{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T17:02:57Z","timestamp":1743094977546,"version":"3.40.3"},"publisher-location":"Cham","reference-count":18,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030299958"},{"type":"electronic","value":"9783030299965"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-29996-5_25","type":"book-chapter","created":{"date-parts":[[2019,8,23]],"date-time":"2019-08-23T10:02:35Z","timestamp":1566554555000},"page":"212-222","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Efficient Heuristic Solution Methodologies for Scheduling Batch Processor with Incompatible Job-Families, Non-identical Job-Sizes and Non-identical Job-Dimensions"],"prefix":"10.1007","author":[{"given":"M.","family":"Mathirajan","sequence":"first","affiliation":[]},{"given":"M.","family":"Ramasubramanian","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2019,8,24]]},"reference":[{"key":"25_CR1","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1016\/j.jmsy.2017.12.005","volume":"46","author":"A Baykasoglu","year":"2018","unstructured":"Baykasoglu, A., Ozsoydan, F.B.: Dynamic scheduling of parallel heat treatment furnaces: a case study at a manufacturing system. J. Manuf. Syst. 46, 152\u2013162 (2018)","journal-title":"J. Manuf. Syst."},{"issue":"2","key":"25_CR2","first-page":"175","volume":"10","author":"SH Cheragh","year":"2003","unstructured":"Cheragh, S.H., Vishwaram, V., Krishnan, K.K.: Scheduling a single batch processing machine with disagreeable ready times and due dates. Int. J. Ind. Eng.-Theor. Appl. Pract. 10(2), 175\u2013187 (2003)","journal-title":"Int. J. Ind. Eng.-Theor. Appl. Pract."},{"issue":"9\u201312","key":"25_CR3","doi-asserted-by":"publisher","first-page":"1563","DOI":"10.1007\/s00170-013-5324-z","volume":"70","author":"R Gokhale","year":"2014","unstructured":"Gokhale, R., Mathirajan, M.: Minimizing total weighted tardiness on heterogeneous batch processors with incompatible job families. Int. J. Adv. Manuf. Technol. 70(9\u201312), 1563\u20131578 (2014)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"25_CR4","doi-asserted-by":"crossref","unstructured":"Huang, J., Liu, J.J.: Hierarchical production planning and real-time control for parallel batch machines in a flow shop with incompatible jobs. Mathematical Problems in Engineering (2018). https:\/\/www.hindawi.com\/journals\/mpe\/2018\/7268578\/abs\/. Accessed on 24 May 2019","DOI":"10.1155\/2018\/7268578"},{"key":"25_CR5","doi-asserted-by":"publisher","first-page":"425","DOI":"10.1016\/j.cie.2017.09.037","volume":"113","author":"M Hulett","year":"2017","unstructured":"Hulett, M., Damodaran, P., Amouie, M.: scheduling non-identical parallel batch processing machines to minimize total weighted tardiness using particle swarm optimization. Comput. Ind. Eng. 113, 425\u2013436 (2017)","journal-title":"Comput. Ind. Eng."},{"key":"25_CR6","doi-asserted-by":"publisher","first-page":"395","DOI":"10.1016\/j.asoc.2015.09.056","volume":"38","author":"Z Jia","year":"2016","unstructured":"Jia, Z., Wang, C., Leung, J.Y.: An ACO algorithm for makespan minimization in parallel batch machines with non-identical job sizes and incompatible job families. Appl. Soft Comput. 38, 395\u2013404 (2016)","journal-title":"Appl. Soft Comput."},{"issue":"1","key":"25_CR7","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/j.ijpe.2004.10.001","volume":"98","author":"SG Koh","year":"2005","unstructured":"Koh, S.G., Koo, P.H., Kim, D.C., Hur, W.S.: Scheduling a single batch processing machine with arbitrary job sizes and incompatible job families. Int. J. Prod. Econ. 98(1), 81\u201396 (2005)","journal-title":"Int. J. Prod. Econ."},{"issue":"10","key":"25_CR8","doi-asserted-by":"publisher","first-page":"3016","DOI":"10.1016\/j.cor.2005.11.011","volume":"34","author":"S Malve","year":"2007","unstructured":"Malve, S., Uzsoy, R.: A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families. Comput. Oper. Res. 34(10), 3016\u20133028 (2007)","journal-title":"Comput. Oper. Res."},{"issue":"2","key":"25_CR9","doi-asserted-by":"publisher","first-page":"256","DOI":"10.1287\/opre.48.2.256.12386","volume":"48","author":"S Martello","year":"2000","unstructured":"Martello, S., Pisinger, D., Vigo, D.: The three-dimensional bin packing problem. Oper. Res. 48(2), 256\u2013267 (2000)","journal-title":"Oper. Res."},{"key":"25_CR10","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4471-5352-8_7","volume-title":"Supply Chain Strategies, Issues and Models","author":"M Mathirajan","year":"2014","unstructured":"Mathirajan, M., Gokhale, R., Ramasubramaniam, M.: Modeling of scheduling batch processor in discrete parts manufacturing. In: Ramanathan, U., Ramanathan, R. (eds.) Supply Chain Strategies, Issues and Models. Springer, London (2014). https:\/\/doi.org\/10.1007\/978-1-4471-5352-8_7"},{"issue":"9","key":"25_CR11","doi-asserted-by":"publisher","first-page":"1038","DOI":"10.1007\/s00170-004-2452-5","volume":"28","author":"M Mathirajan","year":"2006","unstructured":"Mathirajan, M., Sivakumar, A.I.: Minimizing total weighted tardiness on heterogeneous batch processing machines with incompatible job families. Int. J. Adv. Manuf. Technol. 28(9), 1038\u20131047 (2006)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"9\u201310","key":"25_CR12","doi-asserted-by":"publisher","first-page":"990","DOI":"10.1007\/s00170-005-2585-1","volume":"29","author":"M Mathirajan","year":"2006","unstructured":"Mathirajan, M., Sivakumar, A.I.: A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. Int. J. Adv. Manuf. Technol. 29(9\u201310), 990\u20131001 (2006)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"6","key":"25_CR13","doi-asserted-by":"publisher","first-page":"583","DOI":"10.1007\/s10951-010-0222-9","volume":"14","author":"L Monch","year":"2011","unstructured":"Monch, L., Fowler, J.W., Mason, S.J., Dauzere-Peres, S.: A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Sched. 14(6), 583\u2013599 (2011)","journal-title":"J. Sched."},{"key":"25_CR14","first-page":"112","volume":"7","author":"M Ramasubramanian","year":"2010","unstructured":"Ramasubramanian, M., Mathirajan, M., Ramachandran, V.: Minimizing makespan on a single heat-treatment furnace in steel casting industry. Int. J. Serv. Oper. Manag. 7, 112\u2013142 (2010)","journal-title":"Int. J. Serv. Oper. Manag."},{"key":"25_CR15","first-page":"271","volume":"3","author":"M Ramasubramanian","year":"2011","unstructured":"Ramasubramanian, M., Mathirajan, M.: Heuristic algorithms for scheduling heat-treatment furnace of steel-casting foundry manufacturing. Int. J. Adv. Oper. Manag. 3, 271\u2013289 (2011)","journal-title":"Int. J. Adv. Oper. Manag."},{"key":"25_CR16","doi-asserted-by":"crossref","unstructured":"Ramasubramaniam, M., Mathirajan, M.: A mathematical model for scheduling a batch processing machine with multiple incompatible job families, non-identical job dimensions, non-identical job sizes, non-agreeable release times and due dates. In: 2013 International Conference on Manufacturing, Optimization, Industrial and Material Engineering (MOIME 2013) (2013)","DOI":"10.1088\/1757-899X\/46\/1\/012013"},{"issue":"1","key":"25_CR17","doi-asserted-by":"publisher","first-page":"133","DOI":"10.2507\/IJSIMM15(1)CO1","volume":"15","author":"L Su","year":"2016","unstructured":"Su, L., Qi, Y., Jin, L.: Integrated batch planning optimization based on fuzzy genetic and constraint satisfaction for steel production. Int. J. Simul. Modell. 15(1), 133\u2013143 (2016)","journal-title":"Int. J. Simul. Modell."},{"issue":"12","key":"25_CR18","doi-asserted-by":"publisher","first-page":"1621","DOI":"10.1016\/S0305-0548(01)00031-4","volume":"29","author":"CS Wang","year":"2002","unstructured":"Wang, C.S., Uzsoy, R.: A genetic algorithm to minimize maximum lateness on a batch processing machine. Comput. Oper. Res. 29(12), 1621\u20131640 (2002)","journal-title":"Comput. Oper. Res."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Towards Smart Production Management Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-29996-5_25","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,13]],"date-time":"2024-03-13T18:06:10Z","timestamp":1710353170000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-29996-5_25"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030299958","9783030299965"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-29996-5_25","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"24 August 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Austin, TX","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"USA","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"1 September 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"5 September 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2019a","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}