{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,28]],"date-time":"2025-03-28T01:59:01Z","timestamp":1743127141581,"version":"3.40.3"},"publisher-location":"Cham","reference-count":9,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030059828"},{"type":"electronic","value":"9783030059835"}],"license":[{"start":{"date-parts":[[2018,12,18]],"date-time":"2018-12-18T00:00:00Z","timestamp":1545091200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-05983-5_15","type":"book-chapter","created":{"date-parts":[[2018,12,17]],"date-time":"2018-12-17T12:27:46Z","timestamp":1545049666000},"page":"191-199","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Applying an Iterated Greedy Algorithm to Production Programming on Manufacturing Environment Controlled by the PBC Ordering System"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8316-7372","authenticated-orcid":false,"given":"Fabio","family":"Molina da Silva","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4659-1745","authenticated-orcid":false,"given":"Roberto","family":"Tavares Neto","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,12,18]]},"reference":[{"key":"15_CR1","doi-asserted-by":"publisher","DOI":"10.7551\/mitpress\/1290.001.0001","volume-title":"Ant Colony Optimization","author":"M Dorigo","year":"2004","unstructured":"Dorigo, M., St\u00fctzle, T.: Ant Colony Optimization. MIT Press, Cambridge (2004)"},{"issue":"3","key":"15_CR2","doi-asserted-by":"publisher","first-page":"454","DOI":"10.1016\/j.ejor.2013.07.035","volume":"232","author":"C Garcia-Martinez","year":"2014","unstructured":"Garcia-Martinez, C., Rodriguez, F., Lozano, M.: Tabu-enhanced iterated greedy algorithm: a case study in the quadratic multiple knapsack problem. Eur. J. Oper. Res. 232(3), 454\u2013463 (2014)","journal-title":"Eur. J. Oper. Res."},{"key":"15_CR3","volume-title":"Genetic Algorithms in Search, Optimization, and Machine Learning","author":"DE Goldberg","year":"1989","unstructured":"Goldberg, D.E.: Genetic Algorithms in Search, Optimization, and Machine Learning. Addison-Wesley Professional, Boston (1989)"},{"key":"15_CR4","doi-asserted-by":"publisher","first-page":"760","DOI":"10.1007\/978-0-387-30164-8","volume-title":"Encyclopedia of Machine Learning","author":"J Kennedy","year":"2011","unstructured":"Kennedy, J.: Particle swarm optimization. In: Sammut, C., Webb, G.I. (eds.) Encyclopedia of Machine Learning, pp. 760\u2013766. Springer, Heidelberg (2011). https:\/\/doi.org\/10.1007\/978-0-387-30164-8"},{"key":"15_CR5","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M Nawaz","year":"1983","unstructured":"Nawaz, M., Enscore, E.E., Ham, I.: A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega 11, 91\u201395 (1983)","journal-title":"Omega"},{"issue":"7\u20138","key":"15_CR6","doi-asserted-by":"publisher","first-page":"778","DOI":"10.1007\/s00170-007-1120-y","volume":"38","author":"Q-K Pan","year":"2008","unstructured":"Pan, Q.-K., Wang, L., Zhao, B.-H.: An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion. Int. J. Adv. Manuf. Technol. 38(7\u20138), 778\u2013786 (2008)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"7","key":"15_CR7","doi-asserted-by":"publisher","first-page":"1829","DOI":"10.1016\/j.cor.2013.01.018","volume":"40","author":"FJ Rodriguez","year":"2013","unstructured":"Rodriguez, F.J., Lozano, M., Blum, C., Garc\u00eda-Mart\u00ednez, C.: An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem. Comput. Oper. Res. 40(7), 1829\u20131841 (2013)","journal-title":"Comput. Oper. Res."},{"issue":"3","key":"15_CR8","doi-asserted-by":"publisher","first-page":"1143","DOI":"10.1016\/j.ejor.2006.07.029","volume":"187","author":"R Ruiz","year":"2008","unstructured":"Ruiz, R., St\u00fctzle, T.: An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives. Eur. J. Oper. Res. 187(3), 1143\u20131159 (2008)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"15_CR9","doi-asserted-by":"publisher","first-page":"7087","DOI":"10.1016\/j.eswa.2008.08.033","volume":"36","author":"K-C Ying","year":"2009","unstructured":"Ying, K.-C., Lin, S.-W., Huang, C.Y.: Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic. Expert Syst. Appl. 36(3), 7087\u20137092 (2009)","journal-title":"Expert Syst. Appl."}],"container-title":["Lecture Notes in Computer Science","Hybrid Metaheuristics"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-05983-5_15","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,13]],"date-time":"2024-03-13T20:24:47Z","timestamp":1710361487000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-05983-5_15"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12,18]]},"ISBN":["9783030059828","9783030059835"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-05983-5_15","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2018,12,18]]},"assertion":[{"value":"18 December 2018","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"HM","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Workshop on Hybrid Metaheuristics","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Concepci\u00f3n","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Chile","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"16 January 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"18 January 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"11","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"hm2019","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/hm2019.ing.udec.cl\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}