{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,7]],"date-time":"2026-03-07T17:58:06Z","timestamp":1772906286133,"version":"3.50.1"},"publisher-location":"Cham","reference-count":50,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030137083","type":"print"},{"value":"9783030137090","type":"electronic"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-13709-0_46","type":"book-chapter","created":{"date-parts":[[2019,2,13]],"date-time":"2019-02-13T18:09:04Z","timestamp":1550081344000},"page":"545-559","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":13,"title":["Reinforcement Learning Methods for Operations Research Applications: The Order Release Problem"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4812-4665","authenticated-orcid":false,"given":"Manuel","family":"Schneckenreither","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2589-1367","authenticated-orcid":false,"given":"Stefan","family":"Haeussler","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,2,14]]},"reference":[{"key":"46_CR1","first-page":"20","volume":"3","author":"S Ackerman","year":"1963","unstructured":"Ackerman, S.: Even-flow a scheduling method for reducing lateness in job shops. Manag. Technol. 3, 20\u201332 (1963)","journal-title":"Manag. Technol."},{"issue":"1","key":"46_CR2","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1016\/j.cie.2007.04.006","volume":"53","author":"Derya Eren Akyol","year":"2007","unstructured":"Akyol, D.E., Bayhan, G.M.: A review on evolution of production scheduling with neural networks. Comput. Ind. Eng. 53(1), 95\u2013122 (2007). http:\/\/www.sciencedirect.com\/science\/article\/pii\/S0360835207000666","journal-title":"Computers & Industrial Engineering"},{"key":"46_CR3","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1109\/17.293383","volume":"41","author":"H Aytug","year":"1994","unstructured":"Aytug, H., Bhattacharyya, S., Koehler, G.J., Snowdon, J.L.: A review of machine learning in scheduling. IEEE Trans. Eng. Manag. 41, 165\u2013171 (1994)","journal-title":"IEEE Trans. Eng. Manag."},{"key":"46_CR4","doi-asserted-by":"crossref","unstructured":"Baykasoglu, A., Gocken, M.: A simulation based approach to analyse the effects of job release on the performance of a multi-stage job-shop with processing flexibility. Int. J. Prod. Res. 49(2), 585\u2013610 (2011). <GotoISI>:\/\/WOS:000284413100015","DOI":"10.1080\/00207540903479778"},{"issue":"3","key":"46_CR5","doi-asserted-by":"publisher","first-page":"375","DOI":"10.1080\/00207548808947871","volume":"26","author":"W Bechte","year":"1988","unstructured":"Bechte, W.: Theory and practice of load-oriented manufacturing control. Int. J. Prod. Res. 26(3), 375\u2013395 (1988)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"46_CR6","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1080\/09537289408919499","volume":"5","author":"W Bechte","year":"1994","unstructured":"Bechte, W.: Load-oriented manufacturing control just-in-time production for job shops. Prod. Plan. Control 5(3), 292\u2013307 (1994)","journal-title":"Prod. Plan. Control"},{"key":"46_CR7","volume-title":"Production Control and Information Systems for Component Manufacturing Shops","author":"JWM Bertrand","year":"1981","unstructured":"Bertrand, J.W.M., Wortmann, J.C.: Production Control and Information Systems for Component Manufacturing Shops. Elsevier Science Inc., New York (1981)"},{"key":"46_CR8","volume-title":"Production Control: A Structural and Design Oriented Approach","author":"J Bertrand","year":"1990","unstructured":"Bertrand, J., Wortmann, J., Wijngaard, J.: Production Control: A Structural and Design Oriented Approach. Elsevier, Amsterdam (1990)"},{"key":"46_CR9","series-title":"Wiley Series in Probability and Statistics","volume-title":"Practical Nonparametric Statistics","author":"W Conover","year":"1999","unstructured":"Conover, W.: Practical Nonparametric Statistics. Wiley Series in Probability and Statistics, 3rd edn. Wiley, New York (1999)","edition":"3"},{"issue":"1","key":"46_CR10","doi-asserted-by":"publisher","first-page":"90","DOI":"10.1108\/09576060410512365","volume":"15","author":"S Enns","year":"2004","unstructured":"Enns, S., Suwanruji, P.: Work load responsive adjustment of planned lead times. J. Manuf. Technol. Manag. 15(1), 90\u2013100 (2004)","journal-title":"J. Manuf. Technol. Manag."},{"issue":"1","key":"46_CR11","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1016\/0272-6963(82)90019-5","volume":"3","author":"L Gelders","year":"1982","unstructured":"Gelders, L., Van Wassenhove, L.N.: Hierarchical integration in production planning: theory and practice. J. Oper. Manag. 3(1), 27\u201335 (1982)","journal-title":"J. Oper. Manag."},{"issue":"1","key":"46_CR12","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0377-2217(89)90266-X","volume":"40","author":"L.C. Hendry","year":"1989","unstructured":"Hendry, L., Kingsman, B.: Production planning systems and their applicability to make-to-order companies. Eur. J. Oper. Res. 40(1), 1\u201315 (1989). http:\/\/www.sciencedirect.com\/science\/article\/pii\/037722178990266X","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"46_CR13","doi-asserted-by":"publisher","first-page":"6","DOI":"10.1108\/01443579110144655","volume":"11","author":"L Hendry","year":"1991","unstructured":"Hendry, L., Kingsman, B.: A decision support system for job release in make-to-order companies. Int. J. Ope. Prod. Manag. 11(6), 6\u201316 (1991)","journal-title":"Int. J. Ope. Prod. Manag."},{"issue":"1","key":"46_CR14","first-page":"63","volume":"19","author":"J Hoyt","year":"1978","unstructured":"Hoyt, J.: Dynamic lead times that fit today\u2019s dynamic planning (quoat lead times). Prod. Inventory Manag. 19(1), 63\u201371 (1978)","journal-title":"Prod. Inventory Manag."},{"issue":"9","key":"46_CR15","doi-asserted-by":"publisher","first-page":"1727","DOI":"10.1080\/00207540310001624375","volume":"42","author":"SY Hsu","year":"2004","unstructured":"Hsu, S.Y., Sha, D.Y.: Due date assignment using artificial neural networks under different shop floor control strategies. Int. J. Prod. Res. 42(9), 1727\u20131745 (2004). https:\/\/doi.org\/10.1080\/00207540310001624375","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"46_CR16","doi-asserted-by":"publisher","first-page":"272","DOI":"10.1080\/0013791X.2016.1185808","volume":"62","author":"AD Karaoglan","year":"2017","unstructured":"Karaoglan, A.D., Karademir, O.: Flow time and product cost estimation by using an artificial neural network (ANN): a case study for transformer orders. Eng. Econ. 62(3), 272\u2013292 (2017). https:\/\/doi.org\/10.1080\/0013791X.2016.1185808","journal-title":"Eng. Econ."},{"key":"46_CR17","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1016\/j.procir.2013.05.017","volume":"7","author":"M Knollmann","year":"2013","unstructured":"Knollmann, M., Windt, K.: Control-theoretic analysis of the lead time syndrome and its impact on the logistic target achievement. Procedia CIRP 7, 97\u2013102 (2013)","journal-title":"Procedia CIRP"},{"key":"46_CR18","volume-title":"Simulation Modeling & Analysis","author":"AM Law","year":"2000","unstructured":"Law, A.M., Kelton, W.D.: Simulation Modeling & Analysis, 3rd edn. McGraw-Hill Inc., New York (2000)","edition":"3"},{"issue":"4","key":"46_CR19","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1080\/002075497195605","volume":"35","author":"CY Lee","year":"1997","unstructured":"Lee, C.Y., Piramuthu, S., Tsai, Y.K.: Job shop scheduling with a genetic algorithm and machine learning. Int. J. Prod. Res. 35(4), 1171\u20131191 (1997). https:\/\/doi.org\/10.1080\/002075497195605","journal-title":"Int. J. Prod. Res."},{"key":"46_CR20","doi-asserted-by":"crossref","unstructured":"Li, S., Li, Y., Liu, Y., Xu, Y.: A GA-based NN approach for makespan estimation. Appl. Math. Comput. 185(2), 1003\u20131014 (2007). Special Issue on Intelligent Computing Theory and Methodology. http:\/\/www.sciencedirect.com\/science\/article\/pii\/S0096300306008253","DOI":"10.1016\/j.amc.2006.07.024"},{"key":"46_CR21","unstructured":"Lillicrap, T.P., et al.: Continuous control with deep reinforcement learning. arXiv preprint arXiv:1509.02971 (2015)"},{"key":"46_CR22","unstructured":"Lin, L.J.: Reinforcement learning for robots using neural networks. Technical report, School of Computer Science, Carnegie-Mellon University, Pittsburgh, PA (1993)"},{"issue":"1","key":"46_CR23","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1007\/BF00114727","volume":"22","author":"S Mahadevan","year":"1996","unstructured":"Mahadevan, S.: Average reward reinforcement learning: foundations, algorithms, and empirical results. Mach. Learn. 22(1), 159\u2013195 (1996). https:\/\/doi.org\/10.1007\/BF00114727","journal-title":"Mach. Learn."},{"key":"46_CR24","first-page":"27","volume":"19","author":"H Mather","year":"1978","unstructured":"Mather, H., Plossl, G.W.: Priority fixation versus throughput planning. Prod. Inventory Manag. 19, 27\u201351 (1978)","journal-title":"Prod. Inventory Manag."},{"key":"46_CR25","doi-asserted-by":"crossref","unstructured":"Melnyk, S.A., Ragatz, G.L.: Order review release - research issues and perspectives. Int. J. Prod. Res. 27(7), 1081\u20131096 (1989). <GotoISI>:\/\/WOS:A1989AC60400003","DOI":"10.1080\/00207548908942609"},{"issue":"23","key":"46_CR26","doi-asserted-by":"publisher","first-page":"6909","DOI":"10.1080\/00207540903307581","volume":"48","author":"G Metan","year":"2010","unstructured":"Metan, G., Sabuncuoglu, I., Pierreval, H.: Real time selection of scheduling rules and knowledge extraction via dynamically controlled data mining. Int. J. Prod. Res. 48(23), 6909\u20136938 (2010). https:\/\/doi.org\/10.1080\/00207540903307581","journal-title":"Int. J. Prod. Res."},{"key":"46_CR27","unstructured":"Mnih, V., et al.: Asynchronous methods for deep reinforcement learning. In: International Conference on Machine Learning, pp. 1928\u20131937 (2016)"},{"issue":"7540","key":"46_CR28","doi-asserted-by":"publisher","first-page":"529","DOI":"10.1038\/nature14236","volume":"518","author":"V Mnih","year":"2015","unstructured":"Mnih, V., et al.: Human-level control through deep reinforcement learning. Nature 518(7540), 529\u2013533 (2015)","journal-title":"Nature"},{"issue":"4","key":"46_CR29","doi-asserted-by":"publisher","first-page":"983","DOI":"10.1080\/002075497195498","volume":"35","author":"A Molinder","year":"1997","unstructured":"Molinder, A.: Joint optimization of lot-sizes, safety stocks and safety lead times in a MRP system. Int. J. Prod. Res. 35(4), 983\u2013994 (1997)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"46_CR30","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1007\/s10479-007-0173-5","volume":"153","author":"J Pahl","year":"2007","unstructured":"Pahl, J., Vo\u00df, S., Woodruff, D.L.: Production planning with load dependent lead times: an update of research. Ann. Oper. Res. 153(1), 297\u2013345 (2007). https:\/\/doi.org\/10.1007\/s10479-007-0173-5","journal-title":"Ann. Oper. Res."},{"issue":"1","key":"46_CR31","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1080\/07408170108936807","volume":"33","author":"CD Paternina-Arboleda","year":"2001","unstructured":"Paternina-Arboleda, C.D., Das, T.K.: Intelligent dynamic control policies for serial production lines. IIE Trans. 33(1), 65\u201377 (2001). https:\/\/doi.org\/10.1080\/07408170108936807","journal-title":"IIE Trans."},{"issue":"21","key":"46_CR32","doi-asserted-by":"publisher","first-page":"6009","DOI":"10.1080\/00207540701197036","volume":"46","author":"R Patil","year":"2008","unstructured":"Patil, R.: Using ensemble and metaheuristics learning principles with artificial neural networks to improve due date prediction performance. Int. J. Prod. Res. 46(21), 6009\u20136027 (2008)","journal-title":"Int. J. Prod. Res."},{"issue":"5-6","key":"46_CR33","doi-asserted-by":"publisher","first-page":"825","DOI":"10.1111\/j.1540-5915.1994.tb01871.x","volume":"25","author":"Patrick R. Philipoom","year":"1994","unstructured":"Philipoom, P.R., Rees, L.P., Wiegmann, L.: Using neural networks to determine internally-set due-date assignments for shop scheduling. Decis. Sci. 25(5\u20136), 825\u2013851 (1994). http:\/\/dx.doi.org\/10.1111\/j.1540-5915.1994.tb01871.x","journal-title":"Decision Sciences"},{"issue":"1","key":"46_CR34","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1016\/S0377-2217(02)00173-X","volume":"145","author":"W.H.M Raaymakers","year":"2003","unstructured":"Raaymakers, W., Weijters, A.: Makespan estimation in batch process industries: a comparison between regression analysis and neural networks. Eur. J. Oper. Res. 145(1), 14\u201330 (2003). http:\/\/www.sciencedirect.com\/science\/article\/pii\/S037722170200173X","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"46_CR35","doi-asserted-by":"publisher","first-page":"9","DOI":"10.1109\/64.43266","volume":"4","author":"DV Savell","year":"1989","unstructured":"Savell, D.V., Perez, R.A., Koh, S.W.: Scheduling semiconductor wafer production: an expert system implementation. IEEE Expert 4(3), 9\u201315 (1989). (Fall)","journal-title":"IEEE Expert"},{"issue":"2","key":"46_CR36","doi-asserted-by":"publisher","first-page":"237","DOI":"10.1016\/S0377-2217(02)00501-5","volume":"150","author":"C Schneeweiss","year":"2003","unstructured":"Schneeweiss, C.: Distributed decision making\u2013a unified approach. Eur. J. Oper. Res. 150(2), 237\u2013252 (2003)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"46_CR37","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1016\/j.ijpe.2005.04.005","volume":"104","author":"B Selcuk","year":"2006","unstructured":"Selcuk, B., Fransoo, J.C., De Kok, A.: The effect of updating lead times on the performance of hierarchical planning systems. Int. J. Prod. Econ. 104(2), 427\u2013440 (2006)","journal-title":"Int. J. Prod. Econ."},{"key":"46_CR38","unstructured":"Silver, D., et al.: Mastering chess and shogi by self-play with a general reinforcement learning algorithm. arXiv preprint arXiv:1712.01815 (2017)"},{"issue":"5","key":"46_CR39","doi-asserted-by":"publisher","first-page":"879","DOI":"10.1080\/00207549008942761","volume":"28","author":"MARK L. SPEARMAN","year":"1990","unstructured":"Spearman, M.L., Woodruff, D.L., Hopp, W.J.: CONWIP: a pull alternative to Kanban. Int. J. Prod. Res. 28(5), 879\u2013894 (1990). http:\/\/www.tandfonline.com\/doi\/abs\/10.1080\/00207549008942761","journal-title":"International Journal of Production Research"},{"key":"46_CR40","volume-title":"Reinforcement Learning: An Introduction","author":"RS Sutton","year":"1998","unstructured":"Sutton, R.S., Barto, A.G.: Reinforcement Learning: An Introduction, vol. 1. MIT Press, Cambridge (1998)"},{"issue":"4","key":"46_CR41","doi-asserted-by":"publisher","first-page":"351","DOI":"10.1016\/0377-2217(83)90235-7","volume":"14","author":"I Tatsiopoulos","year":"1983","unstructured":"Tatsiopoulos, I., Kingsman, B.: Lead time management. Eur. J. Oper. Res. 14(4), 351\u2013358 (1983)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"46_CR42","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1111\/j.1937-5956.2011.01263.x","volume":"21","author":"CC Teo","year":"2012","unstructured":"Teo, C.C., Bhatnagar, R., Graves, S.C.: An application of master schedule smoothing and planned lead time control. Prod. Oper. Manag. 21(2), 211\u2013223 (2012)","journal-title":"Prod. Oper. Manag."},{"issue":"23","key":"46_CR43","doi-asserted-by":"publisher","first-page":"6905","DOI":"10.1080\/00207543.2010.519000","volume":"49","author":"M Thuerer","year":"2011","unstructured":"Thuerer, M., Stevenson, M., Silva, C.: Three decades of workload control research: a systematic review of the literature. Int. J. Prod. Res. 49(23), 6905\u20136935 (2011)","journal-title":"Int. J. Prod. Res."},{"issue":"5","key":"46_CR44","doi-asserted-by":"publisher","first-page":"939","DOI":"10.1111\/j.1937-5956.2011.01307.x","volume":"21","author":"M Thuerer","year":"2012","unstructured":"Thuerer, M., Stevenson, M., Silva, C., Land, M.J., Fredendall, L.D.: Workload control and order release: a lean solution for make-to-order companies. Prod. Oper. Manag. 21(5), 939\u2013953 (2012)","journal-title":"Prod. Oper. Manag."},{"key":"46_CR45","unstructured":"Tsitsiklis, J.N., Van Roy, B.: Analysis of temporal-difference learning with function approximation. In: Advances in Neural Information Processing Systems, pp. 1075\u20131081 (1997)"},{"issue":"3","key":"46_CR46","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1007\/BF00992698","volume":"8","author":"CJCH Watkins","year":"1992","unstructured":"Watkins, C.J.C.H., Dayan, P.: Q-learning. Mach. Learn. 8(3), 279\u2013292 (1992). https:\/\/doi.org\/10.1007\/BF00992698","journal-title":"Mach. Learn."},{"key":"46_CR47","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-57743-7","volume-title":"Load-Oriented Manufacturing Control","author":"H Wiendahl","year":"1995","unstructured":"Wiendahl, H.: Load-Oriented Manufacturing Control, 1st edn. Springer, Berlin (1995). https:\/\/doi.org\/10.1007\/978-3-642-57743-7. http:\/\/books.google.at\/books-id=e66fmQEACAAJ","edition":"1"},{"issue":"1","key":"46_CR48","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1080\/21693277.2016.1192517","volume":"4","author":"T Wuest","year":"2016","unstructured":"Wuest, T., Weimer, D., Irgens, C., Thoben, K.D.: Machine learning in manufacturing: advantages, challenges, and applications. Prod. Manuf. Res. 4(1), 23\u201345 (2016). https:\/\/doi.org\/10.1080\/21693277.2016.1192517","journal-title":"Prod. Manuf. Res."},{"issue":"1","key":"46_CR49","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1287\/mnsc.33.1.95","volume":"33","author":"C Yano","year":"1987","unstructured":"Yano, C.: Setting planning lead times in serial production systems with earliness costs. Manag. Sci. 33(1), 95\u2013106 (1987)","journal-title":"Manag. Sci."},{"issue":"1","key":"46_CR50","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1109\/TSMCC.2006.876059","volume":"37","author":"GP Zhang","year":"2007","unstructured":"Zhang, G.P.: Avoiding pitfalls in neural network research. IEEE Trans. Syst. Man Cybern. Part C (Appl. Rev.) 37(1), 3\u201316 (2007)","journal-title":"IEEE Trans. Syst. Man Cybern. Part C (Appl. Rev.)"}],"container-title":["Lecture Notes in Computer Science","Machine Learning, Optimization, and Data Science"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-13709-0_46","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,7]],"date-time":"2024-03-07T15:01:18Z","timestamp":1709823678000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-13709-0_46"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030137083","9783030137090"],"references-count":50,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-13709-0_46","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"14 February 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"LOD","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Machine Learning, Optimization, and Data Science","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Volterra","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Italy","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2018","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"13 September 2018","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"16 September 2018","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"4","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"mod2018","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/lod2018.icas.xyz\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Double-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"easychair, in-house system","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"126","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"46","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"37% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"5","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"1.5","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}