{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,11]],"date-time":"2024-09-11T07:02:42Z","timestamp":1726038162872},"publisher-location":"Cham","reference-count":13,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030263683"},{"type":"electronic","value":"9783030263690"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-26369-0_21","type":"book-chapter","created":{"date-parts":[[2019,7,18]],"date-time":"2019-07-18T16:02:47Z","timestamp":1563465767000},"page":"220-231","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Ant Colony Algorithm Based Scheduling with Lot-Sizing for Printed Circuit Board Assembly Shop"],"prefix":"10.1007","author":[{"given":"Zilong","family":"Zhuang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zizhao","family":"Huang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Daili","family":"Song","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wei","family":"Qin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,7,19]]},"reference":[{"key":"21_CR1","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1016\/S0377-2217(99)00348-3","volume":"128","author":"P Ji","year":"2001","unstructured":"Ji, P., Sze, M.T., Lee, W.B.: A genetic algorithm of determining cycle time for printed circuit board assembly lines. Eur. J. Oper. Res. 128, 175\u2013184 (2001)","journal-title":"Eur. J. Oper. Res."},{"key":"21_CR2","doi-asserted-by":"publisher","first-page":"2","DOI":"10.1016\/j.dam.2015.03.009","volume":"192","author":"AF Alkaya","year":"2015","unstructured":"Alkaya, A.F., Duman, E.: Combining and solving sequence dependent traveling salesman and quadratic assignment problems in PCB assembly. Discrete Appl. Math. 192, 2\u201316 (2015)","journal-title":"Discrete Appl. Math."},{"issue":"9","key":"21_CR3","doi-asserted-by":"publisher","first-page":"815","DOI":"10.1080\/0951192X.2018.1429667","volume":"31","author":"A T\u00f3th","year":"2018","unstructured":"T\u00f3th, A., Knuutila, T., Nevalainen, O.S.: Machine configuration and workload balancing of modular placement machines in multi-product PCB assembly. Int. J. Comput. Integr. Manuf. 31(9), 815\u2013830 (2018)","journal-title":"Int. J. Comput. Integr. Manuf."},{"issue":"3\u20134","key":"21_CR4","doi-asserted-by":"publisher","first-page":"333","DOI":"10.1016\/0272-6963(86)90008-2","volume":"6","author":"WG Truscott","year":"1986","unstructured":"Truscott, W.G.: Production scheduling with capacity-constrained transportation activities. J. Oper. Manag. 6(3\u20134), 333\u2013348 (1986)","journal-title":"J. Oper. Manag."},{"key":"21_CR5","doi-asserted-by":"publisher","first-page":"642","DOI":"10.1016\/j.asoc.2017.04.062","volume":"57","author":"RH Huang","year":"2017","unstructured":"Huang, R.H., Yu, T.H.: An effective ant colony optimization algorithm for multi-objective job-shop scheduling with equal-size lot-splitting. Appl. Soft Comput. 57, 642\u2013656 (2017)","journal-title":"Appl. Soft Comput."},{"key":"21_CR6","doi-asserted-by":"crossref","unstructured":"Wang, S., Kurz, M., Mason, S.J., et al.: Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups. Int. J. Prod. Res., 1\u201315 (2019)","DOI":"10.1080\/00207543.2019.1571251"},{"issue":"5","key":"21_CR7","doi-asserted-by":"publisher","first-page":"1399","DOI":"10.1016\/j.cor.2004.09.034","volume":"33","author":"H Allaoui","year":"2006","unstructured":"Allaoui, H., Artiba, A.: Scheduling two-stage hybrid flow shop with availability constraints. Comput. Oper. Res. 33(5), 1399\u20131429 (2006)","journal-title":"Comput. Oper. Res."},{"issue":"4","key":"21_CR8","doi-asserted-by":"publisher","first-page":"1452","DOI":"10.1016\/j.cie.2008.09.004","volume":"56","author":"V Yaurima","year":"2009","unstructured":"Yaurima, V., Burtseva, L., Tchernykh, A.: Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers. Comput. Ind. Eng. 56(4), 1452\u20131463 (2009)","journal-title":"Comput. Ind. Eng."},{"issue":"1\u20132","key":"21_CR9","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1007\/s00170-008-1577-3","volume":"42","author":"M Gholami","year":"2009","unstructured":"Gholami, M., Zandieh, M., Alem-Tabriz, A.: Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns. Int. J. Adv. Manuf. Technol. 42(1\u20132), 189\u2013201 (2009)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"2","key":"21_CR10","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1504\/IJOR.2017.083959","volume":"29","author":"H Seidgar","year":"2017","unstructured":"Seidgar, H., Rad, S.T., Shafaei, R.: Scheduling of assembly flow shop problem and machines with random breakdowns. Int. J. Oper. Res. 29(2), 273\u2013293 (2017)","journal-title":"Int. J. Oper. Res."},{"key":"21_CR11","first-page":"1","volume":"99","author":"Y Han","year":"2017","unstructured":"Han, Y., Gong, D., Jin, Y., et al.: Evolutionary multiobjective blocking lot-streaming flow shop scheduling with machine breakdowns. IEEE Trans. Cybern. 99, 1\u201314 (2017)","journal-title":"IEEE Trans. Cybern."},{"key":"21_CR12","unstructured":"Dorigo, M.: Optimization, learning and natural algorithms. Ph.D. Thesis, Politecnico di Milano (1992)"},{"issue":"6","key":"21_CR13","doi-asserted-by":"publisher","first-page":"693","DOI":"10.1007\/s10845-009-0246-1","volume":"21","author":"JP Arnaout","year":"2010","unstructured":"Arnaout, J.P., Rabadi, G., Musa, R.: A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. J. Intell. Manuf. 21(6), 693\u2013701 (2010)","journal-title":"J. Intell. Manuf."}],"container-title":["Lecture Notes in Computer Science","Advances in Swarm Intelligence"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-26369-0_21","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,18]],"date-time":"2019-07-18T16:16:21Z","timestamp":1563466581000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-26369-0_21"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030263683","9783030263690"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-26369-0_21","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"19 July 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICSI","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Swarm Intelligence","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Chiang Mai","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Thailand","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"26 July 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"30 July 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"10","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"swarm2019a","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.ic-si.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}