. Appl."},{"key":"57_CR92","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2016\/7915673","volume":"2016","author":"Erhan Yaz\u0131c\u0131","year":"2016","unstructured":"Yaz\u0131c\u0131, E., B\u00fcy\u00fck\u00f6zkan, G., Baskak, M.: A new extended MILP MRP approach to production planning and its application in the jewelry industry. Math. Probl. Eng. 2016 (2016). Article ID 7915673","journal-title":"Mathematical Problems in Engineering"},{"key":"57_CR93","doi-asserted-by":"crossref","unstructured":"Yilmaz, O.F., Suleiman, T. (eds.): Handbook of Research on Applied Optimization Methodologies in Manufacturing. IGI-Global (2018)","DOI":"10.4018\/978-1-5225-2944-6"},{"key":"57_CR94","unstructured":"Yousefi, M., Hosseinioun, S.S., Taghikhah, F.: Determining optimum number of kanbans for workstations in a kanban-based manufacturing line using discrete-event simulation: a case of study. In: Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management, Istanbul, Turkey (2012)"},{"issue":"12","key":"57_CR95","doi-asserted-by":"crossref","first-page":"2723","DOI":"10.1080\/00207540110048963","volume":"39","author":"Wen Zhang","year":"2001","unstructured":"Zhang, W., Chen, M.: A mathematical programming model for production planning using CONWIP. Int. J. Prod. Res. 39(12), 2001 (2010)","journal-title":"International Journal of Production Research"},{"key":"57_CR96","first-page":"260","volume":"18","author":"J Zhenyuan","year":"2011","unstructured":"Zhenyuan, J., Xiaohong, L., Wei, W., et al.: Design and implementation of lean facility layout system of a production line. Int. J. Ind. Eng. 18, 260\u2013269 (2011)","journal-title":"Int. J. Ind. Eng."},{"key":"57_CR97","doi-asserted-by":"crossref","unstructured":"Zhou, J., Yang, G., Tang, G.: The mathematical modeling of the mobile recharging facility vehicles\u2019 scheduling and its genetic algorithm solution. In: IEEE International Conference on Cyber Technology in Automation, Control, and Intelligent Systems (CYBER) (2015)","DOI":"10.1109\/CYBER.2015.7288262"},{"key":"57_CR98","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-3126-5","volume-title":"Petri Net Synthesis for Discrete Event Control of Manufacturing Systems","author":"MengChu Zhou","year":"1993","unstructured":"Zhou, M., Dicesare, F.: Petri Net Synthesis for Discrete Event Control of Manufacturing Systems. Springer Science, New York (1993)"},{"issue":"1","key":"57_CR99","doi-asserted-by":"crossref","first-page":"26","DOI":"10.13165\/VSE-15-5-1-03","volume":"5","author":"Serhii Ziukov","year":"2015","unstructured":"Ziukov, S.: A literature review on models of inventory management under uncertainty. Bus. Syst. Econ. 5(1) (2015)","journal-title":"Business Systems & Economics"}],"container-title":["Advances in Intelligent Systems and Computing","Intelligent Computing &amp; Optimization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-00979-3_57","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,5]],"date-time":"2023-09-05T12:34:01Z","timestamp":1693917241000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-00979-3_57"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,9,28]]},"ISBN":["9783030009786","9783030009793"],"references-count":99,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-00979-3_57","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"value":"2194-5357","type":"print"},{"value":"2194-5365","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,9,28]]},"assertion":[{"value":"ICO","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Intelligent Computing & Optimization","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Pattaya","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Thailand","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2018","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"4 October 2018","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"5 October 2018","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"1","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"ico2018","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.icico.info\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}