{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T22:27:54Z","timestamp":1742941674347,"version":"3.40.3"},"publisher-location":"Cham","reference-count":64,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030160340"},{"type":"electronic","value":"9783030160357"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-16035-7_6","type":"book-chapter","created":{"date-parts":[[2019,3,14]],"date-time":"2019-03-14T12:30:46Z","timestamp":1552566646000},"page":"102-118","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["An Efficient Heuristic for Pooled Repair Shop Designs"],"prefix":"10.1007","author":[{"given":"Hasan H\u00fcseyin","family":"Turan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shaligram","family":"Pokharel","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tarek Y.","family":"ElMekkawy","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andrei","family":"Sleptchenko","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Maryam","family":"Al-Khatib","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,3,15]]},"reference":[{"key":"6_CR1","unstructured":"IATA\u2019s Maintenance Cost Task Force: Airline maintenance cost: executive commentary (2015). https:\/\/www.iata.org\/whatwedo\/workgroups\/Documents\/MCTF\/AMC-Exec-Comment-FY14.pdf . Accessed 30 Aug 2017"},{"issue":"2","key":"6_CR2","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1016\/j.ejor.2015.11.008","volume":"251","author":"MCO Keizer","year":"2016","unstructured":"Keizer, M.C.O., Teunter, R.H., Veldman, J.: Clustering condition-based maintenance for systems with redundancy and economic dependencies. Eur. J. Oper. Res. 251(2), 531\u2013540 (2016)","journal-title":"Eur. J. Oper. Res."},{"key":"6_CR3","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/j.ress.2015.09.016","volume":"145","author":"E L\u00f3pez-Santana","year":"2016","unstructured":"L\u00f3pez-Santana, E., Akhavan-Tabatabaei, R., Dieulle, L., Labadie, N., Medaglia, A.L.: On the combined maintenance and routing optimization problem. Reliab. Eng. Syst. Saf. 145, 199\u2013214 (2016)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"6_CR4","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1007\/978-1-4615-4329-9_2","volume-title":"Maintenance, Modeling and Optimization","author":"SO Duffuaa","year":"2000","unstructured":"Duffuaa, S.O.: Mathematical models in maintenance planning and scheduling. In: Ben-Daya, M., Duffuaa, S.O., Raouf, A. (eds.) Maintenance, Modeling and Optimization, pp. 39\u201353. Springer, Boston (2000). https:\/\/doi.org\/10.1007\/978-1-4615-4329-9_2"},{"issue":"1","key":"6_CR5","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1287\/opre.16.1.122","volume":"16","author":"CC Sherbrooke","year":"1968","unstructured":"Sherbrooke, C.C.: Metric: a multi-echelon technique for recoverable item control. Oper. Res. 16(1), 122\u2013141 (1968)","journal-title":"Oper. Res."},{"key":"6_CR6","doi-asserted-by":"publisher","DOI":"10.1007\/b109856","volume-title":"Optimal Inventory Modeling of Systems: Multi-echelon Techniques","author":"CC Sherbrooke","year":"2004","unstructured":"Sherbrooke, C.C.: Optimal Inventory Modeling of Systems: Multi-echelon Techniques, vol. 72. Springer, New York (2004). https:\/\/doi.org\/10.1007\/b109856"},{"issue":"1","key":"6_CR7","first-page":"34","volume":"19","author":"R Basten","year":"2014","unstructured":"Basten, R., Van Houtum, G.: System-oriented inventory models for spare parts. Surv. Oper. Res. Manag. Sci. 19(1), 34\u201355 (2014)","journal-title":"Surv. Oper. Res. Manag. Sci."},{"issue":"1","key":"6_CR8","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1016\/j.ejor.2016.06.003","volume":"256","author":"J Arts","year":"2017","unstructured":"Arts, J.: A multi-item approach to repairable stocking and expediting in a fluctuating demand environment. Eur. J. Oper. Res. 256(1), 102\u2013115 (2017)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"6_CR9","doi-asserted-by":"crossref","first-page":"480","DOI":"10.1016\/S0377-2217(96)00279-2","volume":"97","author":"A Diaz","year":"1997","unstructured":"Diaz, A., Fu, M.C.: Models for multi-echelon repairable item inventory systems with limited repair capacity. Eur. J. Oper. Res. 97(3), 480\u2013492 (1997)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"6_CR10","doi-asserted-by":"crossref","first-page":"781","DOI":"10.1016\/j.ejor.2008.08.006","volume":"199","author":"JA Rappold","year":"2009","unstructured":"Rappold, J.A., Van Roo, B.D.: Designing multi-echelon service parts networks with finite repair capacity. Eur. J. Oper. Res. 199(3), 781\u2013792 (2009)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"6_CR11","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1057\/palgrave.jors.2601511","volume":"54","author":"A Sleptchenko","year":"2003","unstructured":"Sleptchenko, A., Van der Heijden, M., Van Harten, A.: Trade-off between inventory and repair capacity in spare part networks. J. Oper. Res. Soc. 54(3), 263\u2013272 (2003)","journal-title":"J. Oper. Res. Soc."},{"key":"6_CR12","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1016\/j.cie.2017.01.020","volume":"106","author":"S Srivathsan","year":"2017","unstructured":"Srivathsan, S., Viswanathan, S.: A queueing-based optimization model for planning inventory of repaired components in a service center. Comput. Ind. Eng. 106, 373\u2013385 (2017)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"6_CR13","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1016\/S0925-5273(02)00155-X","volume":"79","author":"A Sleptchenko","year":"2002","unstructured":"Sleptchenko, A., Van der Heijden, M., Van Harten, A.: Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems. Int. J. Prod. Econ. 79(3), 209\u2013230 (2002)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"6_CR14","doi-asserted-by":"crossref","first-page":"260","DOI":"10.1016\/j.ijpe.2008.08.058","volume":"118","author":"KS Smidt-Destombes de","year":"2009","unstructured":"de Smidt-Destombes, K.S., van der Heijden, M.C., van Harten, A.: Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-n systems. Int. J. Prod. Econ. 118(1), 260\u2013268 (2009)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"6_CR15","doi-asserted-by":"crossref","first-page":"404","DOI":"10.1016\/j.ijpe.2006.08.013","volume":"107","author":"KS Smidt-Destombes de","year":"2007","unstructured":"de Smidt-Destombes, K.S., van der Heijden, M.C., van Harten, A.: Availability of k-out-of-n systems under block replacement sharing limited spares and repair capacity. Int. J. Prod. Econ. 107(2), 404\u2013421 (2007)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"6_CR16","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1016\/j.ejor.2005.02.043","volume":"174","author":"KS Smidt-Destombes de","year":"2006","unstructured":"de Smidt-Destombes, K.S., van der Heijden, M.C., Van Harten, A.: On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-n system with wear-out. Eur. J. Oper. Res. 174(1), 182\u2013200 (2006)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"6_CR17","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/j.ress.2003.10.004","volume":"83","author":"KS Smidt-Destombes de","year":"2004","unstructured":"de Smidt-Destombes, K.S., van der Heijden, M.C., van Harten, A.: On the availability of a k-out-of-n system given limited spares and repair capacity under a condition based maintenance strategy. Reliab. Eng. Syst. Saf. 83(3), 287\u2013300 (2004)","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"1","key":"6_CR18","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1504\/IJIR.2008.019209","volume":"1","author":"HC Lau","year":"2008","unstructured":"Lau, H.C., Song, H.: Multi-echelon repairable item inventory system with limited repair capacity under nonstationary demands. Int. J. Inventory Res. 1(1), 67\u201392 (2008)","journal-title":"Int. J. Inventory Res."},{"issue":"1","key":"6_CR19","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1504\/IJOR.2015.070861","volume":"24","author":"H Yoon","year":"2015","unstructured":"Yoon, H., Jung, S., Lee, S.: The effect analysis of multi-echelon inventory models considering demand rate uncertainty and limited maintenance capacity. Int. J. Oper. Res. 24(1), 38\u201358 (2015)","journal-title":"Int. J. Oper. Res."},{"key":"6_CR20","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1016\/j.procir.2014.01.064","volume":"17","author":"K Tracht","year":"2014","unstructured":"Tracht, K., Funke, L., Schneider, D.: Varying repair capacity in a repairable item system. Procedia CIRP 17, 446\u2013450 (2014)","journal-title":"Procedia CIRP"},{"key":"6_CR21","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1007\/978-3-319-22288-2_12","volume-title":"Logistics and Supply Chain Innovation","author":"MA Driessen","year":"2016","unstructured":"Driessen, M.A., Rustenburg, J.W., van Houtum, G.J., Wiers, V.C.S.: Connecting inventory and repair shop control for repairable items. In: Zijm, H., Klumpp, M., Clausen, U., Hompel, M. (eds.) Logistics and Supply Chain Innovation, pp. 199\u2013221. Springer, Cham (2016). https:\/\/doi.org\/10.1007\/978-3-319-22288-2_12"},{"issue":"4","key":"6_CR22","doi-asserted-by":"crossref","first-page":"577","DOI":"10.1287\/mnsc.41.4.577","volume":"41","author":"WC Jordan","year":"1995","unstructured":"Jordan, W.C., Graves, S.C.: Principles on the benefits of manufacturing process flexibility. Manage. Sci. 41(4), 577\u2013594 (1995)","journal-title":"Manage. Sci."},{"issue":"10","key":"6_CR23","doi-asserted-by":"crossref","first-page":"953","DOI":"10.1080\/07408170490487713","volume":"36","author":"WC Jordan","year":"2004","unstructured":"Jordan, W.C., Inman, R.R., Blumenfeld, D.E.: Chained cross-training of workers for robust performance. IIE Trans. 36(10), 953\u2013967 (2004)","journal-title":"IIE Trans."},{"issue":"6","key":"6_CR24","doi-asserted-by":"crossref","first-page":"1423","DOI":"10.1287\/opre.1120.1107","volume":"60","author":"A Bassamboo","year":"2012","unstructured":"Bassamboo, A., Randhawa, R.S., Mieghem, J.A.V.: A little flexibility is all you need: on the asymptotic value of flexible capacity in parallel queuing systems. Oper. Res. 60(6), 1423\u20131435 (2012)","journal-title":"Oper. Res."},{"issue":"2","key":"6_CR25","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1111\/j.1540-5915.1998.tb01586.x","volume":"29","author":"MJ Brusco","year":"1998","unstructured":"Brusco, M.J., Johns, T.R.: Staffing a multiskilled workforce with varying levels of productivity: an analysis of cross-training policies*. Decis. Sci. 29(2), 499\u2013515 (1998)","journal-title":"Decis. Sci."},{"issue":"5","key":"6_CR26","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1080\/07408170701598124","volume":"40","author":"MJ Brusco","year":"2008","unstructured":"Brusco, M.J.: An exact algorithm for a workforce allocation problem with application to an analysis of cross-training policies. IIE Trans. 40(5), 495\u2013508 (2008)","journal-title":"IIE Trans."},{"issue":"1","key":"6_CR27","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1287\/opre.1080.0664","volume":"58","author":"MC Chou","year":"2010","unstructured":"Chou, M.C., Chua, G.A., Teo, C.P., Zheng, H.: Design for process flexibility: efficiency of the long chain and sparse structure. Oper. Res. 58(1), 43\u201358 (2010)","journal-title":"Oper. Res."},{"issue":"1","key":"6_CR28","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1287\/msom.2.1.32.23268","volume":"2","author":"EJ Pinker","year":"2000","unstructured":"Pinker, E.J., Shumsky, R.A.: The efficiency-quality trade-off of cross-trained workers. Manuf. Serv. Oper. Manag. 2(1), 32\u201348 (2000)","journal-title":"Manuf. Serv. Oper. Manag."},{"issue":"1","key":"6_CR29","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/11-SSY033","volume":"2","author":"JN Tsitsiklis","year":"2012","unstructured":"Tsitsiklis, J.N., Xu, K., et al.: On the power of (even a little) resource pooling. Stoch. Syst. 2(1), 1\u201366 (2012)","journal-title":"Stoch. Syst."},{"issue":"5","key":"6_CR30","doi-asserted-by":"crossref","first-page":"1144","DOI":"10.1111\/poms.12009","volume":"22","author":"S Andrad\u00f3ttir","year":"2013","unstructured":"Andrad\u00f3ttir, S., Ayhan, H., Down, D.G.: Design principles for flexible systems. Prod. Oper. Manag. 22(5), 1144\u20131156 (2013)","journal-title":"Prod. Oper. Manag."},{"issue":"1","key":"6_CR31","first-page":"19","volume":"20","author":"R Qin","year":"2015","unstructured":"Qin, R., Nembhard, D.A., Barnes II, W.L.: Workforce flexibility in operations management. Surv. Oper. Res. Manag. Sci. 20(1), 19\u201333 (2015)","journal-title":"Surv. Oper. Res. Manag. Sci."},{"issue":"1","key":"6_CR32","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1287\/mnsc.1030.0166","volume":"50","author":"WJ Hopp","year":"2004","unstructured":"Hopp, W.J., Tekin, E., Van Oyen, M.P.: Benefits of skill chaining in serial production lines with cross-trained workers. Manage. Sci. 50(1), 83\u201398 (2004)","journal-title":"Manage. Sci."},{"issue":"5\u20138","key":"6_CR33","doi-asserted-by":"crossref","first-page":"937","DOI":"10.1007\/s00170-013-5027-5","volume":"69","author":"C Liu","year":"2013","unstructured":"Liu, C., Yang, N., Li, W., Lian, J., Evans, S., Yin, Y.: Training and assignment of multi-skilled workers for implementing seru production systems. Int. J. Adv. Manuf. Technol. 69(5\u20138), 937\u2013959 (2013)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"3","key":"6_CR34","doi-asserted-by":"crossref","first-page":"1643","DOI":"10.1016\/j.ejor.2005.10.045","volume":"176","author":"S Say\u0131n","year":"2007","unstructured":"Say\u0131n, S., Karabat\u0131, S.: Assigning cross-trained workers to departments: a two-stage optimization model to maximize utility and skill improvement. Eur. J. Oper. Res. 176(3), 1643\u20131658 (2007)","journal-title":"Eur. J. Oper. Res."},{"issue":"10","key":"6_CR35","doi-asserted-by":"crossref","first-page":"919","DOI":"10.1080\/07408170490487759","volume":"36","author":"WJ Hopp","year":"2004","unstructured":"Hopp, W.J., Oyen, M.P.: Agile workforce evaluation: a framework for cross-training and coordination. IIE Trans. 36(10), 919\u2013940 (2004)","journal-title":"IIE Trans."},{"issue":"11","key":"6_CR36","doi-asserted-by":"crossref","first-page":"981","DOI":"10.1080\/0951192X.2012.684708","volume":"25","author":"Q Li","year":"2012","unstructured":"Li, Q., Gong, J., Fung, R.Y., Tang, J.: Multi-objective optimal cross-training configuration models for an assembly cell using non-dominated sorting genetic algorithm-II. Int. J. Comput. Integr. Manuf. 25(11), 981\u2013995 (2012)","journal-title":"Int. J. Comput. Integr. Manuf."},{"issue":"10","key":"6_CR37","doi-asserted-by":"crossref","first-page":"1899","DOI":"10.1080\/00207540410001666224","volume":"42","author":"RR Inman","year":"2004","unstructured":"Inman, R.R., Jordan, W.C., Blumenfeld, D.E.: Chained cross-training of assembly line workers. Int. J. Prod. Res. 42(10), 1899\u20131910 (2004)","journal-title":"Int. J. Prod. Res."},{"issue":"18","key":"6_CR38","doi-asserted-by":"crossref","first-page":"4651","DOI":"10.1080\/00207540210158014","volume":"40","author":"M Tiwari","year":"2002","unstructured":"Tiwari, M., Roy, D.: Application of an evolutionary fuzzy system for the estimation of workforce deployment and cross-training in an assembly environment. Int. J. Prod. Res. 40(18), 4651\u20134674 (2002)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"6_CR39","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1287\/msom.1.2.112","volume":"1","author":"G Vairaktarakis","year":"1999","unstructured":"Vairaktarakis, G., Winch, J.K.: Worker cross-training in paced assembly lines. Manuf. Serv. Oper. Manag. 1(2), 112\u2013131 (1999)","journal-title":"Manuf. Serv. Oper. Manag."},{"issue":"3","key":"6_CR40","doi-asserted-by":"crossref","first-page":"609","DOI":"10.1016\/j.cie.2003.03.004","volume":"48","author":"J Slomp","year":"2005","unstructured":"Slomp, J., Bokhorst, J.A., Molleman, E.: Cross-training in a cellular manufacturing environment. Comput. Ind. Eng. 48(3), 609\u2013624 (2005)","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"6_CR41","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1287\/mnsc.1040.0333","volume":"51","author":"SM Iravani","year":"2005","unstructured":"Iravani, S.M., Van Oyen, M.P., Sims, K.T.: Structural flexibility: a new perspective on the design of manufacturing and service operations. Manage. Sci. 51(2), 151\u2013166 (2005)","journal-title":"Manage. Sci."},{"issue":"10","key":"6_CR42","doi-asserted-by":"crossref","first-page":"969","DOI":"10.1080\/07408170490496209","volume":"36","author":"JA Bokhorst","year":"2004","unstructured":"Bokhorst, J.A., Slomp, J., Molleman, E.: Development and evaluation of cross-training policies for manufacturing teams. IIE Trans. 36(10), 969\u2013984 (2004)","journal-title":"IIE Trans."},{"issue":"1","key":"6_CR43","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1016\/j.ijpe.2012.05.017","volume":"141","author":"M Schneider","year":"2013","unstructured":"Schneider, M., Grahl, J., Francas, D., Vigo, D.: A problem-adjusted genetic algorithm for flexibility design. Int. J. Prod. Econ. 141(1), 56\u201365 (2013)","journal-title":"Int. J. Prod. Econ."},{"issue":"4","key":"6_CR44","doi-asserted-by":"crossref","first-page":"276","DOI":"10.1287\/msom.1050.0086","volume":"7","author":"RB Wallace","year":"2005","unstructured":"Wallace, R.B., Whitt, W.: A staffing algorithm for call centers with skill-based routing. Manuf. Serv. Oper. Manag. 7(4), 276\u2013294 (2005)","journal-title":"Manuf. Serv. Oper. Manag."},{"key":"6_CR45","doi-asserted-by":"crossref","unstructured":"Ahghari, M., Balcio\u011dlu, B.: Benefits of cross-training in a skill-based routing contact center with priority queues and impatient customers. IIE Trans. 41(6), 524\u2013536 (2009)","DOI":"10.1080\/07408170802432975"},{"key":"6_CR46","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1016\/j.ijpe.2014.09.025","volume":"159","author":"B Legros","year":"2015","unstructured":"Legros, B., Jouini, O., Dallery, Y.: A flexible architecture for call centers with skill-based routing. Int. J. Prod. Econ. 159, 192\u2013207 (2015)","journal-title":"Int. J. Prod. Econ."},{"issue":"6","key":"6_CR47","doi-asserted-by":"crossref","first-page":"546","DOI":"10.1080\/07408170802512586","volume":"41","author":"E Tekin","year":"2009","unstructured":"Tekin, E., Hopp, W.J., Van Oyen, M.P.: Pooling strategies for call center agent cross-training. IIE Trans. 41(6), 546\u2013561 (2009)","journal-title":"IIE Trans."},{"issue":"5","key":"6_CR48","doi-asserted-by":"crossref","first-page":"768","DOI":"10.1057\/jors.2009.43","volume":"61","author":"PR Harper","year":"2010","unstructured":"Harper, P.R., Powell, N., Williams, J.E.: Modelling the size and skill-mix of hospital nursing teams. J. Oper. Res. Soc. 61(5), 768\u2013779 (2010)","journal-title":"J. Oper. Res. Soc."},{"issue":"1","key":"6_CR49","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1023\/A:1019019308016","volume":"2","author":"LLX Li","year":"1999","unstructured":"Li, L.L.X., King, B.E.: A healthcare staff decision model considering the effects of staff cross-training. Health Care Manag. Sci. 2(1), 53\u201361 (1999)","journal-title":"Health Care Manag. Sci."},{"issue":"11","key":"6_CR50","doi-asserted-by":"crossref","first-page":"1622","DOI":"10.1057\/jors.2012.158","volume":"64","author":"D Simmons","year":"2013","unstructured":"Simmons, D.: The effect of non-linear delay costs on workforce mix. J. Oper. Res. Soc. 64(11), 1622\u20131629 (2013)","journal-title":"J. Oper. Res. Soc."},{"issue":"2","key":"6_CR51","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1111\/j.00117315.2004.02642.x","volume":"35","author":"SR Agnihothri","year":"2004","unstructured":"Agnihothri, S.R., Mishra, A.K.: Cross-training decisions in field services with three job types and server-job mismatch. Decis. Sci. 35(2), 239\u2013257 (2004)","journal-title":"Decis. Sci."},{"key":"6_CR52","doi-asserted-by":"crossref","first-page":"410","DOI":"10.1057\/palgrave.jors.2601535","volume":"54","author":"S Agnihothri","year":"2003","unstructured":"Agnihothri, S., Mishra, A., Simmons, D.: Workforce cross-training decisions in field service systems with two job types. J. Oper. Res. Soc. 54, 410\u2013418 (2003)","journal-title":"J. Oper. Res. Soc."},{"issue":"1","key":"6_CR53","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.ijpe.2012.03.003","volume":"138","author":"P Colen","year":"2012","unstructured":"Colen, P., Lambrecht, M.: Cross-training policies in field services. Int. J. Prod. Econ. 138(1), 76\u201388 (2012)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"6_CR54","doi-asserted-by":"crossref","first-page":"168","DOI":"10.1287\/msom.1060.0132","volume":"9","author":"SM Iravani","year":"2007","unstructured":"Iravani, S.M., Krishnamurthy, V.: Workforce agility in repair and maintenance environments. Manuf. Serv. Oper. Manag. 9(2), 168\u2013184 (2007)","journal-title":"Manuf. Serv. Oper. Manag."},{"issue":"1","key":"6_CR55","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2014.10.038","volume":"243","author":"P Bruecker De","year":"2015","unstructured":"De Bruecker, P., Van den Bergh, J., Beli\u00ebn, J., Demeulemeester, E.: Workforce planning incorporating skills: state of the art. Eur. J. Oper. Res. 243(1), 1\u201316 (2015)","journal-title":"Eur. J. Oper. Res."},{"key":"6_CR56","doi-asserted-by":"publisher","unstructured":"Sleptchenko, A., Turan, H.H., Pokharel, S., ElMekkawy, T.Y.: Cross training policies for repair shops with spare part inventories. Int. J. Prod. Econ. (2018). https:\/\/doi.org\/10.1016\/j.ijpe.2017.12.018","DOI":"10.1016\/j.ijpe.2017.12.018"},{"key":"6_CR57","doi-asserted-by":"crossref","unstructured":"Turan, H.H., Pokharel, S., Sleptchenko, A., ElMekkawy, T.Y.: Integrated optimization for stock levels and cross-training schemes with simulation-based genetic algorithm. In: International Conference on Computational Science and Computational Intelligence, pp. 1158\u20131163 (2016)","DOI":"10.1109\/CSCI.2016.0219"},{"key":"6_CR58","doi-asserted-by":"crossref","unstructured":"Sleptchenko, A., Elmekkawy, T.Y., Turan, H.H., Pokharel, S.: Simulation based particle swarm optimization of cross-training policies in spare parts supply systems. In: The Ninth International Conference on Advanced Computational Intelligence (ICACI 2017), pp. 60\u201365 (2017)","DOI":"10.1109\/ICACI.2017.7974486"},{"key":"6_CR59","doi-asserted-by":"crossref","unstructured":"Al-Khatib, M., Turan, H.H., Sleptchenko, A.: Optimal skill assignment with modular architecture in spare parts supply systems. In: 4th International Conference on Industrial Engineering and Applications (ICIEA), pp. 136\u2013140. IEEE (2017)","DOI":"10.1109\/IEA.2017.7939194"},{"key":"6_CR60","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1016\/j.cie.2018.08.032","volume":"125","author":"HH Turan","year":"2018","unstructured":"Turan, H.H., Sleptchenko, A., Pokharel, S., ElMekkawy, T.Y.: A clustering-based repair shop design for repairable spare part supply systems. Comput. Ind. Eng. 125, 232\u2013244 (2018)","journal-title":"Comput. Ind. Eng."},{"key":"6_CR61","doi-asserted-by":"crossref","unstructured":"Turan, H.H., Pokharel, S., Sleptchenko, A., ElMekkawy, T.Y., Al-Khatib, M.: A pooling strategy for flexible repair shop designs. In: Proceedings of the 7th International Conference on Operations Research and Enterprise Systems, pp. 272\u2013278 (2018)","DOI":"10.5220\/0006632502720278"},{"issue":"4","key":"6_CR62","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1023\/A:1023209813523","volume":"43","author":"A Harten Van","year":"2003","unstructured":"Van Harten, A., Sleptchenko, A.: On Markovian multi-class, multi-server queueing. Queueing Syst. 43(4), 307\u2013328 (2003)","journal-title":"Queueing Syst."},{"issue":"2","key":"6_CR63","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1080\/07408178508975280","volume":"17","author":"T Altiok","year":"1985","unstructured":"Altiok, T.: On the phase-type approximations of general distributions. IIE Trans. 17(2), 110\u2013116 (1985)","journal-title":"IIE Trans."},{"issue":"3","key":"6_CR64","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1016\/j.orl.2003.09.001","volume":"32","author":"M Heijden Van Der","year":"2004","unstructured":"Van Der Heijden, M., Van Harten, A., Sleptchenko, A.: Approximations for Markovian multi-class queues with preemptive priorities. Oper. Res. Lett. 32(3), 273\u2013282 (2004)","journal-title":"Oper. Res. Lett."}],"container-title":["Communications in Computer and Information Science","Operations Research and Enterprise Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-16035-7_6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,15]],"date-time":"2024-07-15T20:07:38Z","timestamp":1721074058000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-16035-7_6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030160340","9783030160357"],"references-count":64,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-16035-7_6","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"15 March 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICORES","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Operations Research and Enterprise Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Funchal","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Portugal","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2018","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"24 January 2018","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"26 January 2018","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"7","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"icores2018","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.icores.org\/?y=2018","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}