{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,10]],"date-time":"2026-04-10T14:38:19Z","timestamp":1775831899758,"version":"3.50.1"},"publisher-location":"Cham","reference-count":15,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030269685","type":"print"},{"value":"9783030269692","type":"electronic"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-26969-2_63","type":"book-chapter","created":{"date-parts":[[2019,7,30]],"date-time":"2019-07-30T23:09:48Z","timestamp":1564528188000},"page":"669-677","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Single-Machine Green Scheduling Problem of Multi-speed Machine"],"prefix":"10.1007","author":[{"given":"Ai","family":"Yang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bin","family":"Qian","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rong","family":"Hu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ling","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shang-Han","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,7,24]]},"reference":[{"key":"63_CR1","unstructured":"Wang, L., Wang, J., Wu, C.: Research progress in green shop scheduling optimization. Control Decis. (2018). Gong, H., Tang, L., Duin, C.W.: A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times. Comput. Oper. Res. 37(5), 960\u2013969 (2010)"},{"key":"63_CR2","unstructured":"Che, A., Lv, K., Levner, E., et al.: Energy consumption minimization for single machine scheduling with bounded maximum tardiness. In: IEEE, International Conference on Networking, Sensing and Control, pp. 146\u2013150. IEEE (2015). Fang, K., Uhan, N.A., Zhao, F., Sutherland, J.W.: Flow shop scheduling with peak power consumption constraints. Ann. Oper. Res. 206(1), 115\u2013145 (2013)"},{"issue":"2","key":"63_CR3","doi-asserted-by":"publisher","first-page":"105","DOI":"10.1080\/19397030802257236","volume":"1","author":"Gilles Mouzon","year":"2008","unstructured":"Mouzon, G., Yildirim, M.: A framework to minimise total energy consumption and total tardiness on a single machine. Int. J. Sustain. Eng. 1(2), 105\u2013116 (2008). Liu, C.H., Huang, D.H.: Reduction of power consumption and carbon footprints by applying multi-objective optimisation via genetic algorithms. Int. J. Prod. Res. 52(2), 337\u2013352 (2014)","journal-title":"International Journal of Sustainable Engineering"},{"key":"63_CR4","doi-asserted-by":"publisher","first-page":"105","DOI":"10.1016\/j.rcim.2015.10.010","volume":"43","author":"YC Wang","year":"2017","unstructured":"Wang, Y.C., Wang, M.J., Lin, S.C.: Selection of cutting conditions for power constrained parallel machine scheduling. Robot. Comput. Integr. Manuf. 43, 105\u2013110 (2017)","journal-title":"Robot. Comput. Integr. Manuf."},{"issue":"2","key":"63_CR5","first-page":"60","volume":"16","author":"H Bin","year":"2011","unstructured":"Bin, H.: Research on parallel machine scheduling considering machine switch. Ind. Eng. Manage. 16(2), 60\u201364 (2011)","journal-title":"Ind. Eng. Manage."},{"key":"63_CR6","unstructured":"Wu, X., Sun, Y.: Green scheduling problem of flexible job shop with multiple speeds of machine. Comput. Integr. Manuf. Syst. 24(4) (2018)"},{"issue":"3","key":"63_CR7","doi-asserted-by":"publisher","first-page":"758","DOI":"10.1016\/j.ejor.2015.05.019","volume":"248","author":"JY Ding","year":"2015","unstructured":"Ding, J.Y., Song, S., Wu, C.: Carbon-efficient scheduling of flow shops by multi-objective optimization. Eur. J. Oper. Res. 248(3), 758\u2013771 (2015)","journal-title":"Eur. J. Oper. Res."},{"key":"63_CR8","doi-asserted-by":"publisher","first-page":"3361","DOI":"10.1016\/j.jclepro.2015.09.097","volume":"112","author":"R Zhang","year":"2016","unstructured":"Zhang, R., Chiong, R.: Solving the energy-efficient job shop scheduling problem: a multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption. J. Clean. Prod. 112, 3361\u20133375 (2016)","journal-title":"J. Clean. Prod."},{"issue":"4","key":"63_CR9","first-page":"1072","volume":"34","author":"Z Guohui","year":"2017","unstructured":"Guohui, Z., Shijie, D.: Research on low carbon flexible job shop scheduling problem considering machine speed. J. Comput. Appl. 34(4), 1072\u20131075 (2017)","journal-title":"J. Comput. Appl."},{"issue":"2","key":"63_CR10","first-page":"16","volume":"4","author":"P Guo","year":"2017","unstructured":"Guo, P., Cheng, W., Wang, Y.: Scheduling step-deteriorating jobs to minimise the total weighted tardiness on a single machine. Int. J. Syst. Sci. Oper. Logistics 4(2), 16 (2017)","journal-title":"Int. J. Syst. Sci. Oper. Logistics"},{"issue":"4","key":"63_CR11","doi-asserted-by":"publisher","first-page":"481","DOI":"10.1007\/s10845-009-0309-3","volume":"22","author":"T \u00c7akar","year":"2011","unstructured":"\u00c7akar, T.: Single machine scheduling with unequal release date using neuro-dominance rule. J. Intell. Manuf. 22(4), 481\u2013490 (2011)","journal-title":"J. Intell. Manuf."},{"issue":"1","key":"63_CR12","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/0377-2217(93)90236-G","volume":"70","author":"Chuen-Lung Chen","year":"1993","unstructured":"Chen, C.L., Bulfin, R.L.: Complexity of single machine, multi-criteria scheduling problems. Eur. J. Oper. Res. 70(1), 115\u2013125 (1993)","journal-title":"European Journal of Operational Research"},{"key":"63_CR13","unstructured":"Zhong, T., Xiao, W., Xu, H., et al.: Hybrid evolutionary algorithm for single-machine scheduling problem with preparation time. J. Comput. Appl. 30(11), 3248\u20133252 (2013)"},{"key":"63_CR14","unstructured":"Ye, Q.: Research on a class of single machine scheduling problem based on improved ant colony algorithm. Hefei University of Technology (2008)"},{"issue":"6","key":"63_CR15","first-page":"1063","volume":"32","author":"J Wang","year":"2017","unstructured":"Wang, J.: Sustainable machine scheduling problem with minimizing carbon emissions. Control Decis. 32(6), 1063\u20131068 (2017)","journal-title":"Control Decis."}],"container-title":["Lecture Notes in Computer Science","Intelligent Computing Theories and Application"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-26969-2_63","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,30]],"date-time":"2019-07-30T23:22:37Z","timestamp":1564528957000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-26969-2_63"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030269685","9783030269692"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-26969-2_63","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"24 July 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICIC","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Intelligent Computing","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Nanchang","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"China","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3 August 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"6 August 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"15","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"icic2019","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/ic-ic.tongji.edu.cn\/2019\/index.htm","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}